Beruflich Dokumente
Kultur Dokumente
0
Fundamentals Ed 1
D67340GC10
Edition 1.0
December 2010
I
SECTION I
Overview and
Creating a Project
Project Management Life Cycle
Understanding Data in P6
Overview and Navigation
Creating a Project
Creating a Work Breakdown Structure
Adding Activities
1
Project Management Life Cycle
Objectives
● Windows-based
● Enterprise-wide project
and resource
management
● Optimized for very large
projects
● Optional module when
installing P6
Other Applications
● Progress Reporter
○ Timekeeping and resource communication
● P6 Analytics
○ Built on combination of P6 Reporting Database and Oracle
Business Intelligence (OBI)
○ Interactive dashboards
○ Reporting
● P6 Integration API and Web Services
○ Enables developers to create programs to integrate P6 with
other products and generate reports.
Enterprise Project Structure (EPS)
● Enterprise data
○ Available to all projects across an organization.
○ Provides global standards and structure necessary for
centralized project and resource management.
○ Defined and maintained by administrator.
● Project-specific data
○ Available only to the project in which it is defined.
○ Usually defined by project managers.
● Some data can be both enterprise and project-specific.
Enterprise Data
WBS of the HRSYS project, which you will use throughout this
course.
6
Adding Activities
Objectives
Laborer X W X W X
Engineer W X W W W
High-Capacity Crane X X W W X
W = work day X = nonwork day
Laborer X W X W X
Engineer W X W W W
High-Capacity Crane X X W W X
Laborer X W X W X
Engineer W X W W W
High-Capacity Crane X X W W X
Question
A
First Activity
B
Second Activity
A
First Activity
B
Second Activity
A
First Activity
B
Second Activity
A
First Activity
B
Second Activity
Activity B can start after activity A finishes and seven days have
passed.
A
First Activity
FS
7d
B
Second Activity
Example: After the concrete floor is poured and cures for seven
days, we can begin constructing the walls.
Start to Start with Lag
A
First Activity
SS 3d
B
Second Activity
1 5
11 25
1 10
Backward Pass
6 10
11 25
1 10
Total Float
Critical Path
Must Finish By Date
Formulas:
Early Start + Duration - 1 = Early Finish
Late Finish - Duration + 1 = Late Start
Late Start - Early Start = Total Float
Question
Formulas:
Early Start + Duration - 1 = Early Finish
Late Finish - Duration + 1 = Late Start
Late Start - Early Start = Total Float
1
Assigning Constraints
0
Objectives
Backward Pass
Mandatory Mandatory
Start Finish
Forward Pass
11
Customizing Activity Views
Objectives