Fishbones Stimulation Technology

Connect your reservoir with simplicity, accuracy and efficiency

Winner Gullkronen 2016


New Venture of the year
Winner OTC 2015
Spotlight on New Technology
Winner ONS 2014
SME Innovation award
Norwegian Sea - July 2015

“This is the
easiest drilling
operation I’ve
experienced”

-Otto Vabø,
Driller, Odfjell
Global footprint
JCR North Fishbones presence
Sea chalk

Beijing
Stavanger

Tehran
Houston Kuwait
Doha
Cairo
Abu Dhabi
Dammam
Muscat
Dubai

Kuala Lumpur

Jakarta

Brisbane
Benefits

• Increase reservoir exposure in low


permeability reservoirs
• Connect layered reservoirs
• Bypass permeability barriers
• Connect to natural fractures
• Connect with sweet spots and lenses
• Accurately stimulate zones
• Bypass damaged zone
• Reduce drawdown and reduce
coning effects
• Reduce HSE exposure
Product portfolio

Fishbones Jetting Fishbones Drilling


Carbonates All formations including
Coal bed methane sandstone and
Oil sands basement

Other Products:
Backbone Anchor - Fishbones Shoes – Catcher Screen – Fishbasket
Drilling activation steps

1. Before activation 2. Drill through disc

3. Entering the formation 4. Drilling


3. Entering the formation 4. Drilling (ROP)
First installation, Vertical CBM Well
Sumatra, Indonesia
Case study
Fishbones Jetting brings on the oil from well that never previously flowed
CASE STUDY

• December 2016 installation


• Middle East naturally fractured limestone formation
~20-200mD matrix permeability, 20-40% porosity

• Existing well, acid stimulated three times prior


• Well would not flow despite stimulation efforts
• Acid treatments resulted in overgauge hole
• Water zones above and below
• Low fluid level (500m TVD)
Naturally fractured limestone

7” 23# 971m MD 1075m MD

6.5” –
660m TVD 1188m MD
7.3” OH
913m MD
Case study
Fishbones Jetting brings on the oil from well that never previously flowed

• Installation went according to plan


• 220 bbls of 15% HCl blend pumped
• Well now naturally flows @ average
300 BPD gross, 60 BPD net
• Operator planning next well
Case study
Carbonate installation increases PI 30X
CASE STUDY

• JCR installation #1, April 2014


• Tight limestone formation in the Austin Chalk, Texas
+/-5% porosity, +/-0.5mD permeability

• Horizontal well, 6.5” open hole


• 15 ea. Fishbones Jetting subs
• 60 laterals created, 5 hrs total pumping time
• SPE-171804
7 5/8”
29.7#

Austin Chalk B Bench


10,250’ TVD
10,531’ MD
11,355’ MD
6 ½”
open hole

Austin Chalk A Bench

Ash layer
Results
2.5 years sustained increased production after Fishbones stimulation

"The fact we even saw


communication from an
offset well (B zone) to the
Fishbones well (A zone)
indicates that some of the
Fishbone needles likely found
their way up into the B zone
to establish a conduit.“,

Duane Wagner,
Geologist, EnerVest.

Apr 2014 Sep 2016


Case Study
Fishbones Drilling installation in subsea well
CASE STUDY

• Statoil, Offshore Norway, July 2015


• New well in tight sandstone formation
• 2012m / 6600ft horizontal section
• 8.5” open hole with 5.5” liner
• 48 ea. Fishbones Drilling subs – 144 laterals
• SPE-180390
Installation

Shoe assembly Fishbones Drilling sub inspection Backbone anchor RIH


Well Schematic
Key value drivers

• Accurate stimulation – Risk of fracturing into gas zone below with conventional fracturing
• Internal barriers in reservoir – Need to be penetrated for increased reservoir contact
• Sand strength – Competent and consolidated sandstone requiring no sand control
• Low risk - The downside risk assessed to be limited
Simfish reservoir simulator

• Developed by Fenix Consulting Delft


• Uses Sintef MRST simulator
• Fishbones vs. Open hole
• Estimates rates, PI increase and
incremental production
• Producers and injectors
• Oil, dry gas and water injectors

• Generates Eclipse compatible


wellbore geometry
Fishbones Work process

Initial contact/meeting

Client to fill in
Well Information sheet

Client to provide core


samples for testing if
Fishbones evaluates deemed needed
information
Fishbones performs core
sample testing and report

Fishbones develops Fishbones technical / Fishbones delivery,


Client Purchase
technical solution if commercial proposal to Well planning assembly and
Order
project is feasible client installation
Thank you