TOPIC OBJECTIVES
Scenario
Assign Cost Center 5217000 (R&T) to Profit Center 6100 (R&T)
Prerequisites
A cost center and profit center must exist.
PROCEDURAL STEPS
Tip: You can use alternatively transaction KS02 – Change Cost Center, assuming
you have the right authorization.
Maintenance
Material Fixed Asset Order
Internal
Sales Order Order
Process Project
Order CO Cost Object
Production
Order
Perform the following steps of how to Assign Profit Center to a Cost Center using the
information below:
Menu Path: SAP Menu Accounting Controlling Profit Center Accounting Master
Data Current Settings S_ALR_87004478 - Assignment: Cost Center
5. Click Save .