Beruflich Dokumente
Kultur Dokumente
SL.# DESCRIPTION
A-3 Flow rate through the piping system to the farthest point.
A-5 Conclusion of the hydrolic calculations for potable water booste pumps.
B-3 Flow rate through the piping system to the farthest point.
B-5 Conclusion of the hydrolic calculations for flush water booste pumps.
Booster pump capacity 324.0 gpm ( Assuming three pumps with 70 gpm )
73.55 m3/h
20.43 l/s
Shower
Laundry
Bath tub
Water Bidet
Janitor Sink
Service sink
Kitchen sink
Hose for W.C
3 5 10 1.5 4 1 1 4 4 4 3 2 2 2 2 5 10 Total
PROJECT NAME : RUMAH SAKIT UNGARAN
T.Fix.
p-o
Total
0 0 0.8 0 0 0 0 0 0 0 1.4 1 0 0 2 0
Flow rate through the piping system to the farthest point
0 0 0 0 0 0 0 0 1 0 1 0 0 0 27 0 Add
T.Fix.
o-n
Total
0 0 0.8 0 0 0 0 0 1 0 2.4 1 0 0 29 0
0 0 0.8 0 0 0 0 0 1 1 0 Add
T.Fix.
Total
n-m
0 0 1.6 0 0 0 0 0 1 0 2.4 2 1 0 29 0
0 0 0.8 0 0 0 0 1 2 1 0 Add
T.Fix.
m-l
Total
0 0 2.4 0 0 0 0 0 2 0 2.4 4 2 0 29 0
0 0 0.8 0 0 0 2 4 2 0 Add
l-k
T.Fix.
Total
0 0 3.2 0 0 0 0 0 4 0 2.4 8 4 0 29 0
0 0 0.8 0 0 0 0 2 4 2 0 Add
k-j
T.Fix.
Total
0 0 4 0 0 0 0 0 6 0 2.4 12 6 0 29 0
0 0 0.8 0 0 0 0 2 4 2 0 Add
j-i
T.Fix.
Total
0 0 4.8 0 0 0 0 0 8 0 2.4 16 8 0 29 0
0 0 0 0 0 0 0 2 0 0 4 2 0 0 0 Add
T.Fix.
i-h
Total
0 0 4 0 0 0 0 0 10 0 2.4 20 10 0 29 0
0 0 0 0 0 0 5 0 0 0 Add
T.Fix.
h-g
Total
0 0 4 0 0 0 5 0 10 0 2.4 20 10 0 29 0
0 0 0 0 0 0 10 20 10 0 0 0 Add
T.Fix.
g-f
Total
0 0 4 0 0 0 5 0 20 0 2.4 40 20 0 29 0
0 0 0 0 0 0 10 20 10 0 0 0 Add
T.Fix.
f-e
Total
0 0 4 0 0 0 5 0 30 0 2.4 60 30 0 29 0
0 0 0 0 0 0 20 39 20 0 0 0 Add
T.Fix.
e-d
Total
0 0 4 0 0 0 5 0 50 0 2.4 99 50 0 29 0
0 0 4 0 0 0 6 45 93 48 0 6 0 Add
T.Fix.
d-c
Total
0 0 0 0 0 0 5 50 99 50 0 3 0 Add
T.Fix.
c-b
Total
T.Fix.
b-a
Total
Accumulative Pressure
ID Pipe Inner diameter
RE Reynolds number
DN Nominal diameter
V Mean Velocity
GH Static head
1.0 Multimedia filter
DH Total loss
Q Flow rate
2.0 Strainer
0.5 reducer
0.9 tee
no. DN mm m mm GPM l/s 1/1 m m/s 1/1 1/1 m m m m m m
A TO B 110 PVC 93.6 8 0.01 364 22.9 1 0 0 1 0 1 4 0 6.1 3.3309 311772.63 0.0154 9.31 0.74 3.449 4.19 4.19 4.194
B TO C 110 PVC 93.6 27 0.01 300 18.9 1 1 1 1.4 0 2.74601 257026.52 0.01584 6.5 1.76 0.538 2.29 2.29 6.488
C TO D 90 PVC 76.6 10 0.01 242 15.3 1 0 1 0 1.1 0 3.31317 253789.01 0.01605 11.7 1.17 0.615 1.79 1.79 8.276
D TO E 90 PVC 76.6 11 0.01 162 10.2 0 1 1 1.4 0 2.22019 170066.44 0.01705 5.59 0.62 0.352 0.97 0.97 9.243
E TO F 75 PVC 63.8 20 0.01 127 7.99 1 1 1 1.7 0 2.49807 159377.1 0.01739 8.67 1.73 0.541 2.27 2.27 11.52
F TO G 63 PVC 53.6 6 0.01 107 6.74 1 1 1.4 0 2.98636 160069.02 0.01756 14.9 0.89 0.636 1.53 1.53 13.05
G TO H 63 PVC 53.6 3.5 0.01 87 5.48 1 0.9 2.42795 130138.38 0.01813 10.2 0.36 0.27 0.63 0.63 13.67
H TO I 50 PVC 42.6 7 0.01 83 5.23 1 3 1 1 2.5 3.66691 156210.35 0.0179 28.8 2.02 1.713 3.73 3.73 17.4
I TO J 40 PVC 34 3.5 0.01 50 3.14 3 1 3.2 3.45559 117490.05 0.01897 34 1.19 1.948 3.14 3.14 20.54
J TO K 40 PVC 34 3.5 0.01 75 4.72 2 1.8 5.20143 176848.48 0.01795 72.8 2.55 2.482 5.03 5.03 25.57
K TO L 40 PVC 34 3.5 0.01 69 4.37 2 1.8 4.81285 163636.75 0.01812 62.9 2.2 2.125 4.33 4.33 29.9
L TO M 32 PVC 27.2 3.5 0.01 64 4.02 2 1 2.3 6.91291 188031.27 0.01823 163 5.71 5.602 11.3 11.3 41.21
M TO N 25 PVC 21.2 1.5 0.01 60 3.79 1 1 2 1 2.8 10.7371 227626.4 0.01845 511 7.67 16.45 24.1 24.1 65.33
N TO O 25 PVC 21.2 2 0.01 58 3.64 1 0.9 10.3088 218545.56 0.01851 473 9.46 4.875 14.3 14.3 79.67
O TO P 20 PVC 17 2.5 0.01 16 0.99 3 1 1.4 4.3521 73985.703 0.02151 122 3.05 1.352 4.4 4.4 84.07
J = l . V² / ( 2 g D ) ………..…………………………………………………………….. (3)
1 k 2.51
= - 2 x log [ + )
sqr(l) 3.7 x D Re x sqr( l )
RE = V x D / n …………………………………………………………………………. ( 5 )
V = Q/A ………………………………………...………………………………………. ( 6 )
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.094 311772.6 x sqr( l )
l= 0.01540
HS2 = SUM ZE . V ² / ( 2 . g )
3.3309 X 3.3309
HS(2) = SUM ZE.x V² / ( 2 g ) = 6.1 x = 3.4495 m
2 x 9.81
RMC
AL-RASHID & AL-MANGOUR CO
( 1 ) WATER DEMAND
Prepared By Checked By