Beruflich Dokumente
Kultur Dokumente
PUBLICATION
RT-650
NO: 17730-214
SUBJECT: Service Instructions RT-650
DATE: March 1993 REVISION: A
CONTENTS
Item Subject Page
1 Introduction 2
2 Important Safety Notice 2
3 Alignment 2
4 RT-650 Series Description 2-3
5 Tandem Articulation 4
6 Tandem Cross Member 4
Recommendation
7 Preventive Maintenance 4-9
8 Major Rebuild Procedure 9-23
9 Tightening Torque Specification Chart 24
HENDRICKSON
2
TECHNICAL
PUBLICATION
17730-214
3
TECHNICAL
PUBLICATION
17730-214
Subject 5
TANDEM ARTICULATION
Subject 7
PREVENTIVE MAINTENANCE
4
TECHNICAL
PUBLICATION
17730-214
Subject 7 (Continued) Spring Eye Pin and Bushing: To check for spring eye
PREVENTIVE MAINTENANCE bushing wear, a block of wood can be placed on the
spring and, with a pry bar, attempt to lift the spring
WARNING: hanger and frame as shown in Figure 6. Alternately, and
DO NOT USE HEAT AS THIS IS A HEAT TREATED with an empty chassis and brakes applied, attempt to
PART. rock the chassis back and forth while observing the
spring eye. In either case, if 1/8" or more movement is
#1 Spring Hanger: (Double lack bolt design). Check noted, the bushing and pin should be replaced. This
tightening torque lack bolt locknuts. If looseness of this also could indicate a broken spring eye and spring is
connection has resulted in pin hole wear, replace the connected to the spring hanger through the wrapper eye
hanger. of the second leaf. In this case, the main leaf or com-
plete spring should be replaced immediately.
# 1 Spring Hanger: (Draw key design). Inspect the pin
hole in the outboard leg of the hanger for wear or elon- SAFETY NOTE: USE CAUTION WHEN APPLYING
gation. Wear at this point requires hanger replacement or THESE TECHNIQUES SO THAT PERSONAL SAFETY
premature fracture of the spring hanger pin may occur AND VEHICLE SAFETY ARE NOT JEOPARDIZED.
with possible separation of components and loss of
vehicle control. When replacing the spring eye bushing, the split
must be positioned at the top of the spring eye as shown
#2 Spring Hanger: (Costing cam surface design). in Figure 7.
Inspect the cam surface for wear due to high mileage.
Also inspect the outside legs for wear which can be
caused by worn spring eye bushings. Excessive wear at
either point requires hanger replacement.
5
TECHNICAL
PUBLICATION
17730-214
Subject 7 (Continued)
PREVENTIVE MAINTENANCE
6
TECHNICAL
PUBLICATION
17730-214
7
TECHNICAL
PUBLICATION
17730-214
Subject 7 (Continued) the bushings. Worn center bushings will allow increased
PREVENTIVE MAINTENANCE lateral movement of the axles on turns and allow the
inside walls of the tires to rub on the suspen-
ing on the top side, the lower side of the rubber is sion spring hangers. This is a warning that the center
slightly relieved, allowing the rubber to move inward, bushings should be replaced before serious tire dam-
and a gap appears. age results.
The spring and saddle assemblies are attached to
Spring Assembly: Inspect all leaves and spring clips for the center bushings of each equalizing beam with two
cracks or damage. We recommend that high mileage saddle caps. Each cap clamps the center bushing inner
springs (for your type of operation) with one or more metal to the saddle through studs in the saddle legs. The
leaves broken below the #2 leaf be replaced with a saddle caps must be installed so that there is an even
genuine Hendrickson Suspension spring assembly of the gap between the caps and the base of the saddle legs as
same part number. Main and wrapper leaves are shown in Figure 13. If they are not installed evenly, they
normally available as service replacements. The spring may become deformed, resulting in bent studs or dam-
part number is stamped on the spring clips. We also aged saddle cap stud threads.
recommend that both springs be replaced to insure even
spring deflection. All Hendrickson Suspension springs Bronze Beam Center Bushings: As shown in Figure
are made to rigid specifications and each leaf is shot 14, are recommended for use on vehicles negotiating
peened for long life. To assure compatibility and func- frequent tight turns or backing into position such as
tionality as a suspension system, genuine Hendrickson dump, transit mix, and refuse operations.
Suspension springs should be specified. The lube fitting is located on the inside center hub
area of the equalizing beam. Pressure lubricate with
Rubber Beam Center Bushings: The beam center standard chassis lube until clean grease exits on both
bushings control the lateral movement of the axles dur- sides of the beam center hub. The rear of the chassis
ing cornering. The service life of the rubber center bush- should be raised to relieve load on the bushings to allow
ings depends on the style of operation. Normal wear is the proper flow of lubricant around the bushings. The
evidenced by the rubber shredding from each end of interval of lubrication must be determined by the user
taking into consideration the style of operating condi-
tions in which the vehicle is used.
8
TECHNICAL
PUBLICATION
17730-214
Subject 7 (Continued) Rubber Bushed Torque Rods: The length of the torque
PREVENTIVE MAINTENANCE rods is determined by the truck manufacturer for opti-
mum drive line angles. The torque rods control these
Original factory installations of bronze center angles and also absorb driving and braking forces. The
bushings may have only one thrust washer on each side mounting brackets at the axle ends of the torque rods are
of each beam center hub. Often there is room for addi- furnished and welded into position on the axle housings
tional thrust washers. Also, there may be wear to the by the axle manufacturer.
beam hub or the inside of the saddle legs. We recom- The torque rods, as shown in Figure 15, have
mend that in all cases additional washers be installed attaching ends designated “straddle mount” and
until the gap is less than the thickness of one thrust “tapered stud.”
washer, i.e., install as many thrust washers as will fit. Straddle mount torque rod end attaching fasteners
Operating a vehicle with an insufficient number of thrust are furnished by the vehicle manufacturer. It is important
washers may reduce the service life of the bronze that the tightening torque of the locknuts be checked
bushings, and may allow enough free side movement during preventive maintenance service. Follow the
between the saddles and the beams to affect vehicle vehicle manufacturer’s specifications for tightening
handling and steering “feel” by the operator. torque values.
Bronze center bushing wear can be checked by
raising the saddle with a jack. Saddle movement of NOTE: Hendrickson Suspension recommends Grade 8
.125" or more before the beam raises indicates exces- bolts and Grade C locknuts be used for all straddle
sive wear, and the bushing should be replaced. mount torque rod attachments.
Beam Center Cross Tube: The beam center cross tube, Tapered stud torque rod locknuts also should be
as shown in Figure 14, connects the two equalizing checked. The tightening torque is 175 to 225 foot
beams through the inner metals of the beam center pounds.
bushings. This tube restricts the side movement of the All torque rods can be inspected for looseness, or
axles on turns. torn or shredded rubber. With brakes applied, slowly
The cross tube has clearance to float in the inner rock an empty vehicle with power while a mechanic
metals of the center bushings. In cornering it is clamped visually checks the action at both ends. Or with the
in position, maintaining suspension alignment. The vehicle shut down, a lever check can be mode with a
length of the cross tube will allow side float of approxi- long pry bar placed under each rod end and pressure
mately 2". For this reason, the cross tube will appear applied.
polished at each end where it enters into the center Whether the ends ore straddle mount or tapered
bushing inner metal. This is normal. stud, they can be renewed by pressing out the worn end
A cross tube very seldom requires replacement, and installing a cartridge style replacement. A two-piece
usually only when it has been bent, possibly due to hit- torque rod is also available to cut and weld to the
ting an unseen object. A bent cross tube will cause desired length.
misalignment of the axles, and must be changed imme-
diately to eliminate abnormal tire wear. Subject 8
MAJOR REBUILD PROCEDURE
Experience in servicing Hendrickson RT-650 series
suspensions indicates that when a major overhaul is
required, the tandem axles with wheels and tires, and
the equalizing beams should be removed as a complete
unit as shown in Figure 16. However, the torque rods
and other components may be removed separately as
may be necessary.
Block the tires of the front steering axle and both
tandem axles to prevent vehicle movement.
9
TECHNICAL
PUBLICATION
17730-214
10
TECHNICAL
PUBLICATION
17730-214
11
TECHNICAL
PUBLICATION
17730-214
12
TECHNICAL
PUBLICATION
17730-214
Subject 8 (Continued)
MAJOR REBUILD PROCEDURE
13
TECHNICAL
PUBLICATION
17730-214
Subject 8 (Continued) For double lock bolt #1 spring hangers, rotate the
MAJOR REBUILD PROCEDURE pin using the slot to align the key ways and assemble
the lock bolts, washers and locknuts as shown in Fig-
Install pin roller assembly, if so equipped, to #2 ure 25.
spring hanger before spring assembly is assembled as
shown in Figure 27. See Figure 28 and follow instruc-
tion for draw key installation. Install lube fitting and
pressure lubricate until lubricant appears at both ends of
the pin roller.
14
TECHNICAL
PUBLICATION
17730-214
15
TECHNICAL
PUBLICATION
17730-214
Subject 8 (Continued) Use a 5 1/4'’ O.D. by 10" long piece of steel tubing
MAJOR REBUILD PROCEDURE to remove and install the bushings.
Center the pushing tool on the outer metal of the
RUBBER END BUSHING REMOVAL rubber bushing and push the bushing out of the beam
Beam end rubber bushings can be removed with shop bore.
made tools. After removing the bushings, thoroughly inspect the
Begin by cutting the protruding rubber oft one side beam bores.
of each beam end bushing as shown in Figure 30. This
permits the pushing tool to contact the outer metal of the BRONZE CENTER BUSHING REMOVAL
bushing. Bronze center bushings can be removed with shop made
A piece of 5 3/4" O.D. by 7" long steel tubing can pushing tools. The procedure is the same as for rubber
be used to remove the rubber end bushings. center bushings, except that the seal on the pushing side
Use a shop press with a capacity of at least 100 of the equalizing beam must be removed first. The center
tons. Place the equalizing beam in the shop press with sleeves of the bronze bushing assembly and the cross
the beam end bore squarely supported on the press bed tube can be removed by hand.
for safety, and to avoid bending the equalizing beam. After removing the bushings, thoroughly inspect the
Center the bushing tool on the outer metal of the beam bores.
bushing and push the bushing out of the beam bore.
WARNING:
RUBBER CENTER BUSHING REMOVAL
IF TORCH UNDERCUTTING IS FOUND FROM PREVI-
Before attempting to remove the beam center bushings, OUS REBUSHING, REPLACE WITH A NEW EQUALIZ-
inspect the inside face of each equalizing beam center ING BEAM. DO NOT TAKE THE RESPONSIBILITY FOR
hub. If the outer metal of the center bushing is worn, the POSSIBLE ROAD FAILURE BY REBUSHING A BEAM IN
edge may have mushroomed over the face of the beam THIS CONDITION. FAILURE TO REPLACE AN EQUALIZ-
hub. This material must be removed with a chisel or disc ING BEAM THAT HAS TORCH UNDERCUTTING COULD
sander before the tooling adapters can be positioned for RESULT IN THE FAILURE OF THAT BEAM, LEADING
bushing removal. TO LOSS OF VEHICLE CONTROL AND POSSIBLE PER-
Use a shop press with a capacity of at least 100 SONAL INJURY OR PROPERTY DAMAGE.
tons. Begin by placing the equalizing beam in the shop
press with the beam center bore squarely supported on Clean the bores of the equalizing beams with
the press bed for safety, and to avoid bending the emery cloth, removing any nicks or metal buildup from
equalizing beam. bushing removal.
16
TECHNICAL
PUBLICATION
17730-214
17
TECHNICAL
PUBLICATION
17730-214
Subject 8 (Continued) 1. Clean the bores of the equalizing beams with emery
MAJOR REBUILD PROCEDURE cloth, removing any nicks or metal buildup from
bushing removal.
When pressing new 7" long end bushings into 2. The outer metals of new Hendrickson rubber bush-
beam, they must be offset 1/2" towards the outboard ings may have a phosphate coating which acts as
side of the beam. This is critical for correct fit up in sus- a rust preventive. This coating must be removed
pension. See Figure 34. with emery cloth before installation.
Place the equalizing beam in the shop press with 3. The equalizing beam bore may have a more sub-
the beam bore squarely supported on the press bed for stantial lead chamfer at one end of the bore than
safety, and to avoid bending the equalizing beam. the other. Take advantage of the larger chamfer by
Press in the new bushing. pressing in the new bushing from this end.
4. Support the beam squarely at the bore area to avoid
RUBBER CENTER BUSHING INSTALLATION distortion of the beam bore or bending of the beam.
When installing rubber center bushings the following 5. Lubricate the O.D. of the bushing and I.D. of the
steps will minimize the chance of spoiling a new bush-
ing:
18
TECHNICAL
PUBLICATION
17730-214
Subject 8 (Continued)
MAJOR REBUILD PROCEDURE
19
TECHNICAL
PUBLICATION
17730-214
20
TECHNICAL
PUBLICATION
17730-214
WARNING:
IF THE TIGHTENING TORQUES RECOMMENDED
ABOVE ARE NOT ACHIEVED, METAL SURFACES WILL
WORK AND WEAR THE AXLE BRACKET LEGS, HOLES,
ADAPTERS AND RUBBER BUSHING INNER METALS.
PROPERLY TIGHTENED END CONNECTIONS WILL
ELIMINATE COSTLY REPAIR, DOWNTIME AND POSSI-
BLE SEPARATION OF COMPONENTS AND LOSS OF
VEHICLE CONTROL, PROPERTY DAMAGE OR PER-
SONAL INJURY.
21
TECHNICAL
PUBLICATION
17730-214
22
TECHNICAL
PUBLICATION
17730-214
Subject 8 (Continued) pounds torque. After tightening, rap the bracket with a
MAJOR REBUILD PROCEDURE hammer as shown in Figure 47, and retighten to 175 to
225 foot pounds torque.
5. At 200 foot pounds of initial torque on assembly,
Reset all spring parking brakes on the tandem
using 9200-015 slug wrenches on nuts, tighten
axles and connect the drive shaft to the front of the for-
assembly by moderately hitting wrench with a 4
ward drive axle.
pound hammer near handle end to approximately
Connect all air lines leading to the rear axles and
1/3 of a turn of the nut or 120 degrees rotation. Be
charge the vehicle air system.
sure other wrench on pinned nut is solidly braced to
Remove the blocks at the tires of the front steering
prevent movement. Do not back off nut to install
axle.
cotter pin. If cotter pin holes do not line up, this nut
may be tack welded to the tube. Repeated hammer-
ing beyond this point may be detrimental to this
assembly.
The part number and identification for the tube &
nut assemblies are as follows:
23
TECHNICAL
PUBLICATION
17730-214
Subject 9
TIGHTENING TORQUE SPECIFICATION CHART
HENDRICKSON