Beruflich Dokumente
Kultur Dokumente
Biaya
NO Uraian Pekerjaan Vol Sat Total
Bahan Upah
A Pekerjaan Panel
A.1 Panel PP/LP
1 Panel PP/LP uk.60x40x20 3 bh Rp1,926,000.00 Rp192,600.00 Rp6,355,800.00
2 Magnetic Contactor 40A LCID25M7 (MBO) 2 bh Rp354,473.00 Rp35,447.30 Rp779,840.60
3 MCB 1P 20A 4,5kA Domae 1 bh Rp56,843.00 Rp5,684.30 Rp62,527.30
4 MCB 1P 16A 4,5kA Domae 3 bh Rp56,843.00 Rp5,684.30 Rp187,581.90
5 MCB 1P 10A 4,5kA Domae 4 bh Rp56,843.00 Rp5,684.30 Rp250,109.20
6 MCB 1P 6A 4,5kA Domae 14 bh Rp56,843.00 Rp5,684.30 Rp875,382.20
7 MCB 1P 2A 4,5kA A:2 Domae 1 bh Rp56,843.00 Rp5,684.30 Rp62,527.30
8 Wiring material 1 Lot Rp25,000.00 Rp2,500.00 Rp27,500.00
9 MCB IN dari PK Genset 40A 6kA 1 bh Rp351,000.00 Rp35,100.00 Rp386,100.00
SubTotal Rp8,987,368.50
A.2 Panel Kontrol Genset (PK – G)
1 PK -G 60x40x20 1 bh Rp1,926,000.00 Rp192,600.00 Rp2,118,600.00
2 COS 40 A satuphase 2 pole(MBO) 1 bh Rp150,000.00 Rp150,000.00
3 pilot lamp type LED (indikator PLN & Genset ) + fuse 6 bh Rp100,312.00 Rp6,500.00 Rp640,872.00
4 Busbar + wiring material 1 Lot Rp25,000.00 Rp2,500.00 Rp27,500.00
5 Baby sirine 22V 1 bh Rp700,000.00 Rp70,000.00 Rp770,000.00
6 Relay 1 bh Rp5,000,000.00 Rp500,000.00 Rp5,500,000.00
7 Tombol Reset 1 bh Rp15,000.00 Rp1,500.00 Rp16,500.00
SubTotal Rp9,223,472.00
A.3 Pekerjaan Grounding Elektrikal maks.2 ohm (Panel & PK-G)
1 Jarum spit 2 bh Rp350,000.00 Rp35,000.00 Rp770,000.00
2 pipa gip 1” 3 bh Rp237,573.90 Rp52,974.00 Rp871,643.70
3 Kabel NYA 1 X 2,5 mm² dlm HIC 20 mm (PABX) 6 m' Rp3,375.00 Rp337.50 Rp22,275.00
4 Kabel NYA 1 X 6 mm² dlm HIC 20 mm 6 m' Rp10,125.00 Rp1,012.50 Rp66,825.00
5 BC 50 16 m' Rp41,400.00 Rp4,140.00 Rp728,640.00
6 Bak kontrol 30 x 30 2 bh Rp250,000.00 Rp55,000.00 Rp610,000.00
SubTotal Rp3,069,383.70
B Instalasi Penerangan & stop kontak
1 Kabel feeder dari KWH 1 PLN ke PKG-Genset NYY 3X6 mm² dlm HIC 20 mm 14.5 m' Rp28,500.00 Rp9,975.00 Rp557,887.50
2 Kabel feeder dari KWH 2 PLN ke PKG-Genset NYY 3X6 mm² dlm HIC 20 mm 32 m' Rp22,500.00 Rp7,875.00 Rp972,000.00
3 Kabel feeder dari PKG-Genset ke PP/LP NYY 3X6 mm² dlm HIC 20 mm 10 m' Rp22,500.00 Rp7,875.00 Rp303,750.00
4 Kabel feeder dari KWH 1 PLN ke PP/LP NYY 3X6 mm² dlm HIC 20 mm 24.5 m' Rp22,500.00 Rp7,875.00 Rp744,187.50
5 Kabel feeder dari KWH 2 PLN ke PP/LP NYY 3X6 mm² dlm HIC 20 mm 23 m' Rp22,500.00 Rp7,875.00 Rp698,625.00
6 Lampu SL 23 Watt 67 bh Rp24,480.00 Rp2,500.00 Rp1,807,660.00
7 Fitting Plafond segiempat (craem/putih) 41 bh Rp7,200.00 Rp2,500.00 Rp397,700.00
8 Fitting gantung industri + penggantung GIP 3/4” 16 bh Rp15,000.00 Rp4,500.00 Rp312,000.00
9 Saklar inbow 1 gang S8870 WHI 12 bh Rp14,850.00 Rp3,859.20 Rp224,510.40
10 Saklar inbow 2 gang S 8872 W1 WHI 24 bh Rp17,595.00 Rp3,859.20 Rp514,900.80
11 Exhaust fan dinding merk” KDK” (MBO) 4 bh Rp575,000.00 Rp40,000.00 Rp2,460,000.00
12 Exhaust fan plafond merk” KDK” (MBO) 4 bh Rp645,000.00 Rp40,000.00 Rp2,740,000.00
13 Key tag type 774234 (MBO) 2 bh Rp35,000.00 Rp70,000.00
14 Photocell 6A 250V(MBO) 2 bh Rp25,000.00 Rp50,000.00
15 Microswitch type Z – 15 GW-2B + cover(MBO) 7 bh Rp55,000.00 Rp385,000.00
16 Instalasi penerangan & keytag dg NYM 2X 1,5 mm² dlm HIC 20 mm 69 ttk Rp53,910.00 Rp42,480.00 Rp6,650,910.00
17 Emergency lamp EL 12Ah 18W LED,ON saat tidak ada Power(MBO) 3 bh Rp46,000.00 Rp2,500.00 Rp145,500.00
18 Stop kontak 1 gang 19 bh Rp12,600.00 Rp1,260.00 Rp263,340.00
19 Stop kontak 2 gang 16 bh Rp18,900.00 Rp1,890.00 Rp332,640.00
20 Stop kontak 3 gang 21 bh Rp18,900.00 Rp1,890.00 Rp436,590.00
21 Instalasi stopkontak dg NYM 3X2,5 mm² dlm HIC 20 mm 56 ttk Rp53,910.00 Rp42,480.00 Rp5,397,840.00
SubTotal Rp25,465,041.20
C Pekerjaan AC
1 Bongkar AC dan outdoor AC existing 4 Unit Rp150,000.00 Rp600,000.00
2 Service AC, oudoor AC dan Cleaning 4 Unit Rp250,000.00 Rp1,000,000.00
3 Pas. AC dan outdoor AC eks. Bongkaran 4 Unit Rp150,000.00 Rp4,750,000.00 Rp19,600,000.00
SubTotal Rp21,200,000.00
D Pekerjaan Penyalur petir
1 Jarum Spike (atas) 2 bh Rp350,000.00 Rp35,000.00 Rp770,000.00
2 Tiang pipa galvanis 3/4” Medium A 9 bh Rp195,081.98 Rp52,974.00 Rp2,232,503.78
3 BC 50 41 m' Rp41,400.00 Rp4,140.00 Rp1,867,140.00
4 HIC 20mm + accessories 1 ls Rp350,000.00 Rp35,000.00 Rp385,000.00
SubTotal Rp5,254,643.78
D.1 Pekerjaan Grounding Elektrikal maks.2 ohm (Penangkal Petir)
1 Jarum Spit 2 bh Rp350,000.00 Rp35,000.00 Rp770,000.00
2 Pipa Gip 1” 2 bh Rp195,081.98 Rp52,974.00 Rp496,111.95
3 Bc 50 mm 15 m' Rp41,400.00 Rp4,140.00 Rp683,100.00
4 Bak kontrol 30x30 2 bh Rp250,000.00 Rp55,000.00 Rp610,000.00
SubTotal Rp2,559,211.95
E Pekerjaan Telephone
1 Bobok dinding existing dan finishing ulang – untuk instalasi outlet aiphone 24 m' Rp25,000.00 Rp15,000.00 Rp960,000.00
1 PABX KX-TEM824, 6 CO 16 Ext.Lengkap panel MDF (MBO) 1 Unit Rp50,000.00 Rp50,000.00
2 Outlet telp inbow 1 gang S4817 WHI 14 bh Rp100,312.00 Rp10,031.20 Rp1,544,804.80
3 Pesawat Telephone singleline KX – TS505MXW (MBO) 14 bh Rp50,000.00 Rp700,000.00
4 Instalasi titik telephone dg ITC 2X2X0,6 dlm HIC 20mm 14 bh Rp250,000.00 Rp25,000.00 Rp3,850,000.00
SubTotal Rp7,104,804.80
F Pekerjaan TV
1 Bobok dinding existing dan finishing ulang – untuk instalasi outlet TV 18.4 m' Rp15,000.00 Rp1,500.00 Rp303,600.00
2 Outlet antena S3521 WHI 8 bh Rp34,000.00 Rp3,400.00 Rp299,200.00
3 Feeder kabel coax RG6 dr antena ke booster dlm HIC 20 mm 1 Lot Rp420,000.00 Rp42,000.00 Rp462,000.00
4 Instalasi titik outlet TV coax RG6 dlm HIC 20mm 1 Lot Rp1,200,000.00 Rp120,000.00 Rp1,320,000.00
5 UHF antena 4 bh Rp175,000.00 Rp17,500.00 Rp770,000.00
6 Booster & splitter 8 out 8 bh Rp55,000.00 Rp5,500.00 Rp484,000.00
7 Extend RG6 1,5 m lengkap jack kuningan ( dari outlet ke TV) 16 bh Rp37,500.00 Rp3,750.00 Rp660,000.00
SubTotal Rp4,298,800.00
G Pekerjaan Jaringan Komputer
1 Pas.Kabel jaringan UTP cat 5e (MBO) dlm HIC 20 mm 17 ttk Rp65,000.00 Rp1,105,000.00
2 Pas. Inbow dus 34 bh Rp6,000.00 Rp1,500.00 Rp255,000.00
3 Pengadaan faceplat outlet jaringan eks. Panasonic 17 bh Rp50,000.00 Rp850,000.00
SubTotal Rp2,210,000.00
H Pekerjaan APAR
1 Pas. Apar 5 kg (MBO) 8 bh Rp15,000.00 Rp120,000.00
Sub Total Rp120,000.00
I Pekerjaan Sistem Plumbing
I.1 Pekerjaan Sumur Bor
1 Jet Pump 375 Watt JD Basic 4 1 unit Rp1,071,000.00 Rp107,100.00 Rp1,178,100.00
2 Mobilisasi & demobilisasi peralatan 1 lot Rp374,850.00 Rp374,850.00
3 Pembuatan spul bak & penyediaan lumpur 1 lot Rp750,000.00 Rp75,000.00 Rp825,000.00
4 Pembuatan Pilot hole 2” 8 m' Rp40,635.00 Rp325,080.00
5 Pembuatan Pilot hole 4” 4 m' Rp40,635.00 Rp162,540.00
6 Pipa PVC 2” Abu 2 btg Rp81,413.10 Rp28,494.59 Rp219,815.37
7 Pipa PVC 4” Abu 2 btg Rp191,035.13 Rp66,862.29 Rp515,794.84
8 V-Socket PVC 4 x 3” Abu 4 bh Rp6,500.00 Rp975.00 Rp29,900.00
9 SDL PVC 2” Abu 2 bh Rp9,500.00 Rp1,425.00 Rp21,850.00
10 Strainer 2” 2 bh Rp7,500.00 Rp1,125.00 Rp17,250.00
11 Injuk tali 4 rol Rp55,000.00 Rp5,500.00 Rp242,000.00
12 Pipa PVC AW 1¼” Abu 97.64 btg Rp69,629.63 Rp24,370.37 Rp9,178,159.39
13 Pipa PVC AW 1” Abu 24.41 btg Rp67,844.25 Rp23,745.49 Rp2,235,705.49
14 Dop PVC AW 4” Abu 2 bh Rp6,500.00 Rp650.00 Rp14,300.00
15 Knei PVC AW 1¼” Abu 2 bh Rp6,500.00 Rp650.00 Rp14,300.00
16 Knee PVC AW 1” Abu 2 bh Rp5,500.00 Rp550.00 Rp12,100.00
17 Water mur PVC 1¼” pakai drat 9 bh Rp27,500.00 Rp2,750.00 Rp272,250.00
18 Water mur PVC 1” pakai drat 3 bh Rp20,000.00 Rp2,000.00 Rp66,000.00
19 Tosen klep kuningan 1” + Strainer 3 bh Rp75,000.00 Rp7,500.00 Rp247,500.00
20 Kran Ballvalve 1” 3 bh Rp30,000.00 Rp3,000.00 Rp99,000.00
21 SDL PVC 1¼” 18 bh Rp9,500.00 Rp1,425.00 Rp196,650.00
22 Double nipple galvanish 1” 9 bh Rp17,500.00 Rp2,625.00 Rp181,125.00
23 SDL PVC 1” Abu 9 bh Rp9,500.00 Rp213.75 Rp87,423.75
24 Lem Pipa PVC 2 klg Rp27,500.00 Rp2,750.00 Rp60,500.00
25 Seal tape kw1 1 rol Rp2,250.00 Rp337.50 Rp2,587.50
26 Radar air 2 bh Rp75,000.00 Rp5,000.00 Rp160,000.00
27 Relay 220VAC LY2 + socket 1 set Rp8,000,000.00 Rp800,000.00 Rp8,800,000.00
Subtotal Rp25,539,781.34
I.2 Instalasi Pipa Air GWT
1 Pompa air 150 Watt otomatis Semijet PH151 1 unit Rp450,000.00 Rp45,000.00 Rp495,000.00
2 Tangki GWT 1 unit Rp255,000.00 Rp25,500.00 Rp280,500.00
3 Pipa PVC AW 1” Abu 40.79 m' Rp11,307.38 Rp4,865.40 Rp659,687.49
4 Kran Ballvalve 1” 4 bh Rp30,000.00 Rp3,000.00 Rp132,000.00
5 Fittings (drat kuningan, double niple gip,dll) 1 ls Rp175,000.00 Rp17,500.00 Rp192,500.00
6 Hanger & support 1 ls Rp125,000.00 Rp12,500.00 Rp137,500.00
7 Radar air 3 set Rp62,500.00 Rp9,375.00 Rp215,625.00
8 Kabel NYMHY 2 x 1,5 dlm HIC 20mm 3.5 m' Rp8,500.00 Rp850.00 Rp32,725.00
Subtotal Rp2,145,537.49
I.3 Instalasi Distribusi Air
1 Torn air fiber kapasitas 1000 ltr 2 bh Rp2,745,000.00 Rp150,000.00 Rp5,790,000.00
2 Pipa PVC AW 1½” Abu 97.64 m' Rp11,604.94 Rp4,865.40 Rp1,608,163.75
3 Pipa PVC AW 1½” Abu 24.41 m' Rp11,604.94 Rp4,865.40 Rp402,040.94
4 Pipa PVC AW 1” abu 60.54 m' Rp11,307.38 Rp4,865.40 Rp979,099.80
5 Pipa PVC AW 1” abu 30.27 m' Rp11,307.38 Rp4,865.40 Rp489,549.90
6 Pipa PVC AW ¾” abu 48.82 m' Rp8,926.88 Rp4,865.40 Rp673,338.87
7 Fittings (drat kuningan, double niple gip,dll) 1 ls Rp157,500.00 Rp4,865.40 Rp162,365.40
8 Hanger & support 1 ls Rp225,000.00 Rp4,865.40 Rp229,865.40
9 Kran Ballvalve 1½” 6 bh Rp35,000.00 Rp3,500.00 Rp231,000.00
10 Kran Ballvalve 1” 6 bh Rp30,000.00 Rp3,000.00 Rp198,000.00
11 Kran ballvalve ½” 6 bh Rp25,000.00 Rp2,500.00 Rp165,000.00
12 Double nipple galvanish ½” 2 bh Rp17,500.00 Rp2,625.00 Rp40,250.00
13 L bow galvanish ½” 3 bh Rp32,500.00 Rp4,875.00 Rp112,125.00
14 Nipple slang kuningan ½” 3 bh Rp17,500.00 Rp2,625.00 Rp60,375.00
15 Kran washtafel ½” Y50JRN 1 bh Rp140,000.00 Rp15,000.00 Rp155,000.00
16 Kran sink ½” A10JRN 4 bh Rp22,556.25 Rp6,660.00 Rp116,865.00
Subtotal Rp11,413,039.06
I.4 Instalasi Gas LPG
1 Pipa galvanish ½” 5 m' Rp23,805.00 Rp8,829.00 Rp163,170.00
2 Fittimgs 1 ls Rp175,000.00 Rp2,500.00 Rp177,500.00
3 Hanger & support 1 ls Rp150,000.00 Rp1,500.00 Rp151,500.00
4 Kran gas single ½ 2 bh Rp20,000.00 Rp2,500.00 Rp45,000.00
Subtotal Rp537,170.00
Total Rp129,128,253.81
Fee Pemborong Rp12,912,825.38
Gran Total Rp142,041,079.19
Dibulatkan Rp142,041,000.00
Rencana Anggaran Biaya
(RAB)
Proyek :WSR 36 Madiun
Pekerjaan :bangunan kantor, mess, dan gudang
Lokasi : Madiun - Jawa Timur
Harga Harga
NO URAIAN PEKERJAAN Vol. Sat.
Upah Bahan Satuan
A Pekerjaan Persiapan
1 Keamanan & Koordinasi 1.00 ls 4,800,000 4,800,000
2 Mobilisasi & Demobilisasi 1.00 ls 400,000 200,000 600,000
3 Bedeng kerja & Los kerja 18.00 ls 155,250 1,113,606 1,268,856
4 Pembesihan Area Kerja
a. Stripping lahan 334.80 m² 1,890 1,890
b. Pembersihan bekas kerja ke luar lokasi proyek 200.00 m² 11,025 11,025
5 Air kerja & Listrik Kerja 1.00 ls 1,000,000 1,000,000
6 Pengukuran & Pemasangan Bouwplank -
a. Stight out dengan alat optis/ teodolit 1.00 ls 350,000 350,000
b. Bouwplank 20.00 m' 9,495 84,074 93,569
7 Dokumentasi dan laporan 1.00 ls 1,800,000 1,800,000
Sub Total
B Pekerjaan Bongkaran
1 Bongkaran Lahan Baru ( termasuk menara torn existing ) 1.00 ls 6,500,000 6,500,000
2 Bongkaran Area Mess 1.00 ls 750,000 750,000
3 Bongkaran Area Kantor 1.00 ls 2,250,000 2,250,000
4 Bongkaran Area Gudang 1.00 ls 3,000,000 3,000,000
Sub Total
C Pekerjaan Galian & Urugan
1 Galian pondasi setempat ( P1 ) 41.85 m³ 31,185 31,185
2 Galian pondasi batu kali
a. P2 39.64 m³ 31,185 31,185
b. P3 5.78 m³ 31,185 31,185
c. P4 2.06 m³ 31,185 31,185
3 Galian sloof gantung ( S1 ) 1.58 m³ 31,185 31,185
4 Galian pondasi chain Hoist 1.82 m³ 31,185 31,185
5 Penyemprotan obat anti rayap ( obat anti rayap MBO ) -
a. Galian pondasi setempat ( P1 ) 41.85 m³ 12,000 12,000
b. Galian pondasi batu kali ( P2, P3, P4 ) 47.49 m³ 12,000 12,000
c. Galian sloof gantung ( S1 ) 1.58 m³ 12,000 12,000
d. Urugan leveling bangunan 116.15 m³ 12,000 12,000
e. Dudukan Chain hoist 1.82 m³ 12,000 12,000
6 Urugan pasir tebal 10 cm bawah pondasi & sloof gantung:
a. P1 2.70 m³ 10,080 54,432 64,512
b. P2 3.60 m³ 10,080 54,432 64,512
c. P3 0.68 m³ 10,080 54,432 64,512
d. P4 0.75 m³ 10,080 54,432 64,512
e. S1 0.45 m³ 10,080 54,432 64,512
f. Dudukan Chain hoist 0.36 m³ 10,080 54,432 64,512
7 Urugan tanah 1/3 galian + pemadatan 58.08 m³ 18,900 18,900
8 Urugan tanah + pemadatan
a. Ex galian 116.15 m³ 18,900 18,900
b. Sirtu 8.73 m³ 18,900 18,900
Sub Total
D Pekerjaan Struktur Bawah
1 Lantai Kerja (Tebal 5 cm) beton 1:3:5
a. Pondasi setempat P1 27.00 m² 37,809 23,415 61,224
b. Sloof gantung S2 4.52 m² 37,809 23,415 61,224
2 Pasangan Batu Belah 1:5 + stek Ø8 tiap jarak 2 m -
a. P2 28.89 m³ 97,868 440,091 537,959
b. P3 7.18 m³ 97,868 440,091 537,959
c. P4 3.50 m³ 97,868 440,091 537,959
3 Cor Beton K 225 atau campuran 1:2:3 + Tulangan
a. Pondasi setempat & Stump Kolom ( P1 ) 6.43 m³ 150,950 1,134,404 1,285,353
b. Sloof S1 1.36 m³ 108,182 852,731 960,912
c. Sloof P2 1.69 m³ 108,182 852,731 960,912
d. Sloof P3 0.32 m³ 108,182 852,731 960,912
e. Sloof P4 0.11 m³ 108,182 852,731 960,912
e. Sloof P5 m²
4 Angkur Stump Kolom, L = 80 cm Ø 16 mm + baut atas bawah 48.00 bh 6,408 64,080 70,488
5 Grouting Stump Kolom tinggi 5 cm 48.00 bh 6,408 64,080 70,488
Sub Total
E Pekerjaan Struktur Atas & Atap
1 Frame Baja ( termasuk cat meni )
a. Tiang IWF 250.125.6.9 725.20 kg 5,697 16,618 22,315
b. Tiang IWF 150.75.5.7 384.16 kg 5,697 16,618 22,315
c. Balok IWF 250.125.6.9 1,079.22 kg 5,697 16,618 22,315
d. Rafter IWF 150.75.5.7 683.20 kg 5,697 16,618 22,315
e. Regel 2 CNP 125.50.20.2,3 237.58 kg 5,697 16,618 22,315
2 Sambungan frame ( termasuk cat meni )
a. Detail A
- Base plate 300.175.8 12.00 bh 3,375 22,500 25,875
- Plat pengaku 8 mm 48.00 bh 3,375 22,500 25,875
- Mur baut angkur Ø16 48.00 bh 9,612 64,080 73,692
b. Detail B
- End plate 32.00 bh 3,375 22,500 25,875
- Baut HTB Ø1/2" sambungan IWF 192.00 bh 975 6,500 7,475
c. Detail C
- End plate 170.75.8 ( IWF 150.75.5.7 ) 8.00 bh 3,375 22,500 25,875
- Baut HTB Ø 1/2" sambungan rambudan rafter IWF 150.75.5.7 32.00 bh 975 6,500 7,475
- End plate 200.120.6 ( Regel 2 CNP 125.50.20.2,3 ) 12.00 bh 3,375 22,500 25,875
- Baut HTB sambungan regel 2 CNP 125 48.00 bh 975 6,500 7,475
- End plate 300.75.8 8.00 bh 3,375 22,500 25,875
- Pot IWF 150.75.5.7 56.00 kg 5,697 16,618 22,315
- Baut HTB sambungan IWF 150 64.00 bh 3,375 6,500 9,875
d. Detail D
- End plate 350.75.8 8.00 bh 3,375 22,500 25,875
- Pot IWF 150.75.5.7 56.00 kg 5,697 16,618 22,315
- Baut HTB sambungan IWF 150 32.00 bh 975 6,500 7,475
3 Plat Stiftener t = 6 mm (termasuk cat meni )
a. Tiang IWF 250.125.6.9 3.75 kg 5,697 16,618 22,315
b. Tiang IWF 150.75.5.7 1.80 kg 5,697 16,618 22,315
c. Balok IWF 250.125.6.9 4.50 kg 5,697 16,618 22,315
d. Rafter IWF 150.75.5.7 3.60 kg 5,697 16,618 22,315
4 Dudukan Gording Plat segitiga uk 125.75.8 atau besi siku 50.50.5 48.00 bh 5,697 16,618 22,315
( termasuk cat meni )
5 Gording dan Lisplank C 125.50.20.2,3 (termasuk cat meni ) 850.94 kg 5,697 16,618 22,315
6 Trekstang Ø 10 mm (termasuk cat meni ) 33.29 kg 668 12,402 13,070
7 Water mur 16 mm 8.00 bh 5,000 75,000 80,000
8 Ikatan angin Ø 16 mm ( termasuk cat meni ) 66.06 kg 668 12,402 13,070
9 Modifikasi atap existing ( sambungan dengan atap bangunan baru ) 15.70 m' 37,500 250,000 287,500
10 Thermal insulator
a. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di
bawah gording) 382.84 m² 2,250 15,000 17,250
b. Aluminium tape 319.00 m' 225 1,500 1,725
c. Pelat strip zincalume 0.45 mm untuk sambungan insulator di bawah
37.50 m' 1,275 8,500 9,775
gording ( termasuk cat meni )
11 Penutup Atap 1 ( A1 )
a. Talang zincalume t=0.35 mm 31.38 m' 23,256 51,467 74,723
b. plat strip 20.2 / 60 cm 60.00 kg 5,625 37,500 43,125
c. corong talang 7.00 bh 3,750 25,000 28,750
d. Silent tipe Outdoor u/ sambungan talang horizontal 4.00 m' 1,500 15,000 16,500
e. Atap Ex.Union metal MP Deck 0.35mm TCT 171.90 m² 23,256 51,467 74,723
f. Atap fiberglass t = 2 mm gelombang sesuai atap 19.52 m² 9,500 95,000 104,500
g. Paranet hitam ( di pasang di atas atap fiber glass ) 19.52 m² 7,000 70,000 77,000
h. Nok atap zincalum 0,35 mm TCT (m¹) di crimping (ujung nok dibentuk 23,256 51,467 74,723
15.70 m'
gelombang atap)
i. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 58.00 m' 3000 30000 33,000
12 Turbin Ventilator
a. Turbine ventilator 4.00 bh 275,000 2750000 3,025,000
b. Flashing zincalume u/ turbin 4.00 bh 10,888 108,881 119,769
c. Ram kawat u/ bagian bawah Turbin 4.00 bh 6,600 66,000 72,600
d. Pelubangan atap 4.00 ls 10,500 105,000 115,500
13 Pekerjaan Atap 2 ( A2 ) -
a. Rangka UNP 125.65.6.8 1,407.00 kg 5,697 16,618 22,315
b. Gording CNP 125.50.20.2,3 482.40 kg 5,697 16,618 22,315
c. Penutup atap MP Deck 0.35mm TCT 41.98 m² 23,256 51,467 74,723
d. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di
bawah gording) 83.97 m² 2,250 15,000 17,250
e. Atap fiberglass t = 2 mm gelombang sesuai atap ditambah paranet 4.10 m² 9,500 95,000 104,500
f. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 18.00 m' 3,000 30,000 33,000
g. Talang sanlon 9.00 m' 10,950 31,839 42,789
14 Pekerjaan Atap 3 ( A3 ) -
a. Bongkar atap existing 82.43 m² 1,400 1,400
b. Atap Ex.Union metal MP Deck 0.35mm TCT 82.43 m² 23,256 51,467 74,723
c. Thermal insulator Ex Zeltech ZT 01-B 2 82.43 m² 2,250 15,000 17,250
d. Perbaikan plafond existing akibat pekerjaan. 1.00 ls 250,000 250,000
15 Pekerjaan Atap 4 ( A4 ) -
a. Rangka UNP 125.65.6.8 612.65 kg 5,697 16,618 22,315
b. Gording CNP 125.50.20.2,3 706.45 kg 5,697 16,618 22,315
c. Atap Ex.Union metal MP Deck 0.35mm TCT 40.33 m² 23,256 51,467 74,723
d. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di 80.66 m² 2,250 15,000 17,250
bawah gording)
e. Atap fiberglass t = 2 mm gelombang sesuai atap +paranet 8.30 m² 9,500 95,000 104,500
f. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 13.18 m' 3,000 30,000 33,000
g. Talang sanlon 13.18 m' 10,950 31,839 42,789
16 Pekerjaan Atap 5 ( A5 ) -
a. Rangka UNP 125.65.6.8 485.21 kg 5,697 16,618 22,315
b. Gording CNP 125.50.20.2,3 661.96 kg 5,697 16,618 22,315
c. Atap Ex.Union metal MP Deck 0.35mm TCT 38.43 m² 23,256 51,467 74,723
d. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di 76.87 m² 2,250 15,000 17,250
bawah gording)
f. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 9.93 m' 3,000 30,000 33,000
g. Talang sanlon 5.20 m' 10,950 31,839 42,789
17 Pekerjaan Atap 6 ( A6 ) -
a. Gording dan cladding CNP 125.50.20.2,3 1,215.65 kg 5,697 16,618 22,315
a. Rangka UNP 125.65.6.8 222.31 kg 5,697 16,618 22,315
b. Penutup atap dan cladding Ex.Union metal MP Deck 0.35mm TCT 19.36 m² 23,256 51,467 74,723
c. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di 38.71 m² 2,250 15,000 17,250
bawah gording)
d. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 3.50 m' 3,000 30,000 33,000
e. Talang zincalume t=0.35 mm 3.50 m' 23,256 51,467 74,723
f. plat strip 20.2 / 60 cm 4.43 kg 1,100 16,618 17,718
18 Pekerjaan Atap 7 ( A7 ) -
a. Atap Ex.Union metal MP Deck 0.35mm TCT 38.42 m² 23,256 51,467 74,723
b. Nok atap zincalum 0,35 mm TCT (m¹) di crimping (ujung nok dibentuk
5.91 m' 23,256 51,467 74,723
gelombang atap)
c. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 5.91 m' 3,000 30,000 33,000
d. Talang zincalume t=0.35 mm 5.91 m' 23,256 51,467 74,723
e. plat strip 20.2 / 60 cm 9.74 kg 1,100 16,618 17,718
f. plat flashing 5.91 m' 3,000 30,000 33,000
g. Rangka UNP 125 316.80 kg 5,697 16,618 22,315
i. Gording dan Lisplank C 125.50.20.2,3 (termasuk cat meni ) 162.61 kg 5,697 16,618 22,315
j. Trekstang Ø 10 mm (termasuk cat meni ) 6.71 kg 668 12,402 13,070
k. Water mur 16 mm 4.00 bh 5,000 75,000 80,000
l. Ikatan angin Ø 16 mm ( termasuk cat meni ) 24.84 kg 668 12,402 13,070
19 Pekerjaan Atap 8 ( A8 ) -
a. Atap Ex.Union metal MP Deck 0.35mm TCT 14.00 m² 23,256 51,467 74,723
b. Rangka hollow 40.40.2 (tebal 2 mm) 62.95 kg 1,100 16,618 17,718
20 Pekerjaan Atap 9 ( A9 ) -
a. Atap Ex.Union metal MP Deck 0.35mm TCT 10.20 m² 23,256 51,467 74,723
b. plat flashing 5.10 m' 3,000 30,000 33,000
c. Rangka atap dan gording hollow 40.40.4 62.95 kg 1,100 16,618 17,718
21 Perbaikan insulator atap existing Thermal insulator Ex Zeltech ZT 01-B di 152.00 m² 1,000 10,000 11,000
bawah gording
22 Cor Beton K 225 atau campuran 1:2:3 + Tulangan kolom dan balok -
a. Kolom beton tanpa tulangan ( P ) 0.55 m³ 116,586 1,086,154 1,202,740
b. Kolom praktis ( KP ) 1.52 m³ 487,053 7,640,204 8,127,257
c. Balok Beton ( B1 ) 1.46 m³ 420,588 3,722,050 4,142,638
d. Ringbalk ( R1 ) 1.42 m³ 237,787 1,347,458 1,585,245
Subtotal
F Pekerjaan Dinding, Pasangan, Plesteran dan Acian
1 Angkur Ø8" P = 50 cm tiap jarak 60 cm dipasang di tiang IWF 154.00 bh 850 7,650 8,500
2 Dinding pasangan bata merah 1:2 trassram = 80 cm untuk keliling bangunan 44.40 m² 16,425 59,532 75,957
3 Dinding pasangan bata merah 1:2 trassram = 140 cm untuk KM/WC, Janitor, 20.44 m² 16,425 59,532 75,957
4 & T. buatpas
Dinding es bata merah 1:4 di atas trassram 270.20 m² 16,425 50,602 67,027
5 Plesteran trassram 1:2 109.24 m² 19,440 12,279 31,719
6 Plesteran di atas trassram 1:4 540.40 m² 19,440 10,435 29,875
7 Acian dinding dalam dan luar 605.24 m² 12,960 4,124 17,084
8 Pasang glassblock + tali air 128.00 bh 9,000 20,000 29,000
9 Pasang Rooster + tali air 700.00 bh 3,000 5,000 8,000
10 Pasangan dinding keramik uk. 20X25 putih kilap ex roman kw 1 (u/ WC) -
a. R. 36.a 8.25 m² 58,320 72,905 131,225
b. R. 36.b 8.25 m² 58,320 72,905 131,225
c. R. 36.c 10.80 m² 58,320 72,905 131,225
11 Pekerjaan Meja beton ( R 31 ) -
a. Beton 1:2:3 + tulangan tebal 10 cm 0.22 m³ 1,049,186 5,945,387 6,994,573
b. Sink ex. Royal ST3 + aksesoris 1.00 unit 33,750 337,500 371,250
c. Pasangan keramik meja beton dan dinding 30x30 putih kilap ex Roman 5.24 m² 45,360 65,468 110,828
d. Plint miring keramik 13.70 m' 8,577 9,698 18,275
e. Kran San-Ei type A286JC – PA286JC ( type bebek flexible) 1.00 bh 5,850 58,500 64,350
f. Pemasangan saringan bakso (MBO) 1.00 bh 108,000 108,000
g. Rumah gas + pintu teralis (utk meja beton 1) 1.00 unit 112,500 637,500 750,000
h. Pipa+Fitting + asesoris 1.00 ls 12,500 112,500 125,000
12 Pekerjaan Meja beton ( R 33 ) -
a. Beton 1:2:3 + tulangan tebal 10 cm 0.11 m³ 2,098,372 11,890,774 13,989,145
b. Sink ex. Royal ST3 1.00 unit 33,750 337,500 371,250
c. Pasangan keramik meja beton dan dinding 30x30 putih kilap ex Roman 2.47 m² 45,360 65,468 110,828
d. Plint miring keramik 5.70 m' 8,577 9,698 18,275
e. Kran San-Ei type A286JC – PA286JC ( type bebek flexible) 1.00 bh 5,850 58,500 64,350
f. Pemasangan saringan bakso (MBO) 1.00 bh 108,000 108,000
g. Rumah gas + pintu teralis (utk meja beton 1) 1.00 unit 112,500 637,500 750,000
h. Pipa+Fitting + asesoris 2.00 ls 12,500 112,500 125,000
13 Pekerjaan T. Cuci ( R. 39 ) -
a. Cor rabat 1:3:5 tebal 8 cm 0.23 m³ 37,809 23,415 61,224
b. Pasangan keramik lantai 30x30 ex roman warna putih doff 2.93 m² 45,360 65,468 110,828
c. Pasangan keramik dinding 30x30 cm ex roman warna putih kilap 2.79 m² 45,360 65,468 110,828
d. Plint miring keramik 2.40 m' 8,577 9,698 18,275
e. Floordrain ex Alinco 1990 ABS ball 1.00 bh 24,750 247,500 272,250
14 Pekerjaan washtafel tinggi 85 cm ( R. 37 ) -
a. Washtafel ex TOTO tipe L548 + asesoris + dudukan 1.00 unit 24,750 247,500 272,250
b. Beton 1:2:3 + tulangan tebal 8 cm 0.04 m³ 2,671,538 15,138,716 17,810,255
c. Balok beton 14x20 + tulangan 0.03 m³ 3,847,015 21,799,752 25,646,767
d. Top table keramik 30x30 ex. Roman KW 1 warna putih 0.54 m² 45,360 65,468 110,828
e. Cermin 5 mm ukuran 90x75 cm 1.00 unit 64,054 96,600 160,654
f. Kran washtafel type TX 108 LD ex. TOTO 1.00 bh 6,500 65,000 71,500
g. Pemasangan saringan bakso (MBO) 1.00 bh 108,000 108,000
h. Instalasi pipa buangan 1.00 ls 4,500 45,000 49,500
15 Pekerjaan T. Buat Es -
a. Pasangan keramik lantai 30x30 ex roman warna putih doff 3.63 m² 45,360 65,468 110,828
b. Pemasangan saringan bakso (MBO) 1.00 bh 108,000 108,000
c. Instalasi pipa buangan 1.00 ls 4,500 45,000 49,500
16 Pekerjaan Penutup Rooster ( Rangka plat strip 20.2 mm dan penutup ram 2.08 m² 5,147 51,467 56,614
kawat 50 x 10 Ø 1,63 mm )
17 Pekerjaan Ventilasi Atas ( Rangka besi siku 50.50.5 dan penutup kawat 50 x 12.20 m² 9,495 73,945 83,440
10 Ø 1,63 mm )
18 Pekerjaan Dudukan Genset 1.00 unit 125,000 1,250,000 1,375,000
19 Pekerjaan Dudukan Pompa 2.00 unit 35,000 350,000 385,000
20 Pekerjaan Tempat Sampah 1.00 unit 45,000 450,000 495,000
Subtotal
G Pekerjaan Lantai -
1 Plat galvanis 1.8mm (2.4x1.2x2) + rangka + zincromate + cat ( Cor Monolit ) 5.76 m² 158,535 142,800 301,335
2 Lantai F1 -
a. Urugan pasir tebal 10 cm bawah lantai 14.80 m³ 10,080 54,432 64,512
b. Plastik cor 148.38 m² 500 3,000 3,500
c. Beton ready mix K-225 (1:2:3) tebal 10 cm + wire mesh M-5 tunggal 14.84 m³ 111,489 631,774 743,263
d. Finishing floorhardener ex. Fosroc dosis 5 kg/m² warna netral + trowel
halus (m³) 148.38 m² 5,000 70,000 75,000
e. Dilatasi pengecoran (cutting lantai + sillent) 225.92 m' 3,000 6,000 9,000
3 Lantai F2 -
a. Urugan pasir tebal 10 cm bawah lantai 4.90 m³ 10,080 54,432 64,512
b. Plastik cor 49.15 m² 500 3,000 3,500
c. Beton ready mix K-225 (1:2:3) tebal 7 cm + wire mesh M-5 tunggal 3.44 m³ 111,489 631,774 743,263
d. Finishing lantai putih kilap 30 x 30 cm ex roman KW 1 49.15 m² 45,360 65,468 110,828
4 Lantai F3 -
a. Urugan pasir tebal 10 cm bawah lantai 0.20 m³ 10,080 54,432 64,512
b. Plastik cor 2.08 m² 500 3,000 3,500
c. Beton ready mix K-225 (1:2:3) tebal 7 cm + wire mesh M-5 tunggal 1.46 m³ 111,489 631,774 743,263
d. Finishing lantai putih kilap 20 x 20 cm ex roman KW 1 2.08 m² 45,360 64,633 109,993
5 Lantai F4 -
a. Urugan pasir tebal 10 cm bawah lantai 2.71 m³ 10,080 54,432 64,512
b. Plastik cor 27.14 m² 500 3,000 3,500
c. Beton ready mix K-150 (1:3:5) tebal 10 cm 2.71 m³ 111,489 631,774 743,263
d. Finishing lantai aci roll 27.14 m² 12,960 4,124 17,084
6 Lantai F5 -
a. Urugan sirtu 10 cm bawah lantai 10.56 m³ 9,450 120,420 129,870
7 Plint miring Keramik -
a. Keramik 20 x 20 ( R. 36 a – c ) 16.42 m' 8,577 9,698 18,275
b. Keramik 30 x 30 ( R. 39 ) 4.80 m' 8,577 9,698 18,275
8 Plint tegak keramik ( pertemuan lantai keramik dengan dinding ) 48.06 m' 8,577 9,698 18,275
9 Cutting lantai gudang 232.38 m' 3,000 6,000 9,000
10 Penutupan Void ex tangga Lt 2 Bangunan Existing -
a. Rangka CNP 125.55.20.2,3 30.39 kg 5,697 16,618 22,315
b. Pengaku L 40.40.4 11.44 kg 1,100 16,618 17,718
d. Multipleks 18 mm 3.60 m² 20,500 205,000 225,500
11 Penutupan Void u/ akses konekting Lt 2
a. Rangka CNP 125.55.20.2,3 175.56 kg 5,697 16,618 22,315
b. Pengaku L 40.40.4 4.00 kg 1,100 11,000 12,100
d. Multipleks 18 mm 6.60 m² 20,000 200,000 220,000
12 Cor Beton K 225 atau campuran 1:2:3 + Tulangan Lantai 2
a. connector gudang dan bangunan rumah lama t = 12 cm 0.79 m³ 525,000 2,975,000 3,500,000
13 Siku 40.40.4 untuk sudutan lantai pintu masuk intransit 2.00 m' 1,100 11,000 12,100
Sub Total
H Pekerjaan Partisi
1 Rangka partisi ex. Jayaboard terdiri dari : 153.38 m² 31,824 42,525 74,349
- Holllow 40.40.2 -
2 Penutup partisi -
a. W2 ( Multiplek 6 mm + partisi teakwood tinggi 1,2 & diatasnya gypsum 9 66.92 m² 9,153 91,530 100,683
mm
b. W3) ( partisi multiplek 6 mm ) 139.06 m² 3,281 32,813 36,094
c. W4 ( partisi multiplek 6 mm + ram kawat ) 32.40 m² 3,281 32,813 36,094
d. W5 ( gypsum 9 mm ) 59.03 m² 3,193 31,932 35,125
e. W6 (gypsum 9 mm untuk sekat kantor t=1,2 m) 9.36 m² 3,193 31,932 35,125
3 List profil 1,5 x 90 mm (plint tegak) 125.64 m¹ 2,955 26,592 29,547
4 Ram kawat 50 x 10 Ø 1,63 mm 47.58 m² 3,562 32,058 35,620
Sub Total
I Pekerjaan Kusen Pintu & Jendela
1 Kusen Pintu Kayu + asesoris sesuai gambar (list kusen dll)
a. P1 1.00 bh 9,253 83,279 92,532
b. P2 3.00 bh 9,253 83,279 92,532
c. P3 2.00 bh 9,253 83,279 92,532
d. P4 1.00 bh 9,253 83,279 92,532
e. P5 1.00 bh 9,253 83,279 92,532
f. P6 1.00 bh 9,253 83,279 92,532
g. PJ1 2.00 bh 9,253 83,279 92,532
h. PJ2 1.00 bh 9,253 83,279 92,532
2 Daun pintu Kayu + asesoris sesuai gambar (lipping daun pintu, engsel, -
handle,
a. P1 tipe kunci dll) 1.00 bh 187,500 1,062,500 1,250,000
b. P2 3.00 bh 172,500 977,500 1,150,000
c. P3 2.00 bh 187,500 1,062,500 1,250,000
d. P4 1.00 bh 187,500 1,062,500 1,250,000
e. P5 2.00 bh 112,500 637,500 750,000
f. P6 1.00 bh 112,500 637,500 750,000
g. PJ1 2.00 bh 232,500 1,317,500 1,550,000
h. PJ2 1.00 bh 217,500 1,232,500 1,450,000
3 Kusen Jendela & Sawangan Kayu -
a. J1 5.00 bh 27,389 246,505 273,895
b. J2 1.00 bh 36,087 324,787 360,875
c. Sw 5.00 bh 41,497 373,474 414,971
4 Daun jendela & kaca sawangan + asesoris sesuai gambar (engsel, slot dan -
tarikan
a. J1 dll) 5.00 bh 41,250 233,750 275,000
b. J2 2.00 bh 22,692 128,586 151,277
c. Sw 10.00 bh 22,908 129,810 152,718
5 Kusen & Daun Pintu PVC + asesoris sesuai gambar ( Klos kayu u/ kusen 3.00 bh 67,500 450,000 517,500
6 pintu, engsel, akrilik , tarikan dll)
Pintu Besi -
a. PB1 1.00 bh 100,700 402,800 503,500
b. PB2 1.00 bh 106,058 424,230 530,288
c. PB3 1.00 bh 100,700 402,800 503,500
7 Pintu maintanance outdor coolroom 1.00 unit 300,000 1,200,000 1,500,000
Sub Total
J Pekerjaan Plafond
1 Rangka metal furing ex boral 226.52 m² 16,169 91,622 107,790
2 Penutup Plafond gypsum 9 mm ex Jayaboard 226.52 m² 4,790 27,142 31,932
3 Penutup Ram kawat 50 x 10 Ø 1,63 mm u/ R5 + Plat strip 20.2 mm 2.00 m² 12,516 70,924 83,440
Sub Total
K Pekerjaan Sanitair
1 Kloset jongkok ex TOTO tipe CE-7 warna putih 2.00 bh 64,979 368,213 433,192
2 Pemasangan Tahapan kaca 8mm 4.00 bh 18,750 106,250 125,000
3 Pemasangan Gantungan sikat (MBO) 4.00 bh 5,000 5,000
4 Pemasangan Kapstock plastik (MBO) 4.00 bh 5,000 5,000
5 Pekerjaan Dak Torn -
a. Cor Beton K 225 atau campuran 1:2:3 + Tulangan 1.22 m³ 364,882 6,932,762 7,297,644
b. Waterproofing + screading + finishing acian 4.47 m² 12,960 76,100 89,060
c. Tangga monyet 1.00 unit 225,000 525,000 750,000
d. Torn 1000 L 2.00 bh 274,500 2,342,000 2,616,500
6 Pekerjaan Torn Tanam -
a. Galian tanah 6.12 m³ 31,185 31,185
b. Torn 1000 L 1.00 bh 75,000 2,342,000 2,417,000
c. Urugan pasir 2.04 m³ 10,080 54,432 64,512
Sub Total
L Pekerjaan Air Kotor
1 Pipa PVC Maspion o 4" kelas AW 90.40 m' 10,950 44,634 55,585
2 Sambungan pipa Maspion klas AW (termasuk knee + T) 1.00 ls 35,000 315,000 350,000
3 Pipa Vent Ø ½" di KM/WC 3.00 bh 4,865 11,307 16,173
4 Floordrain ex Alinco 1990 ABS ball 3.00 bh 6,660 157,500 164,160
5 Bak kontrol (BK) : 2.00 unit 25,000 225,000 250,000
a. Pasangan bata 1.92 m² 16,425 50,602 67,027
b. Plester + aci dinding dalam 1.92 m² 4,696 42,262 46,958
c. Tutup BK 2.00 unit 15,000 135,000 150,000
6 Pekerjaan Biofil BF03 2.00 unit 978,750 6,525,000 7,503,750
Sub Total
M Pekerjaan Air Hujan
1 Talang vertikal Maspion kelas D Ø 4" 96.00 m' 10,950.30 31,839.19 42,789
2 Sambungan pipa ex Maspion kelas D termasuk sock T 1.00 ls 9,360.00 84,240.00 93,600
3 Klem pipa 4” ke dinding (plat strip 20x2 - termasuk zincromate & cat) 1.00 ls 21,470.40 193,233.60 214,704
4 Rembesan air hujan buis beton Ø80cm + Manhole beton 1:2:3 t=10 cm 2.00 unit 75,000.00 675,000.00 750,000
Sub Total
N Pekerjaan Pengecatan
1 Dempul untuk dinding dalam 441.19 m² 1,065 9,585 10,650
2 Dempul untuk plafond dalam 106.15 m² 1,065 9,585 10,650
3 Dempul Impra + politur untuk partisi teakwood 226.52 m² 4,406 27,194 31,599
4 Dempul partisi multiplek 171.46 m² 1,157 4,626 5,783
5 Dempul Impra + Pinoguard untuk kusen 69.82 m¹ 2,962 11,848 14,810
6 Dempul Impra + politur untuk daun pintu 36.74 m² 6,320 25,279 31,599
7 Dempul Impra + Pinoguard untuk daun jendela 9.72 m² 6,320 25,279 31,599
8 Dempul Impra + Pinoguard walnut : -
a. Profil 1,5 x 9 cm 86.95 m' 1,900 7,600 9,500
b. List kayu 86.95 m' 1,900 7,600 9,500
9 Cat dinding luar ex. Mowilex orange dream 560.60 m² 4,586 33,237 37,823
10 Cat dinding dalam ex vinylex apple white 1,652.36 m² 4,586 9,585 14,171
11 Cat partisi multiplek ex vinylex apple white 171.46 m² 4,586 9,585 14,171
12 Cat plafond dalam ex vinylex super white 226.52 m² 4,586 9,585 14,171
13 Cat Talang vertikal air hujan ex. Seiv bahama brown 96.00 m¹ 3,000 7,500 10,500
14 Zincromate ICI abu
Sub Total
O Pekerjaan Lain – Lain
1 Tempat Jemur meliputi pekerjaan
a. Rangka Tiang Jemur 65.63 kg 8,829 23,805 32,634
b. Kawat jemur 1.00 ls 67,500 382,500 450,000
2 Dudukan Mesin coldroom, 1.00 unit 187,500 1,062,500 1,250,000
3 Tahanan Ban motor 10.00 bh 37,500 312,500 350,000
4 Grill Tangga 3.00 bh 250,000 250,000
5 Pekerjaan Benteng, pondasi, & Kawat Duri 34.80 m¹ 260,566 1,476,542 1,737,108
Sub Total
Total
Fee Pemborong 10 % ???
Grand Total
Dibulatkan
encana Anggaran Biaya
(RAB)
TOTAL
4,800,000
600,000
22,839,408
632,772
2,205,000
1,000,000
-
350,000
1,871,388
1,800,000
36,098,568
6,500,000
750,000
2,250,000
3,000,000
12,500,000
###
1,305,092
1,236,173
180,249
64,241
49,272
56,757
-
502,200
569,880
18,960
1,393,800
21,840
174,182
232,243
43,868
48,384
29,030
23,224
1,097,712
2,195,235
164,997
9,407,342
1,653,056
276,734
-
15,541,641
3,862,547
1,882,857
8,264,822
1,306,841
1,623,942
307,492
105,700
3,383,424
3,383,424
41,592,480
16,182,475
8,572,338
24,082,255
15,245,266
5,301,479
310,500
1,242,000
3,537,216
828,000
1,435,200
207,000
239,200
310,500
358,800
207,000
1,249,612
632,000
207,000
1,249,612
239,200
83,679
40,166
100,415
80,332
1,071,096
18,988,301
435,106
640,000
863,416
4,513,750
6,603,990
550,275
366,563
2,344,798
2,587,500
201,250
66,000
12,844,832
2,039,840
1,503,040
1,173,146
1,914,000
12,100,000
479,074
290,400
462,000
-
31,396,502
10,764,515
3,137,158
1,448,448
428,032
594,000
385,105
-
115,405
6,159,542
1,421,952
250,000
-
13,670,934
15,764,034
3,013,694
1,391,444
867,611
434,940
563,965
-
10,827,308
14,771,306
2,871,832
1,325,945
327,690
222,505
-
27,126,577
4,960,647
1,446,258
667,748
115,500
261,529
78,400
-
2,870,473
441,611
195,030
441,611
172,480
195,030
7,069,234
3,628,605
87,740
320,000
324,633
-
1,046,118
1,115,352
-
762,172
168,300
1,115,352
1,672,000
-
666,558
12,374,358
6,053,223
2,252,316
353,762,345
1,309,000
3,372,484
1,552,558
18,110,709
3,465,016
16,144,428
10,340,071
3,712,000
5,600,000
-
1,082,602
1,082,602
1,417,225
-
1,510,828
371,250
580,740
250,371
64,350
108,000
750,000
125,000
-
1,594,763
371,250
273,746
104,169
64,350
108,000
750,000
250,000
-
13,812
324,505
308,657
43,861
272,250
-
272,250
769,403
646,299
59,847
160,654
71,500
108,000
49,500
-
402,528
108,000
49,500
117,756
1,017,970
1,375,000
770,000
495,000
81,901,803
-
1,735,688
-
954,778
519,318
11,028,276
11,128,238
2,033,280
-
316,109
172,027
2,557,228
5,447,275
-
12,902
7,277
1,081,671
228,675
-
175,094
94,995
2,017,312
463,689
-
1,371,396
-
300,079
87,721
878,307
2,091,420
-
678,178
202,709
811,800
3,917,534
48,400
1,452,000
2,772,000
24,200
54,585,373
11,403,947
-
-
6,737,722
5,019,269
1,169,438
2,073,300
328,772
3,712,169
1,694,643
32,139,260
462,660
1,387,980
925,320
462,660
603,309
464,511
1,436,097
718,048
-
1,250,000
3,450,000
2,500,000
1,250,000
1,500,000
750,000
3,100,000
1,450,000
-
1,369,474
360,875
2,074,856
-
1,375,000
302,555
1,527,182
1,552,500
-
503,500
530,288
503,500
1,500,000
33,310,314
24,417,049
7,233,372
166,546
31,816,967
866,384
500,000
20,000
20,000
-
8,899,477
397,742
750,000
5,233,000
-
190,946
2,417,000
131,669
19,426,218
5,024,855
350,000
48,518
492,480
500,000
128,692
90,159
300,000
15,007,500
21,942,204
4,107,791
93,600
214,704
1,500,000
5,916,095
4,698,652
1,130,476
7,157,940
991,479
1,033,999
1,160,903
307,142
-
826,039
826,039
21,203,798
23,416,255
2,429,857
3,210,166
1,008,000
-
69,400,744
2,141,672
450,000
1,250,000
3,500,000
750,000
60,451,351
68,543,023
872,342,735
87,234,274
959,577,009
959,577,000
PEMERINTAH KOTA KEDIRI
DINAS PEKERJAAN UMUM KOTA KEDIRI
ANALISA HARGA SATUAN PEKERJAAN
HSPBJ (DAU) TAHUN ANGGARAN 2015
2. Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter A.6.-1#2
``
Harga Satuan Harga Satuan Jumlah Harga Satuan
Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Dolken Kayu F 8 - 10/400 cm btg 1.2500 29,700.00 37,125.00
PC kg 2.5000 1,269.00 3,172.50
Seng Gelombang lbr 1.2000 71,460.00 85,752.00
Pasir Beton m3 0.0050 104,850.00 524.25
Koral Beton m3 0.0090 181,800.00 1,636.20
Kayu 5/7 m3 0.0720 4,410,000.00 317,520.00
Paku Biasa 2 - 5" kg 0.0600 14,220.00 853.20
Meni Besi ltr 0.4500 16,425.00 7,391.25
Tenaga Kerja :
Pekerja oh 0.4000 31,500.00 12,600.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0200 63,000.00 1,260.00
0.6400 453,974.40 25,920.00 479,894.40
Harga per satuan pekerjaan dibulatkan 479,894.00
A.6. 4. M1 93,569.00
A.6. 5. M2 1,797,987.00
A.6. 6. M2 1,268,856.00
A.6. 8. M2 3,465.00
B.6. 2. M3 31,185.00
B.6. 4. M3 33,516.00
B.6. 5. M3 51,030.00
B.6. 6. M3 40,635.00
B.6. 7. M2 1,890.00
B.6. 8. M3 11,025.00
B.6. 9. M3 8,400.00
B.6. 10. M3 18,900.00
C.6. 5. M3 524,889.00
C.6. 7. M3 470,813.00
1. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
3. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
7. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP
9. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP
11. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP
23.a. Memasang 1 m2 dinding glass block ukuran (20 x 20) cm, campuran spesi 1 PC : 4 PP
24. Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
D.6. 3. M2 139,293.00
D.6. 7. M2 75,956.00
D.6. 9. M2 67,027.00
E.6. 4. M2 29,874.00
E.6. 5. M2 28,744.00
4. Membuat 1 m2 lantai kerja beton tumbuk 1PC : 3PS : 5KR tbl. 5 cm.
5. Membuat 1 m3 beton mutu f'c = 14.5 MPa (K 175), slump (12 + 2) cm, w/c = 0,66
6. Membuat 1 m3 beton mutu f'c = 16.9 MPa (K 200), slump (12 + 2) cm, w/c = 0,61
7. Membuat 1 m3 beton mutu f'c = 19.3 MPa (K 225), slump (12 + 2) cm, w/c = 0,58
11. Membuat 1 m3 beton mutu f'c = 28.8 MPa (K 300), slump (12 + 2) cm, w/c = 0,49
12. Membuat 1 m3 beton mutu f'c = 31.2 MPa (K 350), slump (12 + 2) cm, w/c = 0,48
Uraian Satuan Indeks Harga Satuan Harga Satuan Jumlah Harga Satuan
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.3200 3,690,000.00 1,180,800.00
Paku 5 - 12 cm kg 3.2000 14,220.00 45,504.00
Minyak Bekisting ltr 1.6000 5,670.00 9,072.00
Besi Beton polos kg 157.5000 11,520.00 1,814,400.00
Kawat Beton kg 2.2500 20,425.00 45,956.25
PC kg 336.0000 1,269.00 426,384.00
Pasir Beton m3 0.5400 104,850.00 56,619.00
Koral m3 0.8100 181,800.00 147,258.00
Kayu Kelas II (balok) m3 0.1200 4,410,000.00 529,200.00
Plywood/Triplek tebal 9 mm lbr 2.8000 139,860.00 391,608.00
Dolken Kayu Galam F (8 - 10) cm p = 4 m btg 32.0000 29,700.00 950,400.00
Tenaga Kerja :
Pekerja oh 5.3000 31,500.00 166,950.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Tukang Kayu oh 1.3000 54,000.00 70,200.00
Tukang Besi oh 1.0500 54,000.00 56,700.00
Kepala Tukang oh 0.2650 63,000.00 16,695.00
Mandor oh 0.2650 63,000.00 16,695.00
8.4550 5,597,201.25 342,090.00
Harga per satuan pekerjaan dibulatkan
6.-1#7 6 4. M2 61,224.00
Total (Rp)
61,224.30
61,224.00
6 5. M3 688,377.00
Total (Rp)
688,377.57
688,377.00
6 6. M3 719,469.00
Total (Rp)
719,469.01
719,469.00
6 7. M2 743,263.00
Total (Rp)
743,263.21
743,263.00
6.-2#7 6 8. M3 758,233.00
Total (Rp)
758,233.52
758,233.00
6 11. M3 841,988.00
Total (Rp)
841,988.88
841,988.00
6 12. M3 852,377.00
Total (Rp)
852,377.20
852,377.00
6 13. M3 777,366.00
Total (Rp)
777,366.00
777,366.00
6 25. M3 13,070.00
Total (Rp)
13,070.18
13,070.00
Total (Rp)
127,781.50
127,781.00
6 27. Kg 52,286.00
Total (Rp)
52,286.75
52,286.00
6 28. M2 186,129.00
Total (Rp)
186,129.00
186,129.00
6 29. M2 204,579.00
Total (Rp)
204,579.00
204,579.00
6 30. M2 342,891.00
Total (Rp)
342,891.00
342,891.00
Total (Rp)
356,121.00
356,121.00
6 32. M2 404,091.00
Total (Rp)
404,091.00
404,091.00
6 33. M2 404,541.00
Total (Rp)
404,541.00
404,541.00
6 34. M2 305,707.00
Total (Rp)
305,707.50
305,707.00
Total (Rp)
3,594,116.25
3,594,116.00
6 39. M3 4,529,721.00
Total (Rp)
4,529,721.00
4,529,721.00
6 40. M3 8,127,256.00
Total (Rp)
8,127,256.50
8,127,256.00
Total (Rp)
6,250,908.00
6,250,908.00
6 43. M3 5,582,702.00
Total (Rp)
5,582,702.25
5,582,702.00
6 45. M3 60,197.00
Total (Rp)
60,197.63
60,197.00
80,774.30
80,774.00
6 47. M3 5,939,291.00
5,939,291.25
5,939,291.00
F.6. HARGA SATUAN PEKERJAAN KAYU F.6.-1#7
1. Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I (Jati)
2. Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III (Kamper)
5.a. Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II (Kamper)
5.c. Membuat dan memasang 1 m2 daun pintu panel, kayu kelas III (Kruing)
6.a. Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II (Kamper)
7. Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I (Jati)
7.a. Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas II (Kamper)
8. Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (Kamper lebar sampai 90 cm)
8.a. Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas III (Kruing lebar sampai 90 cm) F.6.-3#7
18.a. Memasang 1 m2 rangka atap sirap, kayu kelas III (Kruing) F.6.-5#7
19. Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II (Kamper)
19.a. Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III (Kruing)
19.b. Memasang 1 m2 rangka langit-langit (100 x 100) cm, kayu kelas III (Kruing)
20. Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II (Kamper)
20.a. Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III (Kruing) F.6.-6#7
21.a. Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II (Kamper)
21.b. Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas III (Kruing)
22.a. Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II (Kamper)
22.b. Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas III (Kruing)
23. Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II (Kamper)
24. Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II (Kamper)
24.a. Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas III (Kruing) F.6.-8#7
F.6 2. M3 12,016,575.00
F.6 5. M2 1,230,300.00
F.6 7. M2 1,835,100.00
F.6 8. M2 454,161.00
F.6 8.a. M2 388,911.00
12.a. Memasang 1 m2 atap asbes gelombang (3,0 x 1,05) m x 4 mm rangka kayu kelas III (Kruing)
17.a. Memasang 1 m2 atap asbes gelombang (3,00 x 1,08) m x 6 mm rangka kayu kelas III (Kruing)
F.6 3. M2 71,658.00
F.6 5. M2 64,346.00
F.6 6. M1 59,443.00
F.6 7. M2 86,913.00
F.6 12. M2 39,507.00
0.04
0.04
0
0
Uraian Satuan Indeks Harga Satuan Harga Satuan Jumlah Harga Satuan
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Easy Frame TCR m' 3.0000 7,500.00 22,500.00
Easy Bottom m' 3.0000 6,000.00 18,000.00
Wall Angle m' 0.4000 4,000.00 1,600.00
Clip bh 9.0000 2,200.00 19,800.00
Road btg 4.0000 6,600.00 26,400.00
Gypsum m2 1.0000 21,875.00 21,875.00
Skrup bh 20.0000 315.00 6,300.00
Tenaga Kerja :
Ongkos Pasang m2 1.0000 12,000.00
116,475.00 12,000.00 128,475.00
Harga per satuan pekerjaan dibulatkan 128,475.00
F.6 7. M2 31,932.00
F.6 8. M1 24,853.00
F.6 10. M1 8,039.00
4. Memasang 1 bh urinoir
5. Memasang 1 bh wastafel
F.6 2. Bh 433,192.00
F.6 4. Bh 744,412.00
F.6 5. Bh 300,280.00
F.6 7. Bh 498,969.00
F.6 8. Bh 935,025.00
19. Memasang 1 m' talang 1/2 lingkaran dia 15 cm, seng plat bjls 30 lebar 45 J.6.-4#3
F.6 2. Kg 22,314.00
F.6 3. Kg 41,315.00
F.6 5. Cm 2,272.21
F.6 8. M2 1,229,278.00
F.6 10. M2 598,450.00
F.6 15 M2 301,334.00
F.6 4. Bh 234,810.00
F.6 5. Bh 17,491.00
F.6 6. Bh 10,426.00
F.6 9. Bh 10,876.00
F.6 11. Bh 179,163.00
16. Memasang per 1 m' plint ubin PC abu-abu ukuran (15 x 20) cm
19. Memasang per 1 m' plint ubin PC warna ukuran (15 x 20) cm
F.6 6. M2 121,006.35
F.6 48 M2 147,339.00
F.6 50. M2 131,224.00
8. Mengecat 1 m2 bidang kayu baru (1 lapis plamir dan cat dasar, 2 lapis cat penutup)
14. Mengecat 1 m2 bidang tembok baru dalam (1 lapis plamir dan cat dasar, 2 lapis cat penutup)
14.b Mengecat 1 m2 bidang tembok baru Luar (1 lapis plamir dan cat dasar, 2 lapis cat penutup)
24. Mengecat 1 m2 bidang permukaan baja lapis seng (galbani) secara manual 3 lapis cat konvensional tebal 200 mm
M.6 2. M2 3,109.00
M.6 7. M2 27,436.00
M.6 8. M2 31,842.00
Uraian Satuan Indeks Harga Satuan Harga Satuan Jumlah Harga Satuan
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Paving Blok m2 1.0000 34,492.50 34,492.50
Pasir Pasang m3 0.0800 104,850.00 8,388.00
Sewa Alat Pemadatan m2 1.0000 2,500.00 2,500.00
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0200 63,000.00 1,260.00
0.3300 45,380.50 13,590.00 58,970.50
Harga per satuan pekerjaan dibulatkan 58,970.00
Tenaga Kerja :
Pekerja oh 0.2400 31,500.00 7,560.00
Tukang Listrik oh 0.3200 54,000.00 17,280.00
Kepala Tukang oh 0.1600 63,000.00 10,080.00
Mandor oh 0.1200 63,000.00 7,560.00
0.8400 53,910.00 42,480.00 96,390.00
Harga per satuan pekerjaan dibulatkan 96,390.00
Ls.14. Memasang per 1 m2 dinding/lantai batu kerikil warna (ex. kupang) butiran dia 0,5 cm.
Ls.15.a. Memasang 1 m2 rangka atap baja ringan mutu tinggi model pelana/perisai sederhana sudut kemiringan 30 o bentang ≤ 08 m'
Ls.15.b. Memasang 1 m2 rangka atap baja ringan mutu tinggi model pelana/perisai sederhana sudut kemiringan 30 o bentang 10 s/d 16 m'.
Ls.15.c. Memasang 1 m2 rangka atap baja ringan mutu tinggi model pelana/perisai sederhana sudut kemiringan 30 o bentang > 16 m'. Ls.-5#5
L.5. M2 6,930.00
L.6. M2 3,150.00
L.7. M2 1,260.00
L.9. M2 2,205.00
L.13. M3 365,400.00
Ls.1. M2 60,048.00
Ls.2. M2 52,690.00
Ls.3. M2 76,533.00
Ls.3a. M2 58,970.00
Ls.5. Bh 18,709.00
Ls.6. Bh 21,454.00
Ls.7. Bh 16,459.00
Ls.11. M2 754,065.00
Ls.12. M2 492,719.00
Ls.13. M2 530,288.00
Ls.14. M2 141,182.00
Ls.15.a. M2 200,851.00
Ls.15.b. M2 264,804.00
-0.30
Ls.15.c. M2 329,850.00
### 201600
PEMERINTAH KOTA KEDIRI
DINAS PEKERJAAN UMUM
HARGA SATUAN POKOK BARANG DAN JASA
(DAU) TAHUN ANGGARAN 2015
HARGA SATUAN
No. URAIAN SAT.
(Rp.)
NO URAIAN
A Pekerjaan Persiapan
B Pekerjaan Bongkaran
H Pekerjaan Lantai
I Pekerjaan Partisi
K Pekerjaan Plafond
L Pekerjaan Sanitair
BOBOT % 1 2 3 4 5 6
1.08 0.31
4.77 1.66
40.55 3.35
9.39
6.26
3.68
3.82
3.65
2.23 0.98
2.52
0.68
7.96
7.86
100.00
1.50 2.30 2.10 1.80 1.43 5.87
- 1.50 3.80 5.90 7.70 9.13 15.00
JADWAL PELAKSANAAN PEKERJAAN
7 8 9 10 11 12 13
0.43
0.56 0.21
2.10 1.01
1.50 1.90
1.96
1.10 1.40
0.87
8.09 6.22 7.60 8.20 8.10 19.49 8.19
23.09 29.31 36.91 45.11 53.21 72.70 80.89
1-Jun-15
150
29-Oct-15
14 15 16 17 18 19 20
0.28
1.86
1.15
0.38
1.36 1.16
0.68
1.30 2.40 2.50 1.76
3.56
Jangka waktu
pelaksanaan
pekerjaan
selama 150
(Seratus Lima
Puluh) hari
kalender
1.90 0.06
1.90 3.50
103.50 100.00
#REF!
Drs.SA'RONI
Direktur
JADWAL PELAKSANAAN PEKERJAAN
Proyek :WSR 36 Madiun
Pekerjaan :bangunan kantor, mess, dan gudang
Lokasi : Madiun - Jawa Timur
Pekerjaan Persiapan
B Pekerjaan Bongkaran
L Pekerjaan Sanitair
O Pekerjaan Pengecatan
MULAI
SELESAI
Kediri, 12 Juni 2015
#REF!
1-Jun-15 CV. DARMA BAKTI
150
29-Oct-15
#REF!
Drs.SA'RONI
Direktur
JADWAL PELAKSANAAN PEKERJAAN
Proyek :WSR 36 Madiun
Pekerjaan :bangunan kantor, mess, dan gudang
Lokasi : Madiun - Jawa Timur
A Pekerjaan Panel
A.1 Panel PP/LP 6.96 1.60 1.60 1.80 1.96
A.2 Panel Kontrol Genset (PK – G) 7.14 1.45 1.70 1.80 2.19
A.3 Pekerjaan Grounding Elektrikal maks.2 ohm (Panel & PK-G) 2.38 0.40 0.50 0.70 0.78
B Instalasi Penerangan & stop kontak 19.72 3.60 4.30 6.20 5.62
D.1 Pekerjaan Grounding Elektrikal maks.2 ohm (Penangkal Petir) 1.98 0.20 0.35 0.55 0.88 Jangka waktu
Row 49
pelaksanaan
pekerjaan
E Pekerjaan Telephone 5.50 0.85 1.30 1.40 1.95 selama 150
(Seratus Lima
F Pekerjaan TV 3.33 0.45 0.60 0.90 1.38 Puluh) hari
kalender
G Pekerjaan Jaringan Komputer 1.71 0.45 0.45 0.81
Drs.SA'RONI
Direktur
JADWAL PELAKSANAAN PEKERJAAN
Proyek :WSR 36 Madiun
Pekerjaan :bangunan kantor, mess, dan gudang
Lokasi : Madiun - Jawa Timur
A Pekerjaan Panel
A.1 Panel PP/LP 6.96 1.60 1.60 1.80 1.96
A.2 Panel Kontrol Genset (PK – G) 7.14 1.45 1.70 1.80 2.19
A.3 Pekerjaan Grounding Elektrikal maks.2 ohm (Panel & PK-G) 2.38 0.40 0.50 0.70 0.78
B Instalasi Penerangan & stop kontak 19.72 3.60 4.30 6.20 5.62
D.1 Pekerjaan Grounding Elektrikal maks.2 ohm (Penangkal Petir) 1.98 0.20 0.35 0.55 0.88 Jangka waktu
pelaksanaan
pekerjaan
E Pekerjaan Telephone 5.50 0.85 1.30 1.40 1.95 selama 150
(Seratus Lima
F Pekerjaan TV 3.33 0.45 0.60 0.90 1.38 Puluh) hari
kalender
G Pekerjaan Jaringan Komputer 1.71 0.45 0.45 0.81
MULAI
SELESAI Kediri, 12 Juni 2015
#REF!
1-Jun-15 CV. DARMA BAKTI
150
29-Oct-15
#REF!
Drs.SA'RONI