NO Uraian Pekerjaan Vol Sat Total
Bahan Upah
A Pekerjaan Panel
A.1 Panel PP/LP
1 Panel PP/LP uk.60x40x20 3 bh Rp1,926,000.00 Rp192,600.00 Rp6,355,800.00
2 Magnetic Contactor 40A LCID25M7 (MBO) 2 bh Rp354,473.00 Rp35,447.30 Rp779,840.60
3 MCB 1P 20A 4,5kA Domae 1 bh Rp56,843.00 Rp5,684.30 Rp62,527.30
4 MCB 1P 16A 4,5kA Domae 3 bh Rp56,843.00 Rp5,684.30 Rp187,581.90
5 MCB 1P 10A 4,5kA Domae 4 bh Rp56,843.00 Rp5,684.30 Rp250,109.20
6 MCB 1P 6A 4,5kA Domae 14 bh Rp56,843.00 Rp5,684.30 Rp875,382.20
7 MCB 1P 2A 4,5kA A:2 Domae 1 bh Rp56,843.00 Rp5,684.30 Rp62,527.30
8 Wiring material 1 Lot Rp25,000.00 Rp2,500.00 Rp27,500.00
9 MCB IN dari PK Genset 40A 6kA 1 bh Rp351,000.00 Rp35,100.00 Rp386,100.00
SubTotal Rp8,987,368.50
A.2 Panel Kontrol Genset (PK – G)
1 PK -G 60x40x20 1 bh Rp1,926,000.00 Rp192,600.00 Rp2,118,600.00
2 COS 40 A satuphase 2 pole(MBO) 1 bh Rp150,000.00 Rp150,000.00
3 pilot lamp type LED (indikator PLN & Genset ) + fuse 6 bh Rp100,312.00 Rp6,500.00 Rp640,872.00
4 Busbar + wiring material 1 Lot Rp25,000.00 Rp2,500.00 Rp27,500.00
5 Baby sirine 22V 1 bh Rp700,000.00 Rp70,000.00 Rp770,000.00
6 Relay 1 bh Rp5,000,000.00 Rp500,000.00 Rp5,500,000.00
7 Tombol Reset 1 bh Rp15,000.00 Rp1,500.00 Rp16,500.00
SubTotal Rp9,223,472.00
A.3 Pekerjaan Grounding Elektrikal maks.2 ohm (Panel & PK-G)
1 Jarum spit 2 bh Rp350,000.00 Rp35,000.00 Rp770,000.00
2 pipa gip 1” 3 bh Rp237,573.90 Rp52,974.00 Rp871,643.70
3 Kabel NYA 1 X 2,5 mm² dlm HIC 20 mm (PABX) 6 m' Rp3,375.00 Rp337.50 Rp22,275.00
4 Kabel NYA 1 X 6 mm² dlm HIC 20 mm 6 m' Rp10,125.00 Rp1,012.50 Rp66,825.00
5 BC 50 16 m' Rp41,400.00 Rp4,140.00 Rp728,640.00
6 Bak kontrol 30 x 30 2 bh Rp250,000.00 Rp55,000.00 Rp610,000.00
SubTotal Rp3,069,383.70
B Instalasi Penerangan & stop kontak
1 Kabel feeder dari KWH 1 PLN ke PKG-Genset NYY 3X6 mm² dlm HIC 20 mm 14.5 m' Rp28,500.00 Rp9,975.00 Rp557,887.50
2 Kabel feeder dari KWH 2 PLN ke PKG-Genset NYY 3X6 mm² dlm HIC 20 mm 32 m' Rp22,500.00 Rp7,875.00 Rp972,000.00
3 Kabel feeder dari PKG-Genset ke PP/LP NYY 3X6 mm² dlm HIC 20 mm 10 m' Rp22,500.00 Rp7,875.00 Rp303,750.00

4 Kabel feeder dari KWH 1 PLN ke PP/LP NYY 3X6 mm² dlm HIC 20 mm 24.5 m' Rp22,500.00 Rp7,875.00 Rp744,187.50
5 Kabel feeder dari KWH 2 PLN ke PP/LP NYY 3X6 mm² dlm HIC 20 mm 23 m' Rp22,500.00 Rp7,875.00 Rp698,625.00
6 Lampu SL 23 Watt 67 bh Rp24,480.00 Rp2,500.00 Rp1,807,660.00
7 Fitting Plafond segiempat (craem/putih) 41 bh Rp7,200.00 Rp2,500.00 Rp397,700.00
8 Fitting gantung industri + penggantung GIP 3/4” 16 bh Rp15,000.00 Rp4,500.00 Rp312,000.00
9 Saklar inbow 1 gang S8870 WHI 12 bh Rp14,850.00 Rp3,859.20 Rp224,510.40
10 Saklar inbow 2 gang S 8872 W1 WHI 24 bh Rp17,595.00 Rp3,859.20 Rp514,900.80
11 Exhaust fan dinding merk” KDK” (MBO) 4 bh Rp575,000.00 Rp40,000.00 Rp2,460,000.00
12 Exhaust fan plafond merk” KDK” (MBO) 4 bh Rp645,000.00 Rp40,000.00 Rp2,740,000.00
13 Key tag type 774234 (MBO) 2 bh Rp35,000.00 Rp70,000.00
14 Photocell 6A 250V(MBO) 2 bh Rp25,000.00 Rp50,000.00
15 Microswitch type Z – 15 GW-2B + cover(MBO) 7 bh Rp55,000.00 Rp385,000.00
16 Instalasi penerangan & keytag dg NYM 2X 1,5 mm² dlm HIC 20 mm 69 ttk Rp53,910.00 Rp42,480.00 Rp6,650,910.00
17 Emergency lamp EL 12Ah 18W LED,ON saat tidak ada Power(MBO) 3 bh Rp46,000.00 Rp2,500.00 Rp145,500.00
18 Stop kontak 1 gang 19 bh Rp12,600.00 Rp1,260.00 Rp263,340.00
19 Stop kontak 2 gang 16 bh Rp18,900.00 Rp1,890.00 Rp332,640.00
20 Stop kontak 3 gang 21 bh Rp18,900.00 Rp1,890.00 Rp436,590.00
21 Instalasi stopkontak dg NYM 3X2,5 mm² dlm HIC 20 mm 56 ttk Rp53,910.00 Rp42,480.00 Rp5,397,840.00
SubTotal Rp25,465,041.20
C Pekerjaan AC
1 Bongkar AC dan outdoor AC existing 4 Unit Rp150,000.00 Rp600,000.00
2 Service AC, oudoor AC dan Cleaning 4 Unit Rp250,000.00 Rp1,000,000.00
3 Pas. AC dan outdoor AC eks. Bongkaran 4 Unit Rp150,000.00 Rp4,750,000.00 Rp19,600,000.00
SubTotal Rp21,200,000.00
D Pekerjaan Penyalur petir
1 Jarum Spike (atas) 2 bh Rp350,000.00 Rp35,000.00 Rp770,000.00
2 Tiang pipa galvanis 3/4” Medium A 9 bh Rp195,081.98 Rp52,974.00 Rp2,232,503.78
3 BC 50 41 m' Rp41,400.00 Rp4,140.00 Rp1,867,140.00
4 HIC 20mm + accessories 1 ls Rp350,000.00 Rp35,000.00 Rp385,000.00
SubTotal Rp5,254,643.78
D.1 Pekerjaan Grounding Elektrikal maks.2 ohm (Penangkal Petir)
1 Jarum Spit 2 bh Rp350,000.00 Rp35,000.00 Rp770,000.00
2 Pipa Gip 1” 2 bh Rp195,081.98 Rp52,974.00 Rp496,111.95
3 Bc 50 mm 15 m' Rp41,400.00 Rp4,140.00 Rp683,100.00
4 Bak kontrol 30x30 2 bh Rp250,000.00 Rp55,000.00 Rp610,000.00
SubTotal Rp2,559,211.95
E Pekerjaan Telephone
1 Bobok dinding existing dan finishing ulang – untuk instalasi outlet aiphone 24 m' Rp25,000.00 Rp15,000.00 Rp960,000.00
1 PABX KX-TEM824, 6 CO 16 Ext.Lengkap panel MDF (MBO) 1 Unit Rp50,000.00 Rp50,000.00
2 Outlet telp inbow 1 gang S4817 WHI 14 bh Rp100,312.00 Rp10,031.20 Rp1,544,804.80
3 Pesawat Telephone singleline KX – TS505MXW (MBO) 14 bh Rp50,000.00 Rp700,000.00
4 Instalasi titik telephone dg ITC 2X2X0,6 dlm HIC 20mm 14 bh Rp250,000.00 Rp25,000.00 Rp3,850,000.00
SubTotal Rp7,104,804.80
F Pekerjaan TV
1 Bobok dinding existing dan finishing ulang – untuk instalasi outlet TV 18.4 m' Rp15,000.00 Rp1,500.00 Rp303,600.00
2 Outlet antena S3521 WHI 8 bh Rp34,000.00 Rp3,400.00 Rp299,200.00
3 Feeder kabel coax RG6 dr antena ke booster dlm HIC 20 mm 1 Lot Rp420,000.00 Rp42,000.00 Rp462,000.00
4 Instalasi titik outlet TV coax RG6 dlm HIC 20mm 1 Lot Rp1,200,000.00 Rp120,000.00 Rp1,320,000.00
5 UHF antena 4 bh Rp175,000.00 Rp17,500.00 Rp770,000.00
6 Booster & splitter 8 out 8 bh Rp55,000.00 Rp5,500.00 Rp484,000.00
7 Extend RG6 1,5 m lengkap jack kuningan ( dari outlet ke TV) 16 bh Rp37,500.00 Rp3,750.00 Rp660,000.00
SubTotal Rp4,298,800.00
G Pekerjaan Jaringan Komputer
1 Pas.Kabel jaringan UTP cat 5e (MBO) dlm HIC 20 mm 17 ttk Rp65,000.00 Rp1,105,000.00
2 Pas. Inbow dus 34 bh Rp6,000.00 Rp1,500.00 Rp255,000.00
3 Pengadaan faceplat outlet jaringan eks. Panasonic 17 bh Rp50,000.00 Rp850,000.00
SubTotal Rp2,210,000.00
H Pekerjaan APAR
1 Pas. Apar 5 kg (MBO) 8 bh Rp15,000.00 Rp120,000.00
Sub Total Rp120,000.00
I Pekerjaan Sistem Plumbing
I.1 Pekerjaan Sumur Bor
1 Jet Pump 375 Watt JD Basic 4 1 unit Rp1,071,000.00 Rp107,100.00 Rp1,178,100.00
2 Mobilisasi & demobilisasi peralatan 1 lot Rp374,850.00 Rp374,850.00
3 Pembuatan spul bak & penyediaan lumpur 1 lot Rp750,000.00 Rp75,000.00 Rp825,000.00
4 Pembuatan Pilot hole 2” 8 m' Rp40,635.00 Rp325,080.00
5 Pembuatan Pilot hole 4” 4 m' Rp40,635.00 Rp162,540.00
6 Pipa PVC 2” Abu 2 btg Rp81,413.10 Rp28,494.59 Rp219,815.37
7 Pipa PVC 4” Abu 2 btg Rp191,035.13 Rp66,862.29 Rp515,794.84
8 V-Socket PVC 4 x 3” Abu 4 bh Rp6,500.00 Rp975.00 Rp29,900.00
9 SDL PVC 2” Abu 2 bh Rp9,500.00 Rp1,425.00 Rp21,850.00
10 Strainer 2” 2 bh Rp7,500.00 Rp1,125.00 Rp17,250.00
11 Injuk tali 4 rol Rp55,000.00 Rp5,500.00 Rp242,000.00
12 Pipa PVC AW 1¼” Abu 97.64 btg Rp69,629.63 Rp24,370.37 Rp9,178,159.39
13 Pipa PVC AW 1” Abu 24.41 btg Rp67,844.25 Rp23,745.49 Rp2,235,705.49
14 Dop PVC AW 4” Abu 2 bh Rp6,500.00 Rp650.00 Rp14,300.00
15 Knei PVC AW 1¼” Abu 2 bh Rp6,500.00 Rp650.00 Rp14,300.00
16 Knee PVC AW 1” Abu 2 bh Rp5,500.00 Rp550.00 Rp12,100.00
17 Water mur PVC 1¼” pakai drat 9 bh Rp27,500.00 Rp2,750.00 Rp272,250.00
18 Water mur PVC 1” pakai drat 3 bh Rp20,000.00 Rp2,000.00 Rp66,000.00
19 Tosen klep kuningan 1” + Strainer 3 bh Rp75,000.00 Rp7,500.00 Rp247,500.00
20 Kran Ballvalve 1” 3 bh Rp30,000.00 Rp3,000.00 Rp99,000.00
21 SDL PVC 1¼” 18 bh Rp9,500.00 Rp1,425.00 Rp196,650.00
22 Double nipple galvanish 1” 9 bh Rp17,500.00 Rp2,625.00 Rp181,125.00
23 SDL PVC 1” Abu 9 bh Rp9,500.00 Rp213.75 Rp87,423.75
24 Lem Pipa PVC 2 klg Rp27,500.00 Rp2,750.00 Rp60,500.00
25 Seal tape kw1 1 rol Rp2,250.00 Rp337.50 Rp2,587.50
26 Radar air 2 bh Rp75,000.00 Rp5,000.00 Rp160,000.00
27 Relay 220VAC LY2 + socket 1 set Rp8,000,000.00 Rp800,000.00 Rp8,800,000.00
Subtotal Rp25,539,781.34
I.2 Instalasi Pipa Air GWT
1 Pompa air 150 Watt otomatis Semijet PH151 1 unit Rp450,000.00 Rp45,000.00 Rp495,000.00
2 Tangki GWT 1 unit Rp255,000.00 Rp25,500.00 Rp280,500.00
3 Pipa PVC AW 1” Abu 40.79 m' Rp11,307.38 Rp4,865.40 Rp659,687.49
4 Kran Ballvalve 1” 4 bh Rp30,000.00 Rp3,000.00 Rp132,000.00
5 Fittings (drat kuningan, double niple gip,dll) 1 ls Rp175,000.00 Rp17,500.00 Rp192,500.00
6 Hanger & support 1 ls Rp125,000.00 Rp12,500.00 Rp137,500.00
7 Radar air 3 set Rp62,500.00 Rp9,375.00 Rp215,625.00
8 Kabel NYMHY 2 x 1,5 dlm HIC 20mm 3.5 m' Rp8,500.00 Rp850.00 Rp32,725.00
Subtotal Rp2,145,537.49
I.3 Instalasi Distribusi Air
1 Torn air fiber kapasitas 1000 ltr 2 bh Rp2,745,000.00 Rp150,000.00 Rp5,790,000.00
2 Pipa PVC AW 1½” Abu 97.64 m' Rp11,604.94 Rp4,865.40 Rp1,608,163.75
3 Pipa PVC AW 1½” Abu 24.41 m' Rp11,604.94 Rp4,865.40 Rp402,040.94
4 Pipa PVC AW 1” abu 60.54 m' Rp11,307.38 Rp4,865.40 Rp979,099.80
5 Pipa PVC AW 1” abu 30.27 m' Rp11,307.38 Rp4,865.40 Rp489,549.90
6 Pipa PVC AW ¾” abu 48.82 m' Rp8,926.88 Rp4,865.40 Rp673,338.87
7 Fittings (drat kuningan, double niple gip,dll) 1 ls Rp157,500.00 Rp4,865.40 Rp162,365.40
8 Hanger & support 1 ls Rp225,000.00 Rp4,865.40 Rp229,865.40
9 Kran Ballvalve 1½” 6 bh Rp35,000.00 Rp3,500.00 Rp231,000.00
10 Kran Ballvalve 1” 6 bh Rp30,000.00 Rp3,000.00 Rp198,000.00
11 Kran ballvalve ½” 6 bh Rp25,000.00 Rp2,500.00 Rp165,000.00
12 Double nipple galvanish ½” 2 bh Rp17,500.00 Rp2,625.00 Rp40,250.00
13 L bow galvanish ½” 3 bh Rp32,500.00 Rp4,875.00 Rp112,125.00
14 Nipple slang kuningan ½” 3 bh Rp17,500.00 Rp2,625.00 Rp60,375.00
15 Kran washtafel ½” Y50JRN 1 bh Rp140,000.00 Rp15,000.00 Rp155,000.00
16 Kran sink ½” A10JRN 4 bh Rp22,556.25 Rp6,660.00 Rp116,865.00
Subtotal Rp11,413,039.06
I.4 Instalasi Gas LPG
1 Pipa galvanish ½” 5 m' Rp23,805.00 Rp8,829.00 Rp163,170.00
2 Fittimgs 1 ls Rp175,000.00 Rp2,500.00 Rp177,500.00
3 Hanger & support 1 ls Rp150,000.00 Rp1,500.00 Rp151,500.00
4 Kran gas single ½ 2 bh Rp20,000.00 Rp2,500.00 Rp45,000.00
Subtotal Rp537,170.00
Total Rp129,128,253.81
Fee Pemborong Rp12,912,825.38
Gran Total Rp142,041,079.19
Dibulatkan Rp142,041,000.00
Rencana Anggaran Biaya
(RAB)
Proyek :WSR 36 Madiun
Pekerjaan :bangunan kantor, mess, dan gudang
Lokasi : Madiun - Jawa Timur

Harga Harga
NO URAIAN PEKERJAAN Vol. Sat.
Upah Bahan Satuan
A Pekerjaan Persiapan
1 Keamanan & Koordinasi 1.00 ls 4,800,000 4,800,000
2 Mobilisasi & Demobilisasi 1.00 ls 400,000 200,000 600,000
3 Bedeng kerja & Los kerja 18.00 ls 155,250 1,113,606 1,268,856
4 Pembesihan Area Kerja
a. Stripping lahan 334.80 m² 1,890 1,890
b. Pembersihan bekas kerja ke luar lokasi proyek 200.00 m² 11,025 11,025
5 Air kerja & Listrik Kerja 1.00 ls 1,000,000 1,000,000
6 Pengukuran & Pemasangan Bouwplank -
a. Stight out dengan alat optis/ teodolit 1.00 ls 350,000 350,000
b. Bouwplank 20.00 m' 9,495 84,074 93,569
7 Dokumentasi dan laporan 1.00 ls 1,800,000 1,800,000
Sub Total
B Pekerjaan Bongkaran
1 Bongkaran Lahan Baru ( termasuk menara torn existing ) 1.00 ls 6,500,000 6,500,000
2 Bongkaran Area Mess 1.00 ls 750,000 750,000
3 Bongkaran Area Kantor 1.00 ls 2,250,000 2,250,000
4 Bongkaran Area Gudang 1.00 ls 3,000,000 3,000,000
Sub Total
C Pekerjaan Galian & Urugan
1 Galian pondasi setempat ( P1 ) 41.85 m³ 31,185 31,185
2 Galian pondasi batu kali
a. P2 39.64 m³ 31,185 31,185
b. P3 5.78 m³ 31,185 31,185
c. P4 2.06 m³ 31,185 31,185
3 Galian sloof gantung ( S1 ) 1.58 m³ 31,185 31,185
4 Galian pondasi chain Hoist 1.82 m³ 31,185 31,185
5 Penyemprotan obat anti rayap ( obat anti rayap MBO ) -
a. Galian pondasi setempat ( P1 ) 41.85 m³ 12,000 12,000
b. Galian pondasi batu kali ( P2, P3, P4 ) 47.49 m³ 12,000 12,000
c. Galian sloof gantung ( S1 ) 1.58 m³ 12,000 12,000
d. Urugan leveling bangunan 116.15 m³ 12,000 12,000
e. Dudukan Chain hoist 1.82 m³ 12,000 12,000
6 Urugan pasir tebal 10 cm bawah pondasi & sloof gantung:
a. P1 2.70 m³ 10,080 54,432 64,512
b. P2 3.60 m³ 10,080 54,432 64,512
c. P3 0.68 m³ 10,080 54,432 64,512
d. P4 0.75 m³ 10,080 54,432 64,512
e. S1 0.45 m³ 10,080 54,432 64,512
f. Dudukan Chain hoist 0.36 m³ 10,080 54,432 64,512
7 Urugan tanah 1/3 galian + pemadatan 58.08 m³ 18,900 18,900
8 Urugan tanah + pemadatan
a. Ex galian 116.15 m³ 18,900 18,900
b. Sirtu 8.73 m³ 18,900 18,900
Sub Total
D Pekerjaan Struktur Bawah
1 Lantai Kerja (Tebal 5 cm) beton 1:3:5
a. Pondasi setempat P1 27.00 m² 37,809 23,415 61,224
b. Sloof gantung S2 4.52 m² 37,809 23,415 61,224
2 Pasangan Batu Belah 1:5 + stek Ø8 tiap jarak 2 m -
a. P2 28.89 m³ 97,868 440,091 537,959
b. P3 7.18 m³ 97,868 440,091 537,959
c. P4 3.50 m³ 97,868 440,091 537,959
3 Cor Beton K 225 atau campuran 1:2:3 + Tulangan
a. Pondasi setempat & Stump Kolom ( P1 ) 6.43 m³ 150,950 1,134,404 1,285,353
b. Sloof S1 1.36 m³ 108,182 852,731 960,912
c. Sloof P2 1.69 m³ 108,182 852,731 960,912
d. Sloof P3 0.32 m³ 108,182 852,731 960,912
e. Sloof P4 0.11 m³ 108,182 852,731 960,912
e. Sloof P5 m²
4 Angkur Stump Kolom, L = 80 cm Ø 16 mm + baut atas bawah 48.00 bh 6,408 64,080 70,488
5 Grouting Stump Kolom tinggi 5 cm 48.00 bh 6,408 64,080 70,488
Sub Total
E Pekerjaan Struktur Atas & Atap
1 Frame Baja ( termasuk cat meni )
a. Tiang IWF 250.125.6.9 725.20 kg 5,697 16,618 22,315
b. Tiang IWF 150.75.5.7 384.16 kg 5,697 16,618 22,315
c. Balok IWF 250.125.6.9 1,079.22 kg 5,697 16,618 22,315
d. Rafter IWF 150.75.5.7 683.20 kg 5,697 16,618 22,315
e. Regel 2 CNP 125.50.20.2,3 237.58 kg 5,697 16,618 22,315
2 Sambungan frame ( termasuk cat meni )
a. Detail A
- Base plate 300.175.8 12.00 bh 3,375 22,500 25,875
- Plat pengaku 8 mm 48.00 bh 3,375 22,500 25,875
- Mur baut angkur Ø16 48.00 bh 9,612 64,080 73,692
b. Detail B
- End plate 32.00 bh 3,375 22,500 25,875
- Baut HTB Ø1/2" sambungan IWF 192.00 bh 975 6,500 7,475
c. Detail C
- End plate 170.75.8 ( IWF 150.75.5.7 ) 8.00 bh 3,375 22,500 25,875
- Baut HTB Ø 1/2" sambungan rambudan rafter IWF 150.75.5.7 32.00 bh 975 6,500 7,475
- End plate 200.120.6 ( Regel 2 CNP 125.50.20.2,3 ) 12.00 bh 3,375 22,500 25,875
- Baut HTB sambungan regel 2 CNP 125 48.00 bh 975 6,500 7,475
- End plate 300.75.8 8.00 bh 3,375 22,500 25,875
- Pot IWF 150.75.5.7 56.00 kg 5,697 16,618 22,315
- Baut HTB sambungan IWF 150 64.00 bh 3,375 6,500 9,875
d. Detail D
- End plate 350.75.8 8.00 bh 3,375 22,500 25,875
- Pot IWF 150.75.5.7 56.00 kg 5,697 16,618 22,315
- Baut HTB sambungan IWF 150 32.00 bh 975 6,500 7,475
3 Plat Stiftener t = 6 mm (termasuk cat meni )
a. Tiang IWF 250.125.6.9 3.75 kg 5,697 16,618 22,315
b. Tiang IWF 150.75.5.7 1.80 kg 5,697 16,618 22,315
c. Balok IWF 250.125.6.9 4.50 kg 5,697 16,618 22,315
d. Rafter IWF 150.75.5.7 3.60 kg 5,697 16,618 22,315
4 Dudukan Gording Plat segitiga uk 125.75.8 atau besi siku 50.50.5 48.00 bh 5,697 16,618 22,315
( termasuk cat meni )
5 Gording dan Lisplank C 125.50.20.2,3 (termasuk cat meni ) 850.94 kg 5,697 16,618 22,315
6 Trekstang Ø 10 mm (termasuk cat meni ) 33.29 kg 668 12,402 13,070
7 Water mur 16 mm 8.00 bh 5,000 75,000 80,000
8 Ikatan angin Ø 16 mm ( termasuk cat meni ) 66.06 kg 668 12,402 13,070
9 Modifikasi atap existing ( sambungan dengan atap bangunan baru ) 15.70 m' 37,500 250,000 287,500
10 Thermal insulator
a. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di
bawah gording) 382.84 m² 2,250 15,000 17,250
b. Aluminium tape 319.00 m' 225 1,500 1,725
c. Pelat strip zincalume 0.45 mm untuk sambungan insulator di bawah
37.50 m' 1,275 8,500 9,775
gording ( termasuk cat meni )
11 Penutup Atap 1 ( A1 )
a. Talang zincalume t=0.35 mm 31.38 m' 23,256 51,467 74,723
b. plat strip 20.2 / 60 cm 60.00 kg 5,625 37,500 43,125
c. corong talang 7.00 bh 3,750 25,000 28,750
d. Silent tipe Outdoor u/ sambungan talang horizontal 4.00 m' 1,500 15,000 16,500
e. Atap Ex.Union metal MP Deck 0.35mm TCT 171.90 m² 23,256 51,467 74,723
f. Atap fiberglass t = 2 mm gelombang sesuai atap 19.52 m² 9,500 95,000 104,500
g. Paranet hitam ( di pasang di atas atap fiber glass ) 19.52 m² 7,000 70,000 77,000
h. Nok atap zincalum 0,35 mm TCT (m¹) di crimping (ujung nok dibentuk 23,256 51,467 74,723
15.70 m'
gelombang atap)
i. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 58.00 m' 3000 30000 33,000
12 Turbin Ventilator
a. Turbine ventilator 4.00 bh 275,000 2750000 3,025,000
b. Flashing zincalume u/ turbin 4.00 bh 10,888 108,881 119,769
c. Ram kawat u/ bagian bawah Turbin 4.00 bh 6,600 66,000 72,600
d. Pelubangan atap 4.00 ls 10,500 105,000 115,500
13 Pekerjaan Atap 2 ( A2 ) -
a. Rangka UNP 125.65.6.8 1,407.00 kg 5,697 16,618 22,315
b. Gording CNP 125.50.20.2,3 482.40 kg 5,697 16,618 22,315
c. Penutup atap MP Deck 0.35mm TCT 41.98 m² 23,256 51,467 74,723
d. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di
bawah gording) 83.97 m² 2,250 15,000 17,250
e. Atap fiberglass t = 2 mm gelombang sesuai atap ditambah paranet 4.10 m² 9,500 95,000 104,500
f. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 18.00 m' 3,000 30,000 33,000
g. Talang sanlon 9.00 m' 10,950 31,839 42,789
14 Pekerjaan Atap 3 ( A3 ) -
a. Bongkar atap existing 82.43 m² 1,400 1,400
b. Atap Ex.Union metal MP Deck 0.35mm TCT 82.43 m² 23,256 51,467 74,723
c. Thermal insulator Ex Zeltech ZT 01-B 2 82.43 m² 2,250 15,000 17,250
d. Perbaikan plafond existing akibat pekerjaan. 1.00 ls 250,000 250,000
15 Pekerjaan Atap 4 ( A4 ) -
a. Rangka UNP 125.65.6.8 612.65 kg 5,697 16,618 22,315
b. Gording CNP 125.50.20.2,3 706.45 kg 5,697 16,618 22,315
c. Atap Ex.Union metal MP Deck 0.35mm TCT 40.33 m² 23,256 51,467 74,723
d. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di 80.66 m² 2,250 15,000 17,250
bawah gording)
e. Atap fiberglass t = 2 mm gelombang sesuai atap +paranet 8.30 m² 9,500 95,000 104,500
f. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 13.18 m' 3,000 30,000 33,000
g. Talang sanlon 13.18 m' 10,950 31,839 42,789
16 Pekerjaan Atap 5 ( A5 ) -
a. Rangka UNP 125.65.6.8 485.21 kg 5,697 16,618 22,315
b. Gording CNP 125.50.20.2,3 661.96 kg 5,697 16,618 22,315
c. Atap Ex.Union metal MP Deck 0.35mm TCT 38.43 m² 23,256 51,467 74,723
d. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di 76.87 m² 2,250 15,000 17,250
bawah gording)
f. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 9.93 m' 3,000 30,000 33,000
g. Talang sanlon 5.20 m' 10,950 31,839 42,789
17 Pekerjaan Atap 6 ( A6 ) -
a. Gording dan cladding CNP 125.50.20.2,3 1,215.65 kg 5,697 16,618 22,315
a. Rangka UNP 125.65.6.8 222.31 kg 5,697 16,618 22,315
b. Penutup atap dan cladding Ex.Union metal MP Deck 0.35mm TCT 19.36 m² 23,256 51,467 74,723
c. Thermal insulator Ex Zeltech ZT 01-B 2 lapis (di atas gording dan di 38.71 m² 2,250 15,000 17,250
bawah gording)
d. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 3.50 m' 3,000 30,000 33,000
e. Talang zincalume t=0.35 mm 3.50 m' 23,256 51,467 74,723
f. plat strip 20.2 / 60 cm 4.43 kg 1,100 16,618 17,718
18 Pekerjaan Atap 7 ( A7 ) -
a. Atap Ex.Union metal MP Deck 0.35mm TCT 38.42 m² 23,256 51,467 74,723
b. Nok atap zincalum 0,35 mm TCT (m¹) di crimping (ujung nok dibentuk
5.91 m' 23,256 51,467 74,723
gelombang atap)
c. End Cap Flashing zincalume 0,35 mm TCT (ujung atap pinggir) 5.91 m' 3,000 30,000 33,000
d. Talang zincalume t=0.35 mm 5.91 m' 23,256 51,467 74,723
e. plat strip 20.2 / 60 cm 9.74 kg 1,100 16,618 17,718
f. plat flashing 5.91 m' 3,000 30,000 33,000
g. Rangka UNP 125 316.80 kg 5,697 16,618 22,315
i. Gording dan Lisplank C 125.50.20.2,3 (termasuk cat meni ) 162.61 kg 5,697 16,618 22,315
j. Trekstang Ø 10 mm (termasuk cat meni ) 6.71 kg 668 12,402 13,070
k. Water mur 16 mm 4.00 bh 5,000 75,000 80,000
l. Ikatan angin Ø 16 mm ( termasuk cat meni ) 24.84 kg 668 12,402 13,070
19 Pekerjaan Atap 8 ( A8 ) -
a. Atap Ex.Union metal MP Deck 0.35mm TCT 14.00 m² 23,256 51,467 74,723
b. Rangka hollow 40.40.2 (tebal 2 mm) 62.95 kg 1,100 16,618 17,718
20 Pekerjaan Atap 9 ( A9 ) -
a. Atap Ex.Union metal MP Deck 0.35mm TCT 10.20 m² 23,256 51,467 74,723
b. plat flashing 5.10 m' 3,000 30,000 33,000
c. Rangka atap dan gording hollow 40.40.4 62.95 kg 1,100 16,618 17,718
21 Perbaikan insulator atap existing Thermal insulator Ex Zeltech ZT 01-B di 152.00 m² 1,000 10,000 11,000
bawah gording
22 Cor Beton K 225 atau campuran 1:2:3 + Tulangan kolom dan balok -
a. Kolom beton tanpa tulangan ( P ) 0.55 m³ 116,586 1,086,154 1,202,740
b. Kolom praktis ( KP ) 1.52 m³ 487,053 7,640,204 8,127,257
c. Balok Beton ( B1 ) 1.46 m³ 420,588 3,722,050 4,142,638
d. Ringbalk ( R1 ) 1.42 m³ 237,787 1,347,458 1,585,245
Subtotal
F Pekerjaan Dinding, Pasangan, Plesteran dan Acian
1 Angkur Ø8" P = 50 cm tiap jarak 60 cm dipasang di tiang IWF 154.00 bh 850 7,650 8,500
2 Dinding pasangan bata merah 1:2 trassram = 80 cm untuk keliling bangunan 44.40 m² 16,425 59,532 75,957
3 Dinding pasangan bata merah 1:2 trassram = 140 cm untuk KM/WC, Janitor, 20.44 m² 16,425 59,532 75,957
4 & T. buatpas
Dinding es bata merah 1:4 di atas trassram 270.20 m² 16,425 50,602 67,027
5 Plesteran trassram 1:2 109.24 m² 19,440 12,279 31,719
6 Plesteran di atas trassram 1:4 540.40 m² 19,440 10,435 29,875
7 Acian dinding dalam dan luar 605.24 m² 12,960 4,124 17,084
8 Pasang glassblock + tali air 128.00 bh 9,000 20,000 29,000
9 Pasang Rooster + tali air 700.00 bh 3,000 5,000 8,000
10 Pasangan dinding keramik uk. 20X25 putih kilap ex roman kw 1 (u/ WC) -
a. R. 36.a 8.25 m² 58,320 72,905 131,225
b. R. 36.b 8.25 m² 58,320 72,905 131,225
c. R. 36.c 10.80 m² 58,320 72,905 131,225
11 Pekerjaan Meja beton ( R 31 ) -
a. Beton 1:2:3 + tulangan tebal 10 cm 0.22 m³ 1,049,186 5,945,387 6,994,573
b. Sink ex. Royal ST3 + aksesoris 1.00 unit 33,750 337,500 371,250
c. Pasangan keramik meja beton dan dinding 30x30 putih kilap ex Roman 5.24 m² 45,360 65,468 110,828
d. Plint miring keramik 13.70 m' 8,577 9,698 18,275
e. Kran San-Ei type A286JC – PA286JC ( type bebek flexible) 1.00 bh 5,850 58,500 64,350
f. Pemasangan saringan bakso (MBO) 1.00 bh 108,000 108,000
g. Rumah gas + pintu teralis (utk meja beton 1) 1.00 unit 112,500 637,500 750,000
h. Pipa+Fitting + asesoris 1.00 ls 12,500 112,500 125,000
12 Pekerjaan Meja beton ( R 33 ) -
a. Beton 1:2:3 + tulangan tebal 10 cm 0.11 m³ 2,098,372 11,890,774 13,989,145
b. Sink ex. Royal ST3 1.00 unit 33,750 337,500 371,250
c. Pasangan keramik meja beton dan dinding 30x30 putih kilap ex Roman 2.47 m² 45,360 65,468 110,828
d. Plint miring keramik 5.70 m' 8,577 9,698 18,275
e. Kran San-Ei type A286JC – PA286JC ( type bebek flexible) 1.00 bh 5,850 58,500 64,350
f. Pemasangan saringan bakso (MBO) 1.00 bh 108,000 108,000
g. Rumah gas + pintu teralis (utk meja beton 1) 1.00 unit 112,500 637,500 750,000
h. Pipa+Fitting + asesoris 2.00 ls 12,500 112,500 125,000
13 Pekerjaan T. Cuci ( R. 39 ) -
a. Cor rabat 1:3:5 tebal 8 cm 0.23 m³ 37,809 23,415 61,224
b. Pasangan keramik lantai 30x30 ex roman warna putih doff 2.93 m² 45,360 65,468 110,828
c. Pasangan keramik dinding 30x30 cm ex roman warna putih kilap 2.79 m² 45,360 65,468 110,828
d. Plint miring keramik 2.40 m' 8,577 9,698 18,275
e. Floordrain ex Alinco 1990 ABS ball 1.00 bh 24,750 247,500 272,250
14 Pekerjaan washtafel tinggi 85 cm ( R. 37 ) -
a. Washtafel ex TOTO tipe L548 + asesoris + dudukan 1.00 unit 24,750 247,500 272,250
b. Beton 1:2:3 + tulangan tebal 8 cm 0.04 m³ 2,671,538 15,138,716 17,810,255
c. Balok beton 14x20 + tulangan 0.03 m³ 3,847,015 21,799,752 25,646,767
d. Top table keramik 30x30 ex. Roman KW 1 warna putih 0.54 m² 45,360 65,468 110,828
e. Cermin 5 mm ukuran 90x75 cm 1.00 unit 64,054 96,600 160,654
f. Kran washtafel type TX 108 LD ex. TOTO 1.00 bh 6,500 65,000 71,500
g. Pemasangan saringan bakso (MBO) 1.00 bh 108,000 108,000
h. Instalasi pipa buangan 1.00 ls 4,500 45,000 49,500
15 Pekerjaan T. Buat Es -
a. Pasangan keramik lantai 30x30 ex roman warna putih doff 3.63 m² 45,360 65,468 110,828
b. Pemasangan saringan bakso (MBO) 1.00 bh 108,000 108,000
c. Instalasi pipa buangan 1.00 ls 4,500 45,000 49,500
16 Pekerjaan Penutup Rooster ( Rangka plat strip 20.2 mm dan penutup ram 2.08 m² 5,147 51,467 56,614
kawat 50 x 10 Ø 1,63 mm )
17 Pekerjaan Ventilasi Atas ( Rangka besi siku 50.50.5 dan penutup kawat 50 x 12.20 m² 9,495 73,945 83,440
10 Ø 1,63 mm )
18 Pekerjaan Dudukan Genset 1.00 unit 125,000 1,250,000 1,375,000
19 Pekerjaan Dudukan Pompa 2.00 unit 35,000 350,000 385,000
20 Pekerjaan Tempat Sampah 1.00 unit 45,000 450,000 495,000
Subtotal
G Pekerjaan Lantai -
1 Plat galvanis 1.8mm (2.4x1.2x2) + rangka + zincromate + cat ( Cor Monolit ) 5.76 m² 158,535 142,800 301,335
2 Lantai F1 -
a. Urugan pasir tebal 10 cm bawah lantai 14.80 m³ 10,080 54,432 64,512
b. Plastik cor 148.38 m² 500 3,000 3,500
c. Beton ready mix K-225 (1:2:3) tebal 10 cm + wire mesh M-5 tunggal 14.84 m³ 111,489 631,774 743,263
d. Finishing floorhardener ex. Fosroc dosis 5 kg/m² warna netral + trowel
halus (m³) 148.38 m² 5,000 70,000 75,000
e. Dilatasi pengecoran (cutting lantai + sillent) 225.92 m' 3,000 6,000 9,000
3 Lantai F2 -
a. Urugan pasir tebal 10 cm bawah lantai 4.90 m³ 10,080 54,432 64,512
b. Plastik cor 49.15 m² 500 3,000 3,500
c. Beton ready mix K-225 (1:2:3) tebal 7 cm + wire mesh M-5 tunggal 3.44 m³ 111,489 631,774 743,263
d. Finishing lantai putih kilap 30 x 30 cm ex roman KW 1 49.15 m² 45,360 65,468 110,828
4 Lantai F3 -
a. Urugan pasir tebal 10 cm bawah lantai 0.20 m³ 10,080 54,432 64,512
b. Plastik cor 2.08 m² 500 3,000 3,500
c. Beton ready mix K-225 (1:2:3) tebal 7 cm + wire mesh M-5 tunggal 1.46 m³ 111,489 631,774 743,263
d. Finishing lantai putih kilap 20 x 20 cm ex roman KW 1 2.08 m² 45,360 64,633 109,993
5 Lantai F4 -
a. Urugan pasir tebal 10 cm bawah lantai 2.71 m³ 10,080 54,432 64,512
b. Plastik cor 27.14 m² 500 3,000 3,500
c. Beton ready mix K-150 (1:3:5) tebal 10 cm 2.71 m³ 111,489 631,774 743,263
d. Finishing lantai aci roll 27.14 m² 12,960 4,124 17,084
6 Lantai F5 -
a. Urugan sirtu 10 cm bawah lantai 10.56 m³ 9,450 120,420 129,870
7 Plint miring Keramik -
a. Keramik 20 x 20 ( R. 36 a – c ) 16.42 m' 8,577 9,698 18,275
b. Keramik 30 x 30 ( R. 39 ) 4.80 m' 8,577 9,698 18,275
8 Plint tegak keramik ( pertemuan lantai keramik dengan dinding ) 48.06 m' 8,577 9,698 18,275
9 Cutting lantai gudang 232.38 m' 3,000 6,000 9,000
10 Penutupan Void ex tangga Lt 2 Bangunan Existing -
a. Rangka CNP 125.55.20.2,3 30.39 kg 5,697 16,618 22,315
b. Pengaku L 40.40.4 11.44 kg 1,100 16,618 17,718
d. Multipleks 18 mm 3.60 m² 20,500 205,000 225,500
11 Penutupan Void u/ akses konekting Lt 2
a. Rangka CNP 125.55.20.2,3 175.56 kg 5,697 16,618 22,315
b. Pengaku L 40.40.4 4.00 kg 1,100 11,000 12,100
d. Multipleks 18 mm 6.60 m² 20,000 200,000 220,000
12 Cor Beton K 225 atau campuran 1:2:3 + Tulangan Lantai 2
a. connector gudang dan bangunan rumah lama t = 12 cm 0.79 m³ 525,000 2,975,000 3,500,000
13 Siku 40.40.4 untuk sudutan lantai pintu masuk intransit 2.00 m' 1,100 11,000 12,100
Sub Total
H Pekerjaan Partisi
1 Rangka partisi ex. Jayaboard terdiri dari : 153.38 m² 31,824 42,525 74,349
- Holllow 40.40.2 -
2 Penutup partisi -
a. W2 ( Multiplek 6 mm + partisi teakwood tinggi 1,2 & diatasnya gypsum 9 66.92 m² 9,153 91,530 100,683
mm
b. W3) ( partisi multiplek 6 mm ) 139.06 m² 3,281 32,813 36,094
c. W4 ( partisi multiplek 6 mm + ram kawat ) 32.40 m² 3,281 32,813 36,094
d. W5 ( gypsum 9 mm ) 59.03 m² 3,193 31,932 35,125
e. W6 (gypsum 9 mm untuk sekat kantor t=1,2 m) 9.36 m² 3,193 31,932 35,125
3 List profil 1,5 x 90 mm (plint tegak) 125.64 m¹ 2,955 26,592 29,547
4 Ram kawat 50 x 10 Ø 1,63 mm 47.58 m² 3,562 32,058 35,620
Sub Total
I Pekerjaan Kusen Pintu & Jendela
1 Kusen Pintu Kayu + asesoris sesuai gambar (list kusen dll)
a. P1 1.00 bh 9,253 83,279 92,532
b. P2 3.00 bh 9,253 83,279 92,532
c. P3 2.00 bh 9,253 83,279 92,532
d. P4 1.00 bh 9,253 83,279 92,532
e. P5 1.00 bh 9,253 83,279 92,532
f. P6 1.00 bh 9,253 83,279 92,532
g. PJ1 2.00 bh 9,253 83,279 92,532
h. PJ2 1.00 bh 9,253 83,279 92,532
2 Daun pintu Kayu + asesoris sesuai gambar (lipping daun pintu, engsel, -
handle,
a. P1 tipe kunci dll) 1.00 bh 187,500 1,062,500 1,250,000
b. P2 3.00 bh 172,500 977,500 1,150,000
c. P3 2.00 bh 187,500 1,062,500 1,250,000
d. P4 1.00 bh 187,500 1,062,500 1,250,000
e. P5 2.00 bh 112,500 637,500 750,000
f. P6 1.00 bh 112,500 637,500 750,000
g. PJ1 2.00 bh 232,500 1,317,500 1,550,000
h. PJ2 1.00 bh 217,500 1,232,500 1,450,000
3 Kusen Jendela & Sawangan Kayu -
a. J1 5.00 bh 27,389 246,505 273,895
b. J2 1.00 bh 36,087 324,787 360,875
c. Sw 5.00 bh 41,497 373,474 414,971
4 Daun jendela & kaca sawangan + asesoris sesuai gambar (engsel, slot dan -
tarikan
a. J1 dll) 5.00 bh 41,250 233,750 275,000
b. J2 2.00 bh 22,692 128,586 151,277
c. Sw 10.00 bh 22,908 129,810 152,718
5 Kusen & Daun Pintu PVC + asesoris sesuai gambar ( Klos kayu u/ kusen 3.00 bh 67,500 450,000 517,500
6 pintu, engsel, akrilik , tarikan dll)
Pintu Besi -
a. PB1 1.00 bh 100,700 402,800 503,500
b. PB2 1.00 bh 106,058 424,230 530,288
c. PB3 1.00 bh 100,700 402,800 503,500
7 Pintu maintanance outdor coolroom 1.00 unit 300,000 1,200,000 1,500,000
Sub Total
J Pekerjaan Plafond
1 Rangka metal furing ex boral 226.52 m² 16,169 91,622 107,790
2 Penutup Plafond gypsum 9 mm ex Jayaboard 226.52 m² 4,790 27,142 31,932
3 Penutup Ram kawat 50 x 10 Ø 1,63 mm u/ R5 + Plat strip 20.2 mm 2.00 m² 12,516 70,924 83,440
Sub Total
K Pekerjaan Sanitair
1 Kloset jongkok ex TOTO tipe CE-7 warna putih 2.00 bh 64,979 368,213 433,192
2 Pemasangan Tahapan kaca 8mm 4.00 bh 18,750 106,250 125,000
3 Pemasangan Gantungan sikat (MBO) 4.00 bh 5,000 5,000
4 Pemasangan Kapstock plastik (MBO) 4.00 bh 5,000 5,000
5 Pekerjaan Dak Torn -
a. Cor Beton K 225 atau campuran 1:2:3 + Tulangan 1.22 m³ 364,882 6,932,762 7,297,644
b. Waterproofing + screading + finishing acian 4.47 m² 12,960 76,100 89,060
c. Tangga monyet 1.00 unit 225,000 525,000 750,000
d. Torn 1000 L 2.00 bh 274,500 2,342,000 2,616,500
6 Pekerjaan Torn Tanam -
a. Galian tanah 6.12 m³ 31,185 31,185
b. Torn 1000 L 1.00 bh 75,000 2,342,000 2,417,000
c. Urugan pasir 2.04 m³ 10,080 54,432 64,512
Sub Total
L Pekerjaan Air Kotor
1 Pipa PVC Maspion o 4" kelas AW 90.40 m' 10,950 44,634 55,585
2 Sambungan pipa Maspion klas AW (termasuk knee + T) 1.00 ls 35,000 315,000 350,000
3 Pipa Vent Ø ½" di KM/WC 3.00 bh 4,865 11,307 16,173
4 Floordrain ex Alinco 1990 ABS ball 3.00 bh 6,660 157,500 164,160
5 Bak kontrol (BK) : 2.00 unit 25,000 225,000 250,000
a. Pasangan bata 1.92 m² 16,425 50,602 67,027
b. Plester + aci dinding dalam 1.92 m² 4,696 42,262 46,958
c. Tutup BK 2.00 unit 15,000 135,000 150,000
6 Pekerjaan Biofil BF03 2.00 unit 978,750 6,525,000 7,503,750
Sub Total
M Pekerjaan Air Hujan
1 Talang vertikal Maspion kelas D Ø 4" 96.00 m' 10,950.30 31,839.19 42,789
2 Sambungan pipa ex Maspion kelas D termasuk sock T 1.00 ls 9,360.00 84,240.00 93,600
3 Klem pipa 4” ke dinding (plat strip 20x2 - termasuk zincromate & cat) 1.00 ls 21,470.40 193,233.60 214,704
4 Rembesan air hujan buis beton Ø80cm + Manhole beton 1:2:3 t=10 cm 2.00 unit 75,000.00 675,000.00 750,000
Sub Total
N Pekerjaan Pengecatan
1 Dempul untuk dinding dalam 441.19 m² 1,065 9,585 10,650
2 Dempul untuk plafond dalam 106.15 m² 1,065 9,585 10,650
3 Dempul Impra + politur untuk partisi teakwood 226.52 m² 4,406 27,194 31,599
4 Dempul partisi multiplek 171.46 m² 1,157 4,626 5,783
5 Dempul Impra + Pinoguard untuk kusen 69.82 m¹ 2,962 11,848 14,810
6 Dempul Impra + politur untuk daun pintu 36.74 m² 6,320 25,279 31,599
7 Dempul Impra + Pinoguard untuk daun jendela 9.72 m² 6,320 25,279 31,599
8 Dempul Impra + Pinoguard walnut : -
a. Profil 1,5 x 9 cm 86.95 m' 1,900 7,600 9,500
b. List kayu 86.95 m' 1,900 7,600 9,500
9 Cat dinding luar ex. Mowilex orange dream 560.60 m² 4,586 33,237 37,823
10 Cat dinding dalam ex vinylex apple white 1,652.36 m² 4,586 9,585 14,171
11 Cat partisi multiplek ex vinylex apple white 171.46 m² 4,586 9,585 14,171
12 Cat plafond dalam ex vinylex super white 226.52 m² 4,586 9,585 14,171
13 Cat Talang vertikal air hujan ex. Seiv bahama brown 96.00 m¹ 3,000 7,500 10,500
14 Zincromate ICI abu
Sub Total
O Pekerjaan Lain – Lain
1 Tempat Jemur meliputi pekerjaan
a. Rangka Tiang Jemur 65.63 kg 8,829 23,805 32,634
b. Kawat jemur 1.00 ls 67,500 382,500 450,000
2 Dudukan Mesin coldroom, 1.00 unit 187,500 1,062,500 1,250,000
3 Tahanan Ban motor 10.00 bh 37,500 312,500 350,000
4 Grill Tangga 3.00 bh 250,000 250,000
5 Pekerjaan Benteng, pondasi, & Kawat Duri 34.80 m¹ 260,566 1,476,542 1,737,108
Sub Total

Total
Fee Pemborong 10 % ???
Grand Total
Dibulatkan
encana Anggaran Biaya
(RAB)

TOTAL

4,800,000
600,000
22,839,408

632,772
2,205,000
1,000,000
-
350,000
1,871,388
1,800,000
36,098,568

6,500,000
750,000
2,250,000
3,000,000
12,500,000
###
1,305,092

1,236,173
180,249
64,241
49,272
56,757
-
502,200
569,880
18,960
1,393,800
21,840

174,182
232,243
43,868
48,384
29,030
23,224
1,097,712

2,195,235
164,997
9,407,342

1,653,056
276,734
-
15,541,641
3,862,547
1,882,857

8,264,822
1,306,841
1,623,942
307,492
105,700
3,383,424
3,383,424
41,592,480

16,182,475
8,572,338
24,082,255
15,245,266
5,301,479

310,500
1,242,000
3,537,216

828,000
1,435,200

207,000
239,200
310,500
358,800
207,000
1,249,612
632,000

207,000
1,249,612
239,200

83,679
40,166
100,415
80,332
1,071,096

18,988,301
435,106
640,000
863,416
4,513,750

6,603,990
550,275
366,563

2,344,798
2,587,500
201,250
66,000
12,844,832
2,039,840
1,503,040
1,173,146

1,914,000

12,100,000
479,074
290,400
462,000
-
31,396,502
10,764,515
3,137,158
1,448,448
428,032
594,000
385,105
-
115,405
6,159,542
1,421,952
250,000
-
13,670,934
15,764,034
3,013,694
1,391,444

867,611
434,940
563,965
-
10,827,308
14,771,306
2,871,832
1,325,945

327,690
222,505
-
27,126,577
4,960,647
1,446,258
667,748

115,500
261,529
78,400
-
2,870,473
441,611
195,030
441,611
172,480
195,030
7,069,234
3,628,605
87,740
320,000
324,633
-
1,046,118
1,115,352
-
762,172
168,300
1,115,352
1,672,000

-
666,558
12,374,358
6,053,223
2,252,316
353,762,345

1,309,000
3,372,484
1,552,558
18,110,709
3,465,016
16,144,428
10,340,071
3,712,000
5,600,000
-
1,082,602
1,082,602
1,417,225
-
1,510,828
371,250
580,740
250,371
64,350
108,000
750,000
125,000
-
1,594,763
371,250
273,746
104,169
64,350
108,000
750,000
250,000
-
13,812
324,505
308,657
43,861
272,250
-
272,250
769,403
646,299
59,847
160,654
71,500
108,000
49,500
-
402,528
108,000
49,500
117,756

1,017,970

1,375,000
770,000
495,000
81,901,803
-
1,735,688
-
954,778
519,318
11,028,276
11,128,238
2,033,280
-
316,109
172,027
2,557,228
5,447,275
-
12,902
7,277
1,081,671
228,675
-
175,094
94,995
2,017,312
463,689
-
1,371,396
-
300,079
87,721
878,307
2,091,420
-
678,178
202,709
811,800

3,917,534
48,400
1,452,000

2,772,000
24,200
54,585,373

11,403,947
-
-
6,737,722
5,019,269
1,169,438
2,073,300
328,772
3,712,169
1,694,643
32,139,260

462,660
1,387,980
925,320
462,660
603,309
464,511
1,436,097
718,048
-
1,250,000
3,450,000
2,500,000
1,250,000
1,500,000
750,000
3,100,000
1,450,000
-
1,369,474
360,875
2,074,856
-
1,375,000
302,555
1,527,182
1,552,500
-
503,500
530,288
503,500
1,500,000
33,310,314

24,417,049
7,233,372
166,546
31,816,967

866,384
500,000
20,000
20,000
-
8,899,477
397,742
750,000
5,233,000
-
190,946
2,417,000
131,669
19,426,218

5,024,855
350,000
48,518
492,480
500,000
128,692
90,159
300,000
15,007,500
21,942,204

4,107,791
93,600
214,704
1,500,000
5,916,095

4,698,652
1,130,476
7,157,940
991,479
1,033,999
1,160,903
307,142
-
826,039
826,039
21,203,798
23,416,255
2,429,857
3,210,166
1,008,000
-
69,400,744

2,141,672
450,000
1,250,000
3,500,000
750,000
60,451,351
68,543,023

872,342,735
87,234,274
959,577,009
959,577,000
PEMERINTAH KOTA KEDIRI
DINAS PEKERJAAN UMUM KOTA KEDIRI
ANALISA HARGA SATUAN PEKERJAAN
HSPBJ (DAU) TAHUN ANGGARAN 2015

A.6. HARGA SATUAN PEKERJAAN PERSIAPAN

2. Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter A.6.-1#2
``
Harga Satuan Harga Satuan Jumlah Harga Satuan
Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Dolken Kayu F 8 - 10/400 cm btg 1.2500 29,700.00 37,125.00
PC kg 2.5000 1,269.00 3,172.50
Seng Gelombang lbr 1.2000 71,460.00 85,752.00
Pasir Beton m3 0.0050 104,850.00 524.25
Koral Beton m3 0.0090 181,800.00 1,636.20
Kayu 5/7 m3 0.0720 4,410,000.00 317,520.00
Paku Biasa 2 - 5" kg 0.0600 14,220.00 853.20
Meni Besi ltr 0.4500 16,425.00 7,391.25
Tenaga Kerja :
Pekerja oh 0.4000 31,500.00 12,600.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0200 63,000.00 1,260.00
0.6400 453,974.40 25,920.00 479,894.40
Harga per satuan pekerjaan dibulatkan 479,894.00

4. Mengukur dan memasang bouwplank per 1 m'/unit

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu 5/7 m3 0.0120 4,410,000.00 52,920.00
Paku Biasa 2 - 5" kg 0.0200 14,220.00 284.40
Kayu Meranti (papan) m3 0.0070 4,410,000.00 30,870.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0050 63,000.00 315.00
0.2150 84,074.40 9,495.00 93,569.40
Harga per satuan pekerjaan dibulatkan 93,569.00

5. Membuat 1 m2 kantor sementara dengan lantai plesteran

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Dolken Kayu F 8 - 10/400 cm btg 1.2500 29,700.00 37,125.00
Kayu m3 0.1800 4,410,000.00 793,800.00
Paku Biasa kg 0.8500 14,220.00 12,087.00
Besi Strip kg 1.1000 13,157.50 14,473.25
PC kg 35.0000 1,269.00 44,415.00
Pasir Pasang m3 0.1500 104,850.00 15,727.50
Pasir Beton m3 0.1000 104,850.00 10,485.00
Koral Beton m3 0.1500 181,800.00 27,270.00
Bata Merah bh 30.0000 450.00 13,500.00
Seng Plat lbr 0.2500 68,184.00 17,046.00
Jendela Nako bh 2.0000 315,000.00 630,000.00
Kaca Polos m2 0.0800 86,940.00 6,955.20
Kunci Tanam bh 0.1500 61,020.00 9,153.00
Plywood 4 mm lbr 0.0600 73,350.00 4,401.00
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Batu/Kayu oh 2.0000 54,000.00 108,000.00
Kepala Tukang oh 0.3000 63,000.00 18,900.00
Mandor oh 0.0500 63,000.00 3,150.00
3.3500 1,636,437.95 161,550.00 1,797,987.95
Harga per satuan pekerjaan dibulatkan 1,797,987.00
6. Membuat 1 m2 gudang semen dan alat-alat A.6.-2#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Dolken Kayu F 8 - 10/400 cm btg 1.7000 29,700.00 50,490.00
Kayu m3 0.2100 4,410,000.00 926,100.00
Paku Biasa kg 0.3000 14,220.00 4,266.00
PC kg 10.5000 1,269.00 13,324.50
Pasir Beton m3 0.0300 104,850.00 3,145.50
Koral Beton m3 0.0500 181,800.00 9,090.00
Seng Gelombang lbr 1.5000 71,460.00 107,190.00
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Batu/Kayu oh 2.0000 54,000.00 108,000.00
Kepala Tukang oh 0.2000 63,000.00 12,600.00
Mandor oh 0.0500 63,000.00 3,150.00
3.2500 1,113,606.00 155,250.00 1,268,856.00
Harga per satuan pekerjaan dibulatkan 1,268,856.00

8. Membersihkan 1 m2 lapangan dan peralatan

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Mandor oh 0.0050 63,000.00 315.00
0.1050 3,465.00 3,465.00
Harga per satuan pekerjaan dibulatkan 3,465.00

11. Membuat 1 m2 stegger dari bambu ukuran (40 x 50 x 20) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Bambu dia 06 - 10/600 cm btg 1.0000 15,300.00 15,300.00
Tali Ijuk kg 0.2500 31,185.00 7,796.25
Tenaga Kerja :
Pekerja oh 0.2500 31,500.00 7,875.00
Tukang Kayu oh 0.0170 54,000.00 918.00
Kepala Tukang oh 0.0020 63,000.00 126.00
Mandor oh 0.0130 63,000.00 819.00
0.2820 23,096.25 9,738.00 32,834.25
Harga per satuan pekerjaan dibulatkan 32,834.00

13. Membongkar 1 m3 beton bertulang

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 6.6670 31,500.00 210,010.50
Mandor oh 0.3330 63,000.00 20,979.00
7.0000 230,989.50 230,989.50
Harga per satuan pekerjaan dibulatkan 230,989.00

14. Membongkar 1 m3 dinding tembok bata merah

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 6.6670 31,500.00 210,010.50
Mandor oh 0.0330 63,000.00 2,079.00
6.7000 212,089.50 212,089.50
Harga per satuan pekerjaan dibulatkan 212,089.00
A.6. 2. M1 479,894.00

A.6. 4. M1 93,569.00

A.6. 5. M2 1,797,987.00
A.6. 6. M2 1,268,856.00

A.6. 8. M2 3,465.00

A.6. 11. M2 32,834.00

A.6. 13. M3 230,989.00

A.6. 14. M3 212,089.00


B.6. HARGA SATUAN PEKERJAAN TANAH

1. Menggali 1 m3 tanah biasa sedalam 1 m B.6.-1#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.7500 31,500.00 23,625.00
Mandor oh 0.0250 63,000.00 1,575.00
0.7750 25,200.00 25,200.00
Harga per satuan pekerjaan dibulatkan 25,200.00

2. Menggali 1 m3 tanah biasa sedalam 2 m

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.9000 31,500.00 28,350.00
Mandor oh 0.0450 63,000.00 2,835.00
0.9450 31,185.00 31,185.00
Harga per satuan pekerjaan dibulatkan 31,185.00

4. Menggali 1 m3 tanah keras sedalam 1 m

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Mandor oh 0.0320 63,000.00 2,016.00
1.0320 33,516.00 33,516.00
Harga per satuan pekerjaan dibulatkan 33,516.00

5. Menggali 1 m3 tanah cadas sedalam 1 m

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 1.5000 31,500.00 47,250.00
Mandor oh 0.0600 63,000.00 3,780.00
1.5600 51,030.00 51,030.00
Harga per satuan pekerjaan dibulatkan 51,030.00

6. Menggali 1 m3 tanah lumpur sedalam 1 m

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 1.2000 31,500.00 37,800.00
Mandor oh 0.0450 63,000.00 2,835.00
1.2450 40,635.00 40,635.00
Harga per satuan pekerjaan dibulatkan 40,635.00

7. Mengerjakan 1 m2 stripping tebing setinggi 1 m

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.0500 31,500.00 1,575.00
Mandor oh 0.0050 63,000.00 315.00
0.0550 1,890.00 1,890.00
Harga per satuan pekerjaan dibulatkan 1,890.00

8. Membuang 1 m3 tanah sejauh 15 m

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.3300 31,500.00 10,395.00
Mandor oh 0.0100 63,000.00 630.00
0.3400 11,025.00 11,025.00
Harga per satuan pekerjaan dibulatkan 11,025.00

9. Mengurug kembali 1 m3 galian

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.2500 31,500.00 7,875.00
Mandor oh 0.0083 63,000.00 525.00
0.2583 8,400.00 8,400.00
Harga per satuan pekerjaan dibulatkan 8,400.00
10. Memadatkan 1 m3 tanah (per 20 cm) B.6.-2#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.5000 31,500.00 15,750.00
Mandor oh 0.0500 63,000.00 3,150.00
0.5500 18,900.00 18,900.00
Harga per satuan pekerjaan dibulatkan 18,900.00

11. Mengurug 1 m3 pasir urug

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Pasir Urug m3 1.2000 45,360.00 54,432.00
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Mandor oh 0.0100 63,000.00 630.00
0.3100 54,432.00 10,080.00 64,512.00
Harga per satuan pekerjaan dibulatkan 64,512.00

14. Memasang 1 m2 lapisan ijuk tebal 10 cm, untuk bidang resapan

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Ijuk kg 6.0000 31,185.00 187,110.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Mandor oh 0.0150 63,000.00 945.00
0.1650 187,110.00 5,670.00 192,780.00
Harga per satuan pekerjaan dibulatkan 192,780.00

15. Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Pasir Batu m3 1.2000 100,350.00 120,420.00
Tenaga Kerja :
Pekerja oh 0.2500 31,500.00 7,875.00
Mandor oh 0.0250 63,000.00 1,575.00
0.2750 120,420.00 9,450.00 129,870.00
Harga per satuan pekerjaan dibulatkan 129,870.00

15.a. Mengurug 1 m3 tanah urug

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Tanah Urug m3 1.2000 40,500.00 48,600.00
Tenaga Kerja :
Pekerja oh 0.2500 31,500.00 7,875.00
Mandor oh 0.0250 63,000.00 1,575.00
0.2750 48,600.00 9,450.00 58,050.00
Harga per satuan pekerjaan dibulatkan 58,050.00

15.b. Mengurug 1 m3 gravel (semen merah)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Semen Merah m3 1.2000 181,800.00 218,160.00
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Mandor oh 0.0200 63,000.00 1,260.00
0.2200 218,160.00 7,560.00 225,720.00
Harga per satuan pekerjaan dibulatkan 225,720.00
B.6. 1. M3 25,200.00

B.6. 2. M3 31,185.00

B.6. 4. M3 33,516.00

B.6. 5. M3 51,030.00

B.6. 6. M3 40,635.00

B.6. 7. M2 1,890.00

B.6. 8. M3 11,025.00

B.6. 9. M3 8,400.00
B.6. 10. M3 18,900.00

B.6. 11. M3 64,512.00

B.6. 14. M2 192,780.00

B.6. 15. M3 129,870.00

B.6. 15.a. M3 58,050.00

B.6. 15.b. M3 225,720.00


C.6. HARGA SATUAN PEKERJAAN PONDASI

2. Memasang 1 m3 pondasi batu kali, campuran 1 PC : 2 PP C.6.-1#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Batu Belah 15/20 cm m3 1.1000 151,200.00 166,320.00
PC kg 267.0000 1,269.00 338,823.00
Pasir Pasang m3 0.4270 104,850.00 44,770.95
Tenaga Kerja :
Pekerja oh 1.5000 31,500.00 47,250.00
Tukang Batu oh 0.6000 54,000.00 32,400.00
Kepala Tukang oh 0.0600 63,000.00 3,780.00
Mandor oh 0.0750 63,000.00 4,725.00
2.2350 549,913.95 88,155.00 638,068.95
Harga per satuan pekerjaan dibulatkan 638,068.00

5. Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Batu Belah 15/20 cm m3 1.1000 151,200.00 166,320.00
PC kg 163.0000 1,269.00 206,847.00
Pasir Pasang m3 0.5200 104,850.00 54,522.00
Tenaga Kerja :
Pekerja oh 1.5000 31,500.00 47,250.00
Tukang Batu oh 0.7500 54,000.00 40,500.00
Kepala Tukang oh 0.0750 63,000.00 4,725.00
Mandor oh 0.0750 63,000.00 4,725.00
2.4000 427,689.00 97,200.00 524,889.00
Harga per satuan pekerjaan dibulatkan 524,889.00

7. Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Batu Belah 15/20 cm m3 1.1000 151,200.00 166,320.00
PC kg 117.0000 1,269.00 148,473.00
Pasir Pasang m3 0.5610 104,850.00 58,820.85
Tenaga Kerja :
Pekerja oh 1.5000 31,500.00 47,250.00
Tukang Batu oh 0.7500 54,000.00 40,500.00
Kepala Tukang oh 0.0750 63,000.00 4,725.00
Mandor oh 0.0750 63,000.00 4,725.00
2.4000 373,613.85 97,200.00 470,813.85
Harga per satuan pekerjaan dibulatkan 470,813.00

14. Memasang 1 m3 batu kosong (aanstamping)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Batu Belah 15/20 cm m3 1.2000 151,200.00 181,440.00
Pasir Urug m3 0.4320 45,360.00 19,595.52
Tenaga Kerja :
Pekerja oh 0.7800 31,500.00 24,570.00
Tukang Batu oh 0.3900 54,000.00 21,060.00
Kepala Tukang oh 0.0390 63,000.00 2,457.00
Mandor oh 0.0390 63,000.00 2,457.00
1.2480 201,035.52 50,544.00 251,579.52
Harga per satuan pekerjaan dibulatkan 251,579.00

15. Memasang 1 m3 pondasi siklop, 60 % beton, campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Batu Belah 15/20 cm m3 0.4800 151,200.00 72,576.00
PC kg 194.0000 1,269.00 246,186.00
Pasir Beton m3 0.3120 104,850.00 32,713.20
Koral m3 0.4680 181,800.00 85,082.40
Besi Beton kg 126.0000 11,520.00 1,451,520.00
Kawat Beton kg 1.8000 20,425.00 36,765.00
Tenaga Kerja :
Pekerja oh 3.4000 31,500.00 107,100.00
Tukang Batu oh 0.8500 54,000.00 45,900.00
Kepala Tukang oh 0.0850 63,000.00 5,355.00
Mandor oh 0.1700 63,000.00 10,710.00
4.5050 1,924,842.60 169,065.00 2,093,907.60
Harga per satuan pekerjaan dibulatkan 2,093,907.00

16. Memasang 1 m3 pondasi sumuran diameter 100 cm C.6.-2#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Batu Belah 15/20 cm m3 0.4500 151,200.00 68,040.00
PC kg 194.0000 1,269.00 246,186.00
Pasir Beton m3 0.3120 104,850.00 32,713.20
Koral m3 0.4680 181,800.00 85,082.40
Tenaga Kerja :
Pekerja oh 2.4000 31,500.00 75,600.00
Tukang Batu oh 0.8000 54,000.00 43,200.00
Kepala Tukang oh 0.0800 63,000.00 5,040.00
Mandor oh 0.1190 63,000.00 7,497.00
3.3990 432,021.60 131,337.00 563,358.60
Harga per satuan pekerjaan dibulatkan 563,358.00
C.6. 2. M3 638,068.00

C.6. 5. M3 524,889.00

C.6. 7. M3 470,813.00

C.6. 14. M3 251,579.00

C.6. 15. M3 2,093,907.00


C.6. 16. M3 563,358.00
D.6. HARGA SATUAN PEKERJAAN DINDING D.6.-1#2

1. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Bata Merah bh 140.0000 450.00 63,000.00
PC kg 43.5000 1,269.00 55,201.50
Pasir Pasang m3 0.0800 104,850.00 8,388.00
Tenaga Kerja :
Pekerja oh 0.6000 31,500.00 18,900.00
Tukang Batu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0300 63,000.00 1,890.00
0.8500 126,589.50 32,850.00 159,439.50
Harga per satuan pekerjaan dibulatkan 159,439.00

3. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Bata Merah bh 140.0000 450.00 63,000.00
PC kg 26.5500 1,269.00 33,691.95
Pasir Pasang m3 0.0930 104,850.00 9,751.05
Tenaga Kerja :
Pekerja oh 0.6000 31,500.00 18,900.00
Tukang Batu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0300 63,000.00 1,890.00
0.8500 106,443.00 32,850.00 139,293.00
Harga per satuan pekerjaan dibulatkan 139,293.00

7. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Bata Merah bh 70.0000 450.00 31,500.00
PC kg 18.9500 1,269.00 24,047.55
Pasir Pasang m3 0.0380 104,850.00 3,984.30
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0150 63,000.00 945.00
0.4250 59,531.85 16,425.00 75,956.85
Harga per satuan pekerjaan dibulatkan 75,956.00

9. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Bata Merah bh 70.0000 450.00 31,500.00
PC kg 11.5000 1,269.00 14,593.50
Pasir Pasang m3 0.0430 104,850.00 4,508.55
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0150 63,000.00 945.00
0.4250 50,602.05 16,425.00 67,027.05
Harga per satuan pekerjaan dibulatkan 67,027.00

11. Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Bata Merah bh 70.0000 450.00 31,500.00
PC kg 8.3200 1,269.00 10,558.08
Pasir Pasang m3 0.0490 104,850.00 5,137.65
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0150 63,000.00 945.00
0.4250 47,195.73 16,425.00 63,620.73
Harga per satuan pekerjaan dibulatkan 63,620.00
23. Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP D.6.-2#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Roster bh 30.0000 3,780.00 113,400.00
PC kg 11.0000 1,269.00 13,959.00
Pasir Pasang m3 0.0350 104,850.00 3,669.75
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0150 63,000.00 945.00
Mandor oh 0.0150 63,000.00 945.00
0.4300 131,028.75 16,740.00 147,768.75
Harga per satuan pekerjaan dibulatkan 147,768.00

23.a. Memasang 1 m2 dinding glass block ukuran (20 x 20) cm, campuran spesi 1 PC : 4 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Glass Block bh 25.0000 18,000.00 450,000.00
PC kg 11.0000 1,269.00 13,959.00
Pasir Pasang m3 0.0350 104,850.00 3,669.75
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0150 63,000.00 945.00
Mandor oh 0.0150 63,000.00 945.00
0.4300 467,628.75 16,740.00 484,368.75
Harga per satuan pekerjaan dibulatkan 484,368.00

24. Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Bata Berongga (ekspose) bh 70.0000 450.00 31,500.00
PC kg 14.0000 1,269.00 17,766.00
Pasir Pasang m3 0.0320 104,850.00 3,355.20
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1500 54,000.00 8,100.00
Kepala Tukang oh 0.0150 63,000.00 945.00
Mandor oh 0.0150 63,000.00 945.00
0.4800 52,621.20 19,440.00 72,061.20
Harga per satuan pekerjaan dibulatkan 72,061.00
D.6. 1. M2 159,439.00

D.6. 3. M2 139,293.00

D.6. 7. M2 75,956.00

D.6. 9. M2 67,027.00

D.6. 11. M2 63,620.00


D.6. 23. M2 147,768.00

D.6. 23.a. M2 484,368.00

D.6. 24. M2 72,061.00


E.6. HARGA SATUAN PEKERJAAN PLESTERAN E.6.-1#2

3. Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 7.7760 1,269.00 9,867.74
Pasir Pasang m3 0.0230 104,850.00 2,411.55
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1500 54,000.00 8,100.00
Kepala Tukang oh 0.0150 63,000.00 945.00
Mandor oh 0.0150 63,000.00 945.00
0.4800 12,279.29 19,440.00 31,719.29
Harga per satuan pekerjaan dibulatkan 31,719.00

4. Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 6.2400 1,269.00 7,918.56
Pasir Pasang m3 0.0240 104,850.00 2,516.40
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1500 54,000.00 8,100.00
Kepala Tukang oh 0.0150 63,000.00 945.00
Mandor oh 0.0150 63,000.00 945.00
0.4800 10,434.96 19,440.00 29,874.96
Harga per satuan pekerjaan dibulatkan 29,874.00

5. Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 5.1840 1,269.00 6,578.50
Pasir Pasang m3 0.0260 104,850.00 2,726.10
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1500 54,000.00 8,100.00
Kepala Tukang oh 0.0150 63,000.00 945.00
Mandor oh 0.0150 63,000.00 945.00
0.4800 9,304.60 19,440.00 28,744.60
Harga per satuan pekerjaan dibulatkan 28,744.00

19. Memasang 1 m2 berapen 1 PC : 5 PP, tebal 15 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 5.1840 1,269.00 6,578.50
Pasir Pasang m3 0.0260 104,850.00 2,726.10
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Batu oh 0.0750 54,000.00 4,050.00
Kepala Tukang oh 0.0080 63,000.00 504.00
Mandor oh 0.0080 63,000.00 504.00
0.2410 9,304.60 9,783.00 19,087.60
Harga per satuan pekerjaan dibulatkan 19,087.00

23. Memasang 1 m2 plesteran ciprat 1 PC : 2 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 4.3200 1,269.00 5,482.08
Pasir Pasang m3 0.0060 104,850.00 629.10
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0150 63,000.00 945.00
0.4250 6,111.18 16,425.00 22,536.18
Harga per satuan pekerjaan dibulatkan 22,536.00
24. Memasang 1 m2 finishing siar pasangan dinding bata merah (= 20 m') E.6.-2#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 3.1080 1,269.00 3,944.05
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Batu oh 0.0700 54,000.00 3,780.00
Kepala Tukang oh 0.0070 63,000.00 441.00
Mandor oh 0.0080 63,000.00 504.00
0.2350 3,944.05 9,450.00 13,394.05
Harga per satuan pekerjaan dibulatkan 13,394.00

26. Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 6.3400 1,269.00 8,045.46
Pasir Pasang m3 0.0120 104,850.00 1,258.20
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Batu oh 0.1500 54,000.00 8,100.00
Kepala Tukang oh 0.0150 63,000.00 945.00
Mandor oh 0.0150 63,000.00 945.00
0.4800 9,303.66 19,440.00 28,743.66
Harga per satuan pekerjaan dibulatkan 28,743.00

27. Memasang 1 m2 acian

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 3.2500 1,269.00 4,124.25
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0100 63,000.00 630.00
0.3200 4,124.25 12,960.00 17,084.25
Harga per satuan pekerjaan dibulatkan 17,084.00
E.6. 3. M2 31,719.00

E.6. 4. M2 29,874.00

E.6. 5. M2 28,744.00

E.6. 19. M2 19,087.00

E.6. 23. M2 22,536.00


E.6. 24. M2 13,394.00

E.6. 26. M2 28,743.00

E.6. 27. M2 17,084.00


6. HARGA SATUAN PEKERJAAN BETON

4. Membuat 1 m2 lantai kerja beton tumbuk 1PC : 3PS : 5KR tbl. 5 cm.

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 10.0000 1,269.00 12,690.00
Pasir Beton m3 0.0260 104,850.00 2,726.10
Koral (maks 30 mm) m3 0.0440 181,800.00 7,999.20
Tenaga Kerja :
Pekerja oh 1.1500 31,500.00 36,225.00
Tukang Batu oh 0.0200 54,000.00 1,080.00
Kepala Tukang oh 0.0020 63,000.00 126.00
Mandor oh 0.0060 63,000.00 378.00
1.1780 23,415.30 37,809.00
Harga per satuan pekerjaan dibulatkan

5. Membuat 1 m3 beton mutu f'c = 14.5 MPa (K 175), slump (12 + 2) cm, w/c = 0,66

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 326.0000 1,269.00 413,694.00
Pasir Beton m3 0.5429 104,850.00 56,918.57
Koral (maks 30 mm) m3 0.7622 181,800.00 138,572.00
Air ltr 215.0000 25.00 5,375.00
Tenaga Kerja :
Pekerja oh 1.6500 31,500.00 51,975.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Kepala Tukang oh 0.0280 63,000.00 1,764.00
Mandor oh 0.0830 63,000.00 5,229.00
2.0360 614,559.57 73,818.00
Harga per satuan pekerjaan dibulatkan

6. Membuat 1 m3 beton mutu f'c = 16.9 MPa (K 200), slump (12 + 2) cm, w/c = 0,61

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 352.0000 1,269.00 446,688.00
Pasir Beton m3 0.5221 104,850.00 54,746.68
Koral (maks 30 mm) m3 0.7637 181,800.00 138,841.33
Air ltr 215.0000 25.00 5,375.00
Tenaga Kerja :
Pekerja oh 1.6500 31,500.00 51,975.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Kepala Tukang oh 0.0280 63,000.00 1,764.00
Mandor oh 0.0830 63,000.00 5,229.00
2.0360 645,651.01 73,818.00
Harga per satuan pekerjaan dibulatkan

7. Membuat 1 m3 beton mutu f'c = 19.3 MPa (K 225), slump (12 + 2) cm, w/c = 0,58

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 371.0000 1,269.00 470,799.00
Pasir Beton m3 0.4986 104,850.00 52,275.21
Koral (maks 30 mm) m3 0.7756 181,800.00 140,996.00
Air ltr 215.0000 25.00 5,375.00
Tenaga Kerja :
Pekerja oh 1.6500 31,500.00 51,975.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Kepala Tukang oh 0.0280 63,000.00 1,764.00
Mandor oh 0.0830 63,000.00 5,229.00
2.0360 669,445.21 73,818.00
Harga per satuan pekerjaan dibulatkan
8. Membuat 1 m3 beton mutu f'c = 21.7 MPa (K 250), slump (12 + 2) cm, w/c = 0,56

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 384.0000 1,269.00 487,296.00
Pasir Beton m3 0.4943 104,850.00 51,825.86
Koral (maks 30 mm) m3 0.7696 181,800.00 139,918.67
Air ltr 215.0000 25.00 5,375.00
Tenaga Kerja :
Pekerja oh 1.6500 31,500.00 51,975.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Kepala Tukang oh 0.0280 63,000.00 1,764.00
Mandor oh 0.0830 63,000.00 5,229.00
2.0360 684,415.52 73,818.00
Harga per satuan pekerjaan dibulatkan

11. Membuat 1 m3 beton mutu f'c = 28.8 MPa (K 300), slump (12 + 2) cm, w/c = 0,49

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 439.0000 1,269.00 557,091.00
Pasir Beton m3 0.4786 104,850.00 50,178.21
Koral (maks 30 mm) m3 0.7452 181,800.00 135,474.67
Air ltr 215.0000 25.00 5,375.00
Tenaga Kerja :
Pekerja oh 2.1000 31,500.00 66,150.00
Tukang Batu oh 0.3500 54,000.00 18,900.00
Kepala Tukang oh 0.0350 63,000.00 2,205.00
Mandor oh 0.1050 63,000.00 6,615.00
2.5900 748,118.88 93,870.00
Harga per satuan pekerjaan dibulatkan

12. Membuat 1 m3 beton mutu f'c = 31.2 MPa (K 350), slump (12 + 2) cm, w/c = 0,48

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 448.0000 1,269.00 568,512.00
Pasir Beton m3 0.4764 104,850.00 49,953.54
Koral (maks 30 mm) m3 0.7407 181,800.00 134,666.67
Air ltr 215.0000 25.00 5,375.00
Tenaga Kerja :
Pekerja oh 2.1000 31,500.00 66,150.00
Tukang Batu oh 0.3500 54,000.00 18,900.00
Kepala Tukang oh 0.0350 63,000.00 2,205.00
Mandor oh 0.1050 63,000.00 6,615.00
2.5900 758,507.20 93,870.00
Harga per satuan pekerjaan dibulatkan

13. Membuat 1 m3 beton bertulang 1PC : 2PS : 3KR

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
PC kg 336.0000 1,269.00 426,384.00
Pasir Beton m3 0.5400 104,850.00 56,619.00
Koral (maks 30 mm) m3 0.8100 181,800.00 147,258.00
Tenaga Kerja :
Pekerja oh 2.0000 31,500.00 63,000.00
Tukang Batu oh 0.3500 54,000.00 18,900.00
Kepala Tukang oh 0.0350 63,000.00 2,205.00
Mandor oh 1.0000 63,000.00 63,000.00
3.3850 630,261.00 147,105.00
Harga per satuan pekerjaan dibulatkan

25. Pembesian per 1 kg besi polos/ulir

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Besi Beton (polos/ulir) kg 1.0500 11,520.00 12,096.00
Kawat Beton kg 0.0150 20,425.00 306.38
Tenaga Kerja :
Pekerja oh 0.0070 31,500.00 220.50
Tukang Besi oh 0.0070 54,000.00 378.00
Kepala Tukang oh 0.0007 63,000.00 44.10
Mandor oh 0.0004 63,000.00 25.20
0.0151 12,402.38 667.80
Harga per satuan pekerjaan dibulatkan

26. Memasang per 10 kg kabel presstressed polos/strands

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Besi Beton (polos/ulir) kg 10.5000 11,520.00 120,960.00
Kawat Beton kg 0.1000 20,425.00 2,042.50
Tenaga Kerja :
Pekerja oh 0.0500 31,500.00 1,575.00
Tukang Besi oh 0.0500 54,000.00 2,700.00
Kepala Tukang oh 0.0050 63,000.00 315.00
Mandor oh 0.0030 63,000.00 189.00
0.1080 123,002.50 4,779.00
Harga per satuan pekerjaan dibulatkan

27. Memasang per 10 kg jaring kawat baja/wire mesh

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Jaring Kawat Baja (dilas) kg 1.2000 29,450.00 35,340.00
Kawat Beton kg 0.0500 20,425.00 1,021.25
Tenaga Kerja :
Pekerja oh 0.0250 31,500.00 787.50
Tukang Besi oh 0.2500 54,000.00 13,500.00
Kepala Tukang oh 0.0250 63,000.00 1,575.00
Mandor oh 0.0010 63,000.00 63.00
0.3010 36,361.25 15,925.50
Harga per satuan pekerjaan dibulatkan

28. Memasang per 1 m2 bekisting untuk pondasi

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.0400 3,690,000.00 147,600.00
Paku 5 - 10 cm kg 0.3000 14,220.00 4,266.00
Minyak Bekisting ltr 0.1000 5,670.00 567.00
Tenaga Kerja :
Pekerja oh 0.5200 31,500.00 16,380.00
Tukang Kayu oh 0.2600 54,000.00 14,040.00
Kepala Tukang oh 0.0260 63,000.00 1,638.00
Mandor oh 0.0260 63,000.00 1,638.00
0.8320 152,433.00 33,696.00
Harga per satuan pekerjaan dibulatkan

29. Memasang per 1 m2 bekisting untuk sloof

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.0450 3,690,000.00 166,050.00
Paku 5 - 10 cm kg 0.3000 14,220.00 4,266.00
Minyak Bekisting ltr 0.1000 5,670.00 567.00
Tenaga Kerja :
Pekerja oh 0.5200 31,500.00 16,380.00
Tukang Kayu oh 0.2600 54,000.00 14,040.00
Kepala Tukang oh 0.0260 63,000.00 1,638.00
Mandor oh 0.0260 63,000.00 1,638.00
0.8320 170,883.00 33,696.00
Harga per satuan pekerjaan dibulatkan

30. Memasang per 1 m2 bekisting untuk kolom

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.0400 3,690,000.00 147,600.00
Paku 5 - 12 cm kg 0.4000 14,220.00 5,688.00
Minyak Bekisting ltr 0.2000 5,670.00 1,134.00
Balok Kayu Kelas II m3 0.0150 4,410,000.00 66,150.00
Plywood/Triplek tebal 9 mm lbr 0.3500 139,860.00 48,951.00
Bambu f 10-12 cm. pj. 6 m. (stegger) btg 2.0000 15,300.00 30,600.00
Tenaga Kerja :
Pekerja oh 0.6600 31,500.00 20,790.00
Tukang Kayu oh 0.3300 54,000.00 17,820.00
Kepala Tukang oh 0.0330 63,000.00 2,079.00
Mandor oh 0.0330 63,000.00 2,079.00
1.0560 300,123.00 42,768.00
Harga per satuan pekerjaan dibulatkan

31. Memasang per 1 m2 bekisting untuk balok

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.0400 3,690,000.00 147,600.00
Paku 5 - 12 cm kg 0.4000 14,220.00 5,688.00
Minyak Bekisting ltr 0.2000 5,670.00 1,134.00
Balok Kayu Kelas II m3 0.0180 4,410,000.00 79,380.00
Plywood/Triplek tebal 9 mm lbr 0.3500 139,860.00 48,951.00
Bambu f 10-12 cm. pj. 6 m. (stegger) btg 2.0000 15,300.00 30,600.00
Tenaga Kerja :
Pekerja oh 0.6600 31,500.00 20,790.00
Tukang Kayu oh 0.3300 54,000.00 17,820.00
Kepala Tukang oh 0.0330 63,000.00 2,079.00
Mandor oh 0.0330 63,000.00 2,079.00
1.0560 313,353.00 42,768.00
Harga per satuan pekerjaan dibulatkan

32. Memasang per 1 m2 bekisting untuk plat lantai

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.0400 3,690,000.00 147,600.00
Paku 5 - 12 cm kg 0.4000 14,220.00 5,688.00
Minyak Bekisting ltr 0.2000 5,670.00 1,134.00
Balok Kayu Kelas II m3 0.0150 4,410,000.00 66,150.00
Plywood/Triplek tebal 9 mm lbr 0.3500 139,860.00 48,951.00
Bambu f 10-12 cm. pj. 6 m. (stegger) btg 6.0000 15,300.00 91,800.00
Tenaga Kerja :
Pekerja oh 0.6600 31,500.00 20,790.00
Tukang Kayu oh 0.3300 54,000.00 17,820.00
Kepala Tukang oh 0.0330 63,000.00 2,079.00
Mandor oh 0.0330 63,000.00 2,079.00
1.0560 361,323.00 42,768.00
Harga per satuan pekerjaan dibulatkan

33. Memasang per 1 m2 bekisting untuk dinding

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.0300 3,690,000.00 110,700.00
Paku 5 - 12 cm kg 0.4000 14,220.00 5,688.00
Minyak Bekisting ltr 0.2000 5,670.00 1,134.00
Balok Kayu Kelas II m3 0.0200 4,410,000.00 88,200.00
Plywood/Triplek tebal 9 mm lbr 0.3500 139,860.00 48,951.00
Bambu f 10-12 cm. pj. 6 m.(stegger) btg 3.0000 15,300.00 45,900.00
Formite/penjaga jarak bekisting/spacer bh 4.0000 15,300.00 61,200.00
Tenaga Kerja :
Pekerja oh 0.6600 31,500.00 20,790.00
Tukang Kayu oh 0.3300 54,000.00 17,820.00
Kepala Tukang oh 0.0330 63,000.00 2,079.00
Mandor oh 0.0330 63,000.00 2,079.00
1.0560 361,773.00 42,768.00
Harga per satuan pekerjaan dibulatkan

34. Memasang per 1 m2 bekisting untuk tangga

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.0300 3,690,000.00 110,700.00
Paku 5 - 12 cm kg 0.4000 14,220.00 5,688.00
Minyak Bekisting ltr 0.1500 5,670.00 850.50
Balok Kayu Kelas II m3 0.0150 4,410,000.00 66,150.00
Plywood/Triplek tebal 9 mm lbr 0.3500 139,860.00 48,951.00
Bambu f 10-12 cm. pj. 6 m. (stegger) btg 2.0000 15,300.00 30,600.00
Tenaga Kerja :
Pekerja oh 0.6600 31,500.00 20,790.00
Tukang Kayu oh 0.3300 54,000.00 17,820.00
Kepala Tukang oh 0.0330 63,000.00 2,079.00
Mandor oh 0.0330 63,000.00 2,079.00
1.0560 262,939.50 42,768.00
Harga per satuan pekerjaan dibulatkan

38. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.2000 3,690,000.00 738,000.00
Paku 5 - 12 cm kg 1.5000 14,220.00 21,330.00
Minyak Bekisting ltr 0.4000 5,670.00 2,268.00
Besi Beton polos kg 157.5000 11,520.00 1,814,400.00
Kawat Beton kg 2.2500 20,425.00 45,956.25
PC kg 336.0000 1,269.00 426,384.00
Pasir Beton m3 0.5400 104,850.00 56,619.00
Koral m3 0.8100 181,800.00 147,258.00
Tenaga Kerja :
Pekerja oh 5.3000 31,500.00 166,950.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Tukang Kayu oh 1.3000 54,000.00 70,200.00
Tukang Besi oh 1.0500 54,000.00 56,700.00
Kepala Tukang oh 0.2620 63,000.00 16,506.00
Mandor oh 0.2650 63,000.00 16,695.00
8.4520 3,252,215.25 341,901.00
Harga per satuan pekerjaan dibulatkan

39. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.2700 3,690,000.00 996,300.00
Paku 5 - 12 cm kg 2.0000 14,220.00 28,440.00
Minyak Bekisting ltr 0.6000 5,670.00 3,402.00
Besi Beton polos kg 210.0000 11,520.00 2,419,200.00
Kawat Beton kg 3.0000 20,425.00 61,275.00
PC kg 336.0000 1,269.00 426,384.00
Pasir Beton m3 0.5400 104,850.00 56,619.00
Koral m3 0.8100 181,800.00 147,258.00
Tenaga Kerja :
Pekerja oh 5.6500 31,500.00 177,975.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Tukang Kayu oh 1.5600 54,000.00 84,240.00
Tukang Besi oh 1.4000 54,000.00 75,600.00
Kepala Tukang oh 0.3230 63,000.00 20,349.00
Mandor oh 0.2830 63,000.00 17,829.00
9.4910 4,138,878.00 390,843.00
Harga per satuan pekerjaan dibulatkan

40. Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.4000 3,690,000.00 1,476,000.00
Paku 5 - 12 cm kg 4.0000 14,220.00 56,880.00
Minyak Bekisting ltr 2.0000 5,670.00 11,340.00
Besi Beton polos kg 315.0000 11,520.00 3,628,800.00
Kawat Beton kg 4.5000 20,425.00 91,912.50
PC kg 336.0000 1,269.00 426,384.00
Pasir Beton m3 0.5400 104,850.00 56,619.00
Koral m3 0.8100 181,800.00 147,258.00
Kayu Kelas II (balok) m3 0.1500 4,410,000.00 661,500.00
Plywood/Triplek tebal 9 mm lbr 3.5000 139,860.00 489,510.00
Dolken Kayu Galam F (8 - 10) cm p = 4 m btg 20.0000 29,700.00 594,000.00
Tenaga Kerja :
Pekerja oh 7.0500 31,500.00 222,075.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Tukang Kayu oh 1.6500 54,000.00 89,100.00
Tukang Besi oh 2.1000 54,000.00 113,400.00
Kepala Tukang oh 0.4030 63,000.00 25,389.00
Mandor oh 0.3530 63,000.00 22,239.00
11.8310 7,640,203.50 487,053.00
Harga per satuan pekerjaan dibulatkan

41. Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.3200 3,690,000.00 1,180,800.00
Paku 5 - 12 cm kg 3.2000 14,220.00 45,504.00
Minyak Bekisting ltr 1.6000 5,670.00 9,072.00
Besi Beton polos kg 210.0000 11,520.00 2,419,200.00
Kawat Beton kg 3.0000 20,425.00 61,275.00
PC kg 336.0000 1,269.00 426,384.00
Pasir Beton m3 0.5400 104,850.00 56,619.00
Koral m3 0.8100 181,800.00 147,258.00
Kayu Kelas II (balok) m3 0.1400 4,410,000.00 617,400.00
Plywood/Triplek tebal 9 mm lbr 2.8000 139,860.00 391,608.00
Dolken Kayu Galam F (8 - 10) cm p = 4 m btg 16.0000 29,700.00 475,200.00
Tenaga Kerja :
Pekerja oh 6.3500 31,500.00 200,025.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Tukang Kayu oh 1.6500 54,000.00 89,100.00
Tukang Besi oh 1.4000 54,000.00 75,600.00
Kepala Tukang oh 0.3330 63,000.00 20,979.00
Mandor oh 0.3180 63,000.00 20,034.00
10.3260 5,830,320.00 420,588.00
Harga per satuan pekerjaan dibulatkan

43. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.2400 3,690,000.00 885,600.00
Paku 5 - 12 cm kg 3.2000 14,220.00 45,504.00
Minyak Bekisting ltr 1.6000 5,670.00 9,072.00
Besi Beton polos kg 157.5000 11,520.00 1,814,400.00
Kawat Beton kg 2.2500 20,425.00 45,956.25
PC kg 336.0000 1,269.00 426,384.00
Pasir Beton m3 0.5400 104,850.00 56,619.00
Koral m3 0.8100 181,800.00 147,258.00
Kayu Kelas II (balok) m3 0.1600 4,410,000.00 705,600.00
Plywood/Triplek tebal 9 mm lbr 2.8000 139,860.00 391,608.00
Dolken Kayu Galam F (8 - 10) cm p = 4 m btg 24.0000 29,700.00 712,800.00
Tenaga Kerja :
Pekerja oh 5.3000 31,500.00 166,950.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Tukang Kayu oh 1.3000 54,000.00 70,200.00
Tukang Besi oh 1.0500 54,000.00 56,700.00
Kepala Tukang oh 0.2620 63,000.00 16,506.00
Mandor oh 0.2650 63,000.00 16,695.00
8.4520 5,240,801.25 341,901.00
Harga per satuan pekerjaan dibulatkan

45. Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.0020 3,690,000.00 7,380.00
Paku 5 - 12 cm kg 0.0100 14,220.00 142.20
Besi Beton polos kg 3.0000 11,520.00 34,560.00
Kawat Beton kg 0.0450 20,425.00 919.13
PC kg 4.0000 1,269.00 5,076.00
Pasir Beton m3 0.0060 104,850.00 629.10
Koral m3 0.0090 181,800.00 1,636.20
Tenaga Kerja :
Pekerja oh 0.1800 31,500.00 5,670.00
Tukang Batu oh 0.0200 54,000.00 1,080.00
Tukang Kayu oh 0.0200 54,000.00 1,080.00
Tukang Besi oh 0.0200 54,000.00 1,080.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0090 63,000.00 567.00
0.2550 50,342.63 9,855.00
Harga per satuan pekerjaan dibulatkan

46. Membuat 1 m' ring balok beton bertulang (10 x 15) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.0030 3,690,000.00 11,070.00
Paku 5 - 12 cm kg 0.0200 14,220.00 284.40
Besi Beton polos kg 3.6000 11,520.00 41,472.00
Kawat Beton kg 0.0500 20,425.00 1,021.25
PC kg 5.5000 1,269.00 6,979.50
Pasir Beton m3 0.0090 104,850.00 943.65
Koral m3 0.0150 181,800.00 2,727.00
Tenaga Kerja :
Pekerja oh 0.2970 31,500.00 9,355.50
Tukang Batu oh 0.0330 54,000.00 1,782.00
Tukang Kayu oh 0.0330 54,000.00 1,782.00
Tukang Besi oh 0.0330 54,000.00 1,782.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0150 63,000.00 945.00
0.4210 64,497.80 16,276.50
Harga per satuan pekerjaan dibulatkan

47. Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)

Uraian Satuan Indeks Harga Satuan Harga Satuan Jumlah Harga Satuan
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Bahan :
Kayu Kelas III m3 0.3200 3,690,000.00 1,180,800.00
Paku 5 - 12 cm kg 3.2000 14,220.00 45,504.00
Minyak Bekisting ltr 1.6000 5,670.00 9,072.00
Besi Beton polos kg 157.5000 11,520.00 1,814,400.00
Kawat Beton kg 2.2500 20,425.00 45,956.25
PC kg 336.0000 1,269.00 426,384.00
Pasir Beton m3 0.5400 104,850.00 56,619.00
Koral m3 0.8100 181,800.00 147,258.00
Kayu Kelas II (balok) m3 0.1200 4,410,000.00 529,200.00
Plywood/Triplek tebal 9 mm lbr 2.8000 139,860.00 391,608.00
Dolken Kayu Galam F (8 - 10) cm p = 4 m btg 32.0000 29,700.00 950,400.00
Tenaga Kerja :
Pekerja oh 5.3000 31,500.00 166,950.00
Tukang Batu oh 0.2750 54,000.00 14,850.00
Tukang Kayu oh 1.3000 54,000.00 70,200.00
Tukang Besi oh 1.0500 54,000.00 56,700.00
Kepala Tukang oh 0.2650 63,000.00 16,695.00
Mandor oh 0.2650 63,000.00 16,695.00
8.4550 5,597,201.25 342,090.00
Harga per satuan pekerjaan dibulatkan
6.-1#7 6 4. M2 61,224.00

Total (Rp)

61,224.30
61,224.00

6 5. M3 688,377.00

Total (Rp)

688,377.57
688,377.00

6 6. M3 719,469.00

Total (Rp)

719,469.01
719,469.00

6 7. M2 743,263.00

Total (Rp)

743,263.21
743,263.00
6.-2#7 6 8. M3 758,233.00

Total (Rp)

758,233.52
758,233.00

6 11. M3 841,988.00

Total (Rp)

841,988.88
841,988.00

6 12. M3 852,377.00

Total (Rp)

852,377.20
852,377.00

6 13. M3 777,366.00

Total (Rp)

777,366.00
777,366.00

6 25. M3 13,070.00

Total (Rp)
13,070.18
13,070.00

6.-3#7 6 26. M3 127,781.00

Total (Rp)

127,781.50
127,781.00

6 27. Kg 52,286.00

Total (Rp)

52,286.75
52,286.00

6 28. M2 186,129.00

Total (Rp)

186,129.00
186,129.00

6 29. M2 204,579.00

Total (Rp)

204,579.00
204,579.00

6 30. M2 342,891.00

Total (Rp)
342,891.00
342,891.00

6.-4#7 6 31. M2 356,121.00

Total (Rp)

356,121.00
356,121.00

6 32. M2 404,091.00

Total (Rp)

404,091.00
404,091.00

6 33. M2 404,541.00

Total (Rp)

404,541.00
404,541.00

6 34. M2 305,707.00

Total (Rp)
305,707.50
305,707.00

6.-5#7 6 38. M3 3,594,116.00

Total (Rp)

3,594,116.25
3,594,116.00

6 39. M3 4,529,721.00

Total (Rp)

4,529,721.00
4,529,721.00

6 40. M3 8,127,256.00

Total (Rp)
8,127,256.50
8,127,256.00

6.-6#7 6 41. M3 6,250,908.00

Total (Rp)

6,250,908.00
6,250,908.00

6 43. M3 5,582,702.00

Total (Rp)

5,582,702.25
5,582,702.00

6 45. M3 60,197.00

Total (Rp)
60,197.63
60,197.00

6.-7#7 6 46. M3 80,774.00

umlah Harga Satuan


Total (Rp)

80,774.30
80,774.00

6 47. M3 5,939,291.00

umlah Harga Satuan


Total (Rp)

5,939,291.25
5,939,291.00
F.6. HARGA SATUAN PEKERJAAN KAYU F.6.-1#7

1. Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I (Jati)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu m3 1.1000 25,200,000.00 27,720,000.00
Paku 10 cm kg 1.2500 14,220.00 17,775.00
Lem Kayu kg 1.0000 13,500.00 13,500.00
Tenaga Kerja :
Pekerja oh 7.0000 31,500.00 220,500.00
Tukang Kayu oh 21.0000 54,000.00 1,134,000.00
Kepala Tukang oh 2.1000 63,000.00 132,300.00
Mandor oh 0.3500 63,000.00 22,050.00
30.4500 27,751,275.00 1,508,850.00 29,260,125.00
Harga per satuan pekerjaan dibulatkan 29,260,125.00

2. Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu m3 1.2000 8,910,000.00 10,692,000.00
Paku 10 cm kg 1.2500 14,220.00 17,775.00
Lem Kayu kg 1.0000 13,500.00 13,500.00
Tenaga Kerja :
Pekerja oh 6.0000 31,500.00 189,000.00
Tukang Kayu oh 18.0000 54,000.00 972,000.00
Kepala Tukang oh 1.8000 63,000.00 113,400.00
Mandor oh 0.3000 63,000.00 18,900.00
26.1000 10,723,275.00 1,293,300.00 12,016,575.00
Harga per satuan pekerjaan dibulatkan 12,016,575.00

5. Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I (Jati)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0400 25,200,000.00 1,008,000.00
Lem Kayu kg 0.5000 13,500.00 6,750.00
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Kayu oh 3.0000 54,000.00 162,000.00
Kepala Tukang oh 0.3000 63,000.00 18,900.00
Mandor oh 0.0500 63,000.00 3,150.00
4.3500 1,014,750.00 215,550.00 1,230,300.00
Harga per satuan pekerjaan dibulatkan 1,230,300.00

5.a. Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0400 8,910,000.00 356,400.00
Lem Kayu kg 0.5000 13,500.00 6,750.00
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Kayu oh 3.0000 54,000.00 162,000.00
Kepala Tukang oh 0.3000 63,000.00 18,900.00
Mandor oh 0.0500 63,000.00 3,150.00
4.3500 363,150.00 215,550.00 578,700.00
Harga per satuan pekerjaan dibulatkan 578,700.00

5.c. Membuat dan memasang 1 m2 daun pintu panel, kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0400 6,300,000.00 252,000.00
Lem Kayu kg 0.5000 13,500.00 6,750.00
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Kayu oh 3.0000 54,000.00 162,000.00
Kepala Tukang oh 0.3000 63,000.00 18,900.00
Mandor oh 0.0500 63,000.00 3,150.00
4.3500 258,750.00 215,550.00 474,300.00
Harga per satuan pekerjaan dibulatkan 474,300.00
6. Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I (Jati) F.6.-2#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0120 25,200,000.00 302,400.00
Kaca Polos 5 mm m2 1.0000 86,940.00 86,940.00
Lem Kayu kg 0.3000 13,500.00 4,050.00
Tenaga Kerja :
Pekerja oh 0.8000 31,500.00 25,200.00
Tukang Kayu oh 2.4000 54,000.00 129,600.00
Kepala Tukang oh 0.2400 63,000.00 15,120.00
Mandor oh 0.0400 63,000.00 2,520.00
3.4800 393,390.00 172,440.00 565,830.00
Harga per satuan pekerjaan dibulatkan 565,830.00

6.a. Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0120 8,910,000.00 106,920.00
Kaca Polos 5 mm m2 1.0000 86,940.00 86,940.00
Lem Kayu kg 0.3000 13,500.00 4,050.00
Tenaga Kerja :
Pekerja oh 0.8000 31,500.00 25,200.00
Tukang Kayu oh 2.4000 54,000.00 129,600.00
Kepala Tukang oh 0.2400 63,000.00 15,120.00
Mandor oh 0.0400 63,000.00 2,520.00
3.4800 197,910.00 172,440.00 370,350.00
Harga per satuan pekerjaan dibulatkan 370,350.00

7. Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I (Jati)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0640 25,200,000.00 1,612,800.00
Lem Kayu kg 0.5000 13,500.00 6,750.00
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Kayu oh 3.0000 54,000.00 162,000.00
Kepala Tukang oh 0.3000 63,000.00 18,900.00
Mandor oh 0.0500 63,000.00 3,150.00
4.3500 1,619,550.00 215,550.00 1,835,100.00
Harga per satuan pekerjaan dibulatkan 1,835,100.00

7.a. Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0640 8,910,000.00 570,240.00
Lem Kayu kg 0.5000 13,500.00 6,750.00
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Kayu oh 3.0000 54,000.00 162,000.00
Kepala Tukang oh 0.3000 63,000.00 18,900.00
Mandor oh 0.0500 63,000.00 3,150.00
4.3500 576,990.00 215,550.00 792,540.00
Harga per satuan pekerjaan dibulatkan 792,540.00

8. Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (Kamper lebar sampai 90 cm)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0250 8,910,000.00 222,750.00
Paku 1 - 2,5 cm kg 0.0300 14,220.00 426.60
Lem Kayu kg 0.5000 13,500.00 6,750.00
Plywood tebal 4 mm ukr (90 x 220) cm lbr 1.0000 73,350.00 73,350.00
Tenaga Kerja :
Pekerja oh 0.7000 31,500.00 22,050.00
Tukang Kayu oh 2.1000 54,000.00 113,400.00
Kepala Tukang oh 0.2100 63,000.00 13,230.00
Mandor oh 0.0350 63,000.00 2,205.00
3.0450 303,276.60 150,885.00 454,161.60
Harga per satuan pekerjaan dibulatkan 454,161.00

8.a. Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas III (Kruing lebar sampai 90 cm) F.6.-3#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0250 6,300,000.00 157,500.00
Paku 1 - 2,5 cm kg 0.0300 14,220.00 426.60
Lem Kayu kg 0.5000 13,500.00 6,750.00
Plywood tebal 4 mm ukr (90 x 220) cm lbr 1.0000 73,350.00 73,350.00
Tenaga Kerja :
Pekerja oh 0.7000 31,500.00 22,050.00
Tukang Kayu oh 2.1000 54,000.00 113,400.00
Kepala Tukang oh 0.2100 63,000.00 13,230.00
Mandor oh 0.0350 63,000.00 2,205.00
3.0450 238,026.60 150,885.00 388,911.60
Harga per satuan pekerjaan dibulatkan 388,911.00

10. Memasang 1 m2 jalusi kusen, kayu kelas I (Jati)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0600 25,200,000.00 1,512,000.00
Paku 1 - 2,5 cm kg 0.1500 14,220.00 2,133.00
Tenaga Kerja :
Pekerja oh 0.6700 31,500.00 21,105.00
Tukang Kayu oh 2.0000 54,000.00 108,000.00
Kepala Tukang oh 0.2000 63,000.00 12,600.00
Mandor oh 0.3350 63,000.00 21,105.00
3.2050 1,514,133.00 162,810.00 1,676,943.00
Harga per satuan pekerjaan dibulatkan 1,676,943.00

10.a. Memasang 1 m2 jalusi kusen, kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan Kayu m3 0.0600 8,910,000.00 534,600.00
Paku 1 - 2,5 cm kg 0.1500 14,220.00 2,133.00
Tenaga Kerja :
Pekerja oh 0.6700 31,500.00 21,105.00
Tukang Kayu oh 2.0000 54,000.00 108,000.00
Kepala Tukang oh 0.2000 63,000.00 12,600.00
Mandor oh 0.3350 63,000.00 21,105.00
3.2050 536,733.00 162,810.00 699,543.00
Harga per satuan pekerjaan dibulatkan 699,543.00

13.a. Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu m3 1.1000 8,910,000.00 9,801,000.00
Besi Strip tebal 5 mm kg 15.0000 13,157.50 197,362.50
Paku 12 cm kg 5.6000 14,220.00 79,632.00
Tenaga Kerja :
Pekerja oh 4.0000 31,500.00 126,000.00
Tukang Kayu oh 12.0000 54,000.00 648,000.00
Kepala Tukang oh 1.2000 63,000.00 75,600.00
Mandor oh 0.2000 63,000.00 12,600.00
17.4000 10,077,994.50 862,200.00 10,940,194.50
Harga per satuan pekerjaan dibulatkan 10,940,194.00

13.b. Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu m3 1.1000 6,300,000.00 6,930,000.00
Besi Strip tebal 5 mm kg 15.0000 13,157.50 197,362.50
Paku 12 cm kg 5.6000 14,220.00 79,632.00
Tenaga Kerja :
Pekerja oh 4.0000 31,500.00 126,000.00
Tukang Kayu oh 12.0000 54,000.00 648,000.00
Kepala Tukang oh 1.2000 63,000.00 75,600.00
Mandor oh 0.2000 63,000.00 12,600.00
17.4000 7,206,994.50 862,200.00 8,069,194.50
Harga per satuan pekerjaan dibulatkan 8,069,194.00

15.a. Memasang 1 m3 konstruksi gordeng, kayu kelas II (Kamper) F.6.-4#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu m3 1.1000 8,910,000.00 9,801,000.00
Besi Strip tebal 5 mm kg 15.0000 13,157.50 197,362.50
Paku 12 cm kg 3.0000 14,220.00 42,660.00
Tenaga Kerja :
Pekerja oh 2.4000 31,500.00 75,600.00
Tukang Kayu oh 7.2000 54,000.00 388,800.00
Kepala Tukang oh 0.7200 63,000.00 45,360.00
Mandor oh 0.1200 63,000.00 7,560.00
10.4400 10,041,022.50 517,320.00 10,558,342.50
Harga per satuan pekerjaan dibulatkan 10,558,342.00

15.b. Memasang 1 m3 konstruksi gordeng, kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu m3 1.1000 6,300,000.00 6,930,000.00
Besi Strip tebal 5 mm kg 15.0000 13,157.50 197,362.50
Paku 12 cm kg 3.0000 14,220.00 42,660.00
Tenaga Kerja :
Pekerja oh 2.4000 31,500.00 75,600.00
Tukang Kayu oh 7.2000 54,000.00 388,800.00
Kepala Tukang oh 0.7200 63,000.00 45,360.00
Mandor oh 0.1200 63,000.00 7,560.00
10.4400 7,170,022.50 517,320.00 7,687,342.50
Harga per satuan pekerjaan dibulatkan 7,687,342.00

17. Memasang 1 m2 rangka atap genteng beton, kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaso-kaso (5 x 7) cm m3 0.0140 8,910,000.00 124,740.00
Reng (3 x 4) cm m3 0.0072 8,910,000.00 64,152.00
Paku 5 dan 10 cm kg 0.2500 14,220.00 3,555.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0050 63,000.00 315.00
0.2150 192,447.00 9,495.00 201,942.00
Harga per satuan pekerjaan dibulatkan 201,942.00

17.a. Memasang 1 m2 rangka atap genteng kodok, kayu kelas II (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaso-kaso (5 x 7) cm m3 0.0140 6,300,000.00 88,200.00
Reng (3 x 4) cm m3 0.0036 6,300,000.00 22,680.00
Paku 5 dan 10 cm kg 0.2500 14,220.00 3,555.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0050 63,000.00 315.00
0.2150 114,435.00 9,495.00 123,930.00
Harga per satuan pekerjaan dibulatkan 123,930.00
17.b. Memasang 1 m2 rangka atap genteng kodok, kayu meranti

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaso-kaso (5 x 7) cm m3 0.0140 4,410,000.00 61,740.00
Reng (3 x 4) cm m3 0.0036 4,410,000.00 15,876.00
Paku 5 dan 10 cm kg 0.2500 14,220.00 3,555.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0050 63,000.00 315.00
0.2150 81,171.00 9,495.00 90,666.00
Harga per satuan pekerjaan dibulatkan 90,666.00

18.a. Memasang 1 m2 rangka atap sirap, kayu kelas III (Kruing) F.6.-5#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kayu kelas III m3 0.1650 6,300,000.00 1,039,500.00
Paku 5 sampai 10 cm kg 0.2000 14,220.00 2,844.00
Tenaga Kerja :
Pekerja oh 0.1200 31,500.00 3,780.00
Tukang Kayu oh 0.1200 54,000.00 6,480.00
Kepala Tukang oh 0.0120 63,000.00 756.00
Mandor oh 0.0060 63,000.00 378.00
0.2580 1,042,344.00 11,394.00 1,053,738.00
Harga per satuan pekerjaan dibulatkan 1,053,738.00

19. Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaso-kaso (5 x 7) cm m3 0.0154 8,910,000.00 137,214.00
Paku 7 sampai 10 cm kg 0.2000 14,220.00 2,844.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Kayu oh 0.3000 54,000.00 16,200.00
Kepala Tukang oh 0.0300 63,000.00 1,890.00
Mandor oh 0.0750 63,000.00 4,725.00
0.5550 140,058.00 27,540.00 167,598.00
Harga per satuan pekerjaan dibulatkan 167,598.00

19.a. Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaso-kaso (5 x 7) cm m3 0.0154 6,300,000.00 97,020.00
Paku 7 sampai 10 cm kg 0.2000 14,220.00 2,844.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Kayu oh 0.3000 54,000.00 16,200.00
Kepala Tukang oh 0.0300 63,000.00 1,890.00
Mandor oh 0.0750 63,000.00 4,725.00
0.5550 99,864.00 27,540.00 127,404.00
Harga per satuan pekerjaan dibulatkan 127,404.00

19.b. Memasang 1 m2 rangka langit-langit (100 x 100) cm, kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaso-kaso (4 x 6) cm m3 0.0108 6,300,000.00 68,040.00
Paku 7 sampai 10 cm kg 0.2000 14,220.00 2,844.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Kayu oh 0.3000 54,000.00 16,200.00
Kepala Tukang oh 0.0300 63,000.00 1,890.00
Mandor oh 0.0750 63,000.00 4,725.00
0.5550 70,884.00 27,540.00 98,424.00
Harga per satuan pekerjaan dibulatkan 98,424.00

20. Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaso-kaso (5 x 7) cm m3 0.0163 8,910,000.00 145,233.00
Paku 7 sampai 10 cm kg 0.2500 14,220.00 3,555.00
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Kayu oh 0.3000 54,000.00 16,200.00
Kepala Tukang oh 0.0300 63,000.00 1,890.00
Mandor oh 0.0100 63,000.00 630.00
0.5400 148,788.00 25,020.00 173,808.00
Harga per satuan pekerjaan dibulatkan 173,808.00

20.a. Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III (Kruing) F.6.-6#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaso-kaso (5 x 7) cm m3 0.0163 6,300,000.00 102,690.00
Paku 7 sampai 10 cm kg 0.2500 14,220.00 3,555.00
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Kayu oh 0.3000 54,000.00 16,200.00
Kepala Tukang oh 0.0300 63,000.00 1,890.00
Mandor oh 0.0100 63,000.00 630.00
0.5400 106,245.00 25,020.00 131,265.00
Harga per satuan pekerjaan dibulatkan 131,265.00

21.a. Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan kayu m3 0.0108 8,910,000.00 96,228.00
Paku 5 dan 7 cm kg 0.1000 14,220.00 1,422.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0050 63,000.00 315.00
0.3250 97,650.00 15,525.00 113,175.00
Harga per satuan pekerjaan dibulatkan 113,175.00

21.b. Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan kayu m3 0.0108 6,300,000.00 68,040.00
Paku 5 dan 7 cm kg 0.1000 14,220.00 1,422.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0050 63,000.00 315.00
0.3250 69,462.00 15,525.00 84,987.00
Harga per satuan pekerjaan dibulatkan 84,987.00

22.a. Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan kayu m3 0.0110 8,910,000.00 98,010.00
Paku 5 dan 7 cm kg 0.0500 14,220.00 711.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0050 63,000.00 315.00
0.3250 98,721.00 15,525.00 114,246.00
Harga per satuan pekerjaan dibulatkan 114,246.00

22.b. Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan kayu m3 0.0110 6,300,000.00 69,300.00
Paku 5 dan 7 cm kg 0.0500 14,220.00 711.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0050 63,000.00 315.00
0.3250 70,011.00 15,525.00 85,536.00
Harga per satuan pekerjaan dibulatkan 85,536.00

22.c. Memasang 1 m' listplank woodplank ukuran lebar 30 tebal 1 cm F.6.-7#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan kayu m' 1.1000 23,805.00 26,185.50
Paku 5 dan 7 cm kg 0.0500 14,220.00 711.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0050 63,000.00 315.00
0.3250 26,896.50 15,525.00 42,421.50
Harga per satuan pekerjaan dibulatkan 42,421.00

22.d. Memasang 1 m' listplank woodplank ukuran lebar 20 tebal 1 cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan kayu m' 1.1000 13,500.00 14,850.00
Paku 5 dan 7 cm kg 0.0500 14,220.00 711.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0050 63,000.00 315.00
0.3250 15,561.00 15,525.00 31,086.00
Harga per satuan pekerjaan dibulatkan 31,086.00

22.e. Memasang 1 m' Kompres

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Papan kayu m3 0.0020 6,300,000.00 12,600.00
Seng Talang BJLS 30 x 60 cm m1 0.1500 42,615.00 6,392.25
Paku 5 dan 7 cm kg 0.1000 14,220.00 1,422.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0050 63,000.00 315.00
0.3250 20,414.25 15,525.00 35,939.25
Harga per satuan pekerjaan dibulatkan 35,939.00

23. Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu m3 0.0280 8,910,000.00 249,480.00
Paku 5 dan 7 cm kg 0.1500 14,220.00 2,133.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Kayu oh 0.4500 54,000.00 24,300.00
Kepala Tukang oh 0.0450 63,000.00 2,835.00
Mandor oh 0.0080 63,000.00 504.00
0.6530 251,613.00 32,364.00 283,977.00
Harga per satuan pekerjaan dibulatkan 283,977.00
23.a. Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu m3 0.0280 6,300,000.00 176,400.00
Paku 5 dan 7 cm kg 0.1500 14,220.00 2,133.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Kayu oh 0.4500 54,000.00 24,300.00
Kepala Tukang oh 0.0450 63,000.00 2,835.00
Mandor oh 0.0080 63,000.00 504.00
0.6530 178,533.00 32,364.00 210,897.00
Harga per satuan pekerjaan dibulatkan 210,897.00

24. Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II (Kamper)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu ukuran (6 x 12) cm m3 0.0280 8,910,000.00 249,480.00
Paku 5 dan 10 cm kg 0.1500 14,220.00 2,133.00
Teakwood tbl 4 mm ukr (120 x 240) cm lbr 0.8600 121,725.00 104,683.50
Lem Kayu kg 0.5600 13,500.00 7,560.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Kayu oh 0.4500 54,000.00 24,300.00
Kepala Tukang oh 0.0450 63,000.00 2,835.00
Mandor oh 0.0080 63,000.00 504.00
0.6530 363,856.50 32,364.00 396,220.50
Harga per satuan pekerjaan dibulatkan 396,220.00

24.a. Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas III (Kruing) F.6.-8#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Balok Kayu ukuran (6 x 12) cm m3 0.0280 6,300,000.00 176,400.00
Paku 5 dan 10 cm kg 0.1500 14,220.00 2,133.00
Teakwood tbl 4 mm ukr (120 x 240) cm lbr 0.8600 121,725.00 104,683.50
Lem Kayu kg 0.5600 13,500.00 7,560.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Kayu oh 0.4500 54,000.00 24,300.00
Kepala Tukang oh 0.0450 63,000.00 2,835.00
Mandor oh 0.0080 63,000.00 504.00
0.6530 290,776.50 32,364.00 323,140.50
Harga per satuan pekerjaan dibulatkan 323,140.00

27. Memasang 1 m2 dinding lambriziring dari plywood ukuran (120 x 240) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Plywood tebal 4 mm lbr 0.4000 73,350.00 29,340.00
Paku 1 dan 2,5 cm kg 0.0500 14,220.00 711.00
Tenaga Kerja :
Pekerja oh 0.0250 31,500.00 787.50
Tukang Kayu oh 0.0750 54,000.00 4,050.00
Kepala Tukang oh 0.0080 63,000.00 504.00
Mandor oh 0.0010 63,000.00 63.00
0.1090 30,051.00 5,404.50 35,455.50
Harga per satuan pekerjaan dibulatkan 35,455.00
F.6 1. M3 29,260,125.00

F.6 2. M3 12,016,575.00

F.6 5. M2 1,230,300.00

F.6 5.a. M2 578,700.00

F.6 5.c. M2 474,300.00


F.6 6. M2 565,830.00

F.6 6.a. M2 370,350.00

F.6 7. M2 1,835,100.00

F.6 7.a. M2 792,540.00

F.6 8. M2 454,161.00
F.6 8.a. M2 388,911.00

F.6 10. M2 1,676,943.00

F.6 10.a. M2 699,543.00

F.6 13.a. M3 10,940,194.00

F.6 13.b. M3 8,069,194.00


F.6 15.a. M3 10,558,342.00

F.6 15.b. M3 7,687,342.00

F.6 17. M2 201,942.00

F.6 17.a. M2 123,930.00

F.6 17.b. M2 90,666.00


F.6 18.a. M2 1,053,738.00

F.6 19. M2 167,598.00

F.6 19.a. M2 127,404.00

F.6 19.b. M2 98,424.00

F.6 20. M2 173,808.00


F.6 20.a. M2 131,265.00

F.6 21.a. M1 113,175.00

F.6 21.b. M1 84,987.00

F.6 22.a. M1 114,246.00

F.6 22.b. M1 85,536.00


F.6 22.c. M1 42,421.00

F.6 22.d. M1 31,086.00

F.6 22.e. M1 35,939.00

F.6 23. M2 283,977.00


F.6 23.a. M2 210,897.00

F.6 24. M2 396,220.00

F.6 24.a. M2 323,140.00

F.6 27. M2 35,455.00


G.6. HARGA SATUAN PEKERJAAN PENUTUP ATAP G.6.-1#3

2. Memasang 1 m2 genteng kodok/glazzur

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Genteng Kodok bh 25.0000 2,025.00 50,625.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang kayu oh 0.0750 54,000.00 4,050.00
Kepala Tukang oh 0.0080 63,000.00 504.00
Mandor oh 0.0080 63,000.00 504.00
0.2410 50,625.00 9,783.00 60,408.00
Harga per satuan pekerjaan dibulatkan 60,408.00

3. Memasang 1 m2 genteng press super

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Genteng press super bh 25.0000 2,475.00 61,875.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Kayu oh 0.0750 54,000.00 4,050.00
Kepala Tukang oh 0.0080 63,000.00 504.00
Mandor oh 0.0080 63,000.00 504.00
0.2410 61,875.00 9,783.00 71,658.00
Harga per satuan pekerjaan dibulatkan 71,658.00

5. Memasang 1 m' genteng bubung kodok/glazzur

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Genteng Bubung Kodok bh 5.0000 4,500.00 22,500.00
Semen Portland kg 10.8000 1,269.00 13,705.20
Pasir Pasang m3 0.0320 104,850.00 3,355.20
Tenaga Kerja :
Pekerja oh 0.4000 31,500.00 12,600.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0020 63,000.00 126.00
0.6220 39,560.40 24,786.00 64,346.40
Harga per satuan pekerjaan dibulatkan 64,346.00

6. Memasang 1 m' genteng bubung press

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Genteng Bubung Press bh 5.0000 4,230.00 21,150.00
Semen Portland kg 8.0000 1,269.00 10,152.00
Pasir Pasang m3 0.0320 104,850.00 3,355.20
Tenaga Kerja :
Pekerja oh 0.4000 31,500.00 12,600.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0020 63,000.00 126.00
0.6220 34,657.20 24,786.00 59,443.20
Harga per satuan pekerjaan dibulatkan 59,443.00

7. Memasang roof light fiberglass (180 x 90 ) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Roof Light Fiberglass lbr 0.7600 101,700.00 77,292.00
Paku Biasa kg 0.0500 14,220.00 711.00
Tenaga Kerja :
Pekerja oh 0.1400 31,500.00 4,410.00
Tukang Kayu oh 0.0670 54,000.00 3,618.00
Kepala Tukang oh 0.0070 63,000.00 441.00
Mandor oh 0.0070 63,000.00 441.00
0.2210 78,003.00 8,910.00 86,913.00
Harga per satuan pekerjaan dibulatkan 86,913.00
12. Memasang 1 m2 atap asbes gelombang (3,0 x 1,05) m x 4 mm G.6.-2#3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Asbes Gelombang lbr 0.3500 80,325.00 28,113.75
Paku Pancing kg 0.1200 20,700.00 2,484.00
Tenaga Kerja :
Pekerja oh 0.1400 31,500.00 4,410.00
Tukang Kayu oh 0.0670 54,000.00 3,618.00
Kepala Tukang oh 0.0070 63,000.00 441.00
Mandor oh 0.0070 63,000.00 441.00
0.2210 30,597.75 8,910.00 39,507.75
Harga per satuan pekerjaan dibulatkan 39,507.00

12.a. Memasang 1 m2 atap asbes gelombang (3,0 x 1,05) m x 4 mm rangka kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kayu (5 x 7) cm m3 0.0085 6,300,000.00 53,550.00
Paku 5 dan 10 cm kg 0.0700 14,220.00 995.40
Asbes Gelombang lbr 0.3500 80,325.00 28,113.75
Paku Pancing kg 0.1200 20,700.00 2,484.00
Tenaga Kerja :
Pekerja oh 0.1800 31,500.00 5,670.00
Tukang Kayu oh 0.1070 54,000.00 5,778.00
Kepala Tukang oh 0.0110 63,000.00 693.00
Mandor oh 0.0090 63,000.00 567.00
0.3070 85,143.15 12,708.00 97,851.15
Harga per satuan pekerjaan dibulatkan 97,851.00

17. Memasang 1 m2 atap asbes gelombang (3,00 x 1,08) m x 6 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Asbes Gelombang lbr 0.3400 103,950.00 35,343.00
Paku Pancing kg 0.1200 20,700.00 2,484.00
Tenaga Kerja :
Pekerja oh 0.1400 31,500.00 4,410.00
Tukang Kayu oh 0.0700 54,000.00 3,780.00
Kepala Tukang oh 0.0070 63,000.00 441.00
Mandor oh 0.0070 63,000.00 441.00
0.2240 37,827.00 9,072.00 46,899.00
Harga per satuan pekerjaan dibulatkan 46,899.00

17.a. Memasang 1 m2 atap asbes gelombang (3,00 x 1,08) m x 6 mm rangka kayu kelas III (Kruing)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kayu (5 x 7) cm m3 0.0085 6,300,000.00 53,550.00
Paku 5 dan 10 cm kg 0.0700 14,220.00 995.40
Asbes Gelombang lbr 0.3400 103,950.00 35,343.00
Paku Pancing kg 0.1200 20,700.00 2,484.00
Tenaga Kerja :
Pekerja oh 0.1800 31,500.00 5,670.00
Tukang Kayu oh 0.1100 54,000.00 5,940.00
Kepala Tukang oh 0.0110 63,000.00 693.00
Mandor oh 0.0090 63,000.00 567.00
0.3100 92,372.40 12,870.00 105,242.40
Harga per satuan pekerjaan dibulatkan 105,242.00

23. Memasang 1 m' bubung stel gelombang 1,05 m

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Bubung Stel Gelombang lbr 2.1000 19,215.00 40,351.50
Paku Sekrup bh 4.0000 315.00 1,260.00
Tenaga Kerja :
Pekerja oh 0.0840 31,500.00 2,646.00
Tukang Kayu oh 0.1250 54,000.00 6,750.00
Kepala Tukang oh 0.0130 63,000.00 819.00
Mandor oh 0.0040 63,000.00 252.00
0.2260 41,611.50 10,467.00 52,078.50
Harga per satuan pekerjaan dibulatkan 52,078.00
30. Memasang 1 m2 atap genteng beton G.6.-3#3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Genteng Beton bh 11.0000 1,980.00 21,780.00
Paku Biasa kg 0.0300 14,220.00 426.60
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0100 63,000.00 630.00
0.3200 22,206.60 12,960.00 35,166.60
Harga per satuan pekerjaan dibulatkan 35,166.00

34. Memasang 1 m' nok genteng beton

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Nok Genteng Beton bh 3.5000 8,100.00 28,350.00
Paku Biasa kg 0.0500 14,220.00 711.00
Semen Abu-Abu kg 10.8000 1,269.00 13,705.20
Pasir Pasang m3 0.0320 104,850.00 3,355.20
Semen Warna kg 1.0000 4,950.00 4,950.00
Tenaga Kerja :
Pekerja oh 0.4000 31,500.00 12,600.00
Tukang Kayu oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0200 63,000.00 1,260.00
0.6400 51,071.40 25,920.00 76,991.40
Harga per satuan pekerjaan dibulatkan 76,991.00

38. Memasang 1 m2 atap seng gelombang

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Seng Gelombang bjls lbr 0.7000 71,460.00 50,022.00
Paku Biasa kg 0.0200 14,220.00 284.40
Tenaga Kerja :
Pekerja oh 0.1200 31,500.00 3,780.00
Tukang Kayu oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0060 63,000.00 378.00
0.1920 50,306.40 7,776.00 58,082.40
Harga per satuan pekerjaan dibulatkan 58,082.00

39. Memasang 1 m2 atap nok seng

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Seng Plat lbr 0.4000 68,184.00 27,273.60
Kayu 5/7 m3 0.0040 6,300,000.00 25,200.00
Paku Biasa kg 0.0600 14,220.00 853.20
Tenaga Kerja :
Pekerja oh 0.1250 31,500.00 3,937.50
Tukang Kayu oh 0.2500 54,000.00 13,500.00
Kepala Tukang oh 0.0250 63,000.00 1,575.00
Mandor oh 0.0060 63,000.00 378.00
0.4060 53,326.80 19,390.50 72,717.30
Harga per satuan pekerjaan dibulatkan 72,717.00
F.6 2. M2 60,408.00

F.6 3. M2 71,658.00

F.6 5. M2 64,346.00

F.6 6. M1 59,443.00

F.6 7. M2 86,913.00
F.6 12. M2 39,507.00

F.6 12.a. M2 97,851.00

0.04
0.04
0
0

F.6 17. M2 46,899.00

F.6 17.a. M2 105,242.00

F.6 23. M1 52,078.00


F.6 30. M2 35,166.00

F.6 34. M1 76,991.00

F.6 38. M2 58,082.00

F.6 39. M2 72,717.00


H.6. HARGA SATUAN PEKERJAAN LANGIT-LANGIT H.6.-1#2

1. Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm dan 6 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Asbes Semen m2 1.1000 16,065.00 17,671.50
Paku Tripleks kg 0.0100 14,220.00 142.20
Tenaga Kerja :
Pekerja oh 0.0300 31,500.00 945.00
Tukang Kayu oh 0.0700 54,000.00 3,780.00
Kepala Tukang oh 0.0070 63,000.00 441.00
Mandor oh 0.0040 63,000.00 252.00
0.1110 17,813.70 5,418.00 23,231.70
Harga per satuan pekerjaan dibulatkan 23,231.00

1.a. Memasang 1 m2 langit-langit asbes semen, tebal 4 mm rangka kayu meranti

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaso-kaso (4 x 6) cm m3 0.0108 4,410,000.00 47,628.00
Paku 7 sampai 10 cm kg 0.2000 14,220.00 2,844.00
Asbes Semen m2 1.1000 16,065.00 17,671.50
Paku Tripleks kg 0.0100 14,220.00 142.20
Tenaga Kerja :
Pekerja oh 0.1800 31,500.00 5,670.00
Tukang Kayu oh 0.3200 54,000.00 17,280.00
Kepala Tukang oh 0.0320 63,000.00 2,016.00
Mandor oh 0.0790 63,000.00 4,977.00
0.6110 68,285.70 29,943.00 98,228.70
Harga per satuan pekerjaan dibulatkan 98,228.00

7. Memasang 1 m2 langit-langit gypsum board ukuran (120 x 240) cm, tebal 9 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Gypsum Board lbr 0.3640 63,000.00 22,932.00
Paku Sekrup bh 9.0000 315.00 2,835.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Kayu oh 0.0500 54,000.00 2,700.00
Kepala Tukang oh 0.0050 63,000.00 315.00
Mandor oh 0.0050 63,000.00 0.00
0.1600 25,767.00 6,165.00 31,932.00
Harga per satuan pekerjaan dibulatkan 31,932.00

7b. Memasang 1 m2 langit-langit gypsum rangka plafon metal (easy frame)

Uraian Satuan Indeks Harga Satuan Harga Satuan Jumlah Harga Satuan
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Easy Frame TCR m' 3.0000 7,500.00 22,500.00
Easy Bottom m' 3.0000 6,000.00 18,000.00
Wall Angle m' 0.4000 4,000.00 1,600.00
Clip bh 9.0000 2,200.00 19,800.00
Road btg 4.0000 6,600.00 26,400.00
Gypsum m2 1.0000 21,875.00 21,875.00
Skrup bh 20.0000 315.00 6,300.00
Tenaga Kerja :
Ongkos Pasang m2 1.0000 12,000.00
116,475.00 12,000.00 128,475.00
Harga per satuan pekerjaan dibulatkan 128,475.00

8. Memasang 1 m' list plafond gypsum profil

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
List Gypsum Profil m' 1.0500 18,000.00 18,900.00
Tepung Gypsum kg 0.1500 1,710.00 256.50
Tenaga Kerja :
Pekerja oh 0.0600 31,500.00 1,890.00
Tukang Kayu oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0030 63,000.00 189.00
0.1290 19,156.50 5,697.00 24,853.50
Harga per satuan pekerjaan dibulatkan 24,853.00
10. Memasang 1 m' list langit-langit kayu profil H.6.-2#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
List Kayu Profil m' 1.0500 2,970.00 3,118.50
Paku kg 0.0100 14,220.00 142.20
Tenaga Kerja :
Pekerja oh 0.0500 31,500.00 1,575.00
Tukang Kayu oh 0.0500 54,000.00 2,700.00
Kepala Tukang oh 0.0050 63,000.00 315.00
Mandor oh 0.0030 63,000.00 189.00
0.1080 3,260.70 4,779.00 8,039.70
Harga per satuan pekerjaan dibulatkan 8,039.00

11. Memasang 1 m2 Rangka Holllow 40.40.2 H.6.-2#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
` m' 4.5000 9,450.00 42,525.00
Tenaga Kerja :
Pekerja oh 0.2400 31,500.00 7,560.00
Tukang Kayu oh 0.3000 54,000.00 16,200.00
Kepala Tukang oh 0.0960 63,000.00 6,048.00
Mandor oh 0.0320 63,000.00 2,016.00
0.6680 42,525.00 31,824.00 74,349.00
Harga per satuan pekerjaan dibulatkan 74,349.00
F.6 1. M2 23,231.00

F.6 1.a. M2 98,228.00

F.6 7. M2 31,932.00

F.6 7b. M2 128,475.00

F.6 8. M1 24,853.00
F.6 10. M1 8,039.00

F.6 11. M1 74,349.00


I.6. HARGA SATUAN PEKERJAAN PIPA DAN SANITASI I.6.-1#7

1. Memasang 1 bh kloset duduk/monoblok

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kloset Duduk/Monoblok bh 1.0000 1,152,000.00 1,152,000.00
Perlengkapan 6 % set 0.0600 69,120.00 4,147.20
Tenaga Kerja :
Pekerja oh 3.3000 31,500.00 103,950.00
Tukang Batu oh 1.1000 54,000.00 59,400.00
Kepala Tukang oh 0.0110 63,000.00 693.00
Mandor oh 0.1600 63,000.00 10,080.00
4.5710 1,156,147.20 174,123.00 1,330,270.20
Harga per satuan pekerjaan dibulatkan 1,330,270.00

2. Memasang 1 bh kloset jongkok porselen

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kloset Jongkok Porselen bh 1.0000 292,500.00 292,500.00
Semen Portland kg 6.0000 1,269.00 7,614.00
Pasir Pasang m3 0.0100 104,850.00 1,048.50
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Batu oh 1.5000 54,000.00 81,000.00
Kepala Tukang oh 0.1500 63,000.00 9,450.00
Mandor oh 0.1600 63,000.00 10,080.00
2.8100 301,162.50 132,030.00 433,192.50
Harga per satuan pekerjaan dibulatkan 433,192.00

4. Memasang 1 bh urinoir

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Urinoir bh 1.0000 585,000.00 585,000.00
Perlengkapan set 0.3000 175,500.00 52,650.00
Semen Portland kg 6.0000 1,269.00 7,614.00
Pasir Pasang m3 0.0100 104,850.00 1,048.50
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Batu oh 1.0000 54,000.00 54,000.00
Kepala Tukang oh 0.1000 63,000.00 6,300.00
Mandor oh 0.1000 63,000.00 6,300.00
2.2000 646,312.50 98,100.00 744,412.50
Harga per satuan pekerjaan dibulatkan 744,412.00

5. Memasang 1 bh wastafel

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Wastafel bh 1.0000 157,500.00 157,500.00
Perlengkapan set 0.1200 18,900.00 2,268.00
Semen Portland kg 6.0000 1,269.00 7,614.00
Pasir Pasang m3 0.0100 104,850.00 1,048.50
Tenaga Kerja :
Pekerja oh 1.2000 31,500.00 37,800.00
Tukang Batu oh 1.4500 54,000.00 78,300.00
Kepala Tukang oh 0.1500 63,000.00 9,450.00
Mandor oh 0.1000 63,000.00 6,300.00
2.9000 168,430.50 131,850.00 300,280.50
Harga per satuan pekerjaan dibulatkan 300,280.00

7. Memasang 1 bh bak mandi fibreglass vol. 0,30 m3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Bak fibreglass bh 1.0000 247,500.00 247,500.00
Perlengkapan set 0.1800 44,550.00 8,019.00
Tenaga Kerja :
Pekerja oh 1.8000 31,500.00 56,700.00
Tukang Batu oh 2.7000 54,000.00 145,800.00
Kepala Tukang oh 0.5400 63,000.00 34,020.00
Mandor oh 0.1100 63,000.00 6,930.00
5.1500 255,519.00 243,450.00 498,969.00
Harga per satuan pekerjaan dibulatkan 498,969.00
8. Memasang 1 bh bak mandi batu bata vol. 0,3 m3 I.6.-2#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Batu Bata bh 300.0000 450.00 135,000.00
Semen Portland kg 120.0000 1,269.00 152,280.00
Pasir Pasang m3 0.3000 104,850.00 31,455.00
Keramik (20 x 25) m2 4.1860 47,250.00 197,790.70
Semen Nat kg 6.0000 4,950.00 29,700.00
Tenaga Kerja :
Pekerja oh 6.0000 31,500.00 189,000.00
Tukang Batu oh 3.0000 54,000.00 162,000.00
Kepala Tukang oh 0.3000 63,000.00 18,900.00
Mandor oh 0.3000 63,000.00 18,900.00
9.6000 546,225.70 388,800.00 935,025.70
Harga per satuan pekerjaan dibulatkan 935,025.00

10. Memasang 1 bh bak beton vol. 1 m3 air

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Beton 1 : 1 1/2 : 2 1/2 m3 0.9000 #REF! #REF!
Besi Beton kg 18.0000 11,520.00 207,360.00
Kayu Cetakan m3 0.1600 3,690,000.00 590,400.00
Keramik m2 5.0000 36,855.00 184,275.00
Perlengkapan set 0.1000 #REF! #REF!
Tenaga Kerja :
Pekerja oh 3.5000 31,500.00 110,250.00
Tukang Batu oh 4.5000 54,000.00 243,000.00
Kepala Tukang oh 0.9000 63,000.00 56,700.00
Mandor oh 0.9000 63,000.00 56,700.00
9.8000 #REF! 466,650.00 #REF!
Harga per satuan pekerjaan dibulatkan #REF!

14. Memasang 1 m' pipa beton F 15 cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Beton dia 15 cm bh 1.1000 45,024.30 49,526.73
Batu Bata bh 6.0000 450.00 2,700.00
Semen Potland kg 3.9200 1,269.00 4,974.48
Pasir Pasang m3 0.0560 104,850.00 5,871.60
Pasir Urug m3 0.0240 45,360.00 1,088.64
Tenaga Kerja :
Pekerja oh 0.1400 31,500.00 4,410.00
Tukang Batu oh 0.0700 54,000.00 3,780.00
Kepala Tukang oh 0.0070 63,000.00 441.00
Mandor oh 0.0070 63,000.00 441.00
0.2240 64,161.45 9,072.00 73,233.45
Harga per satuan pekerjaan dibulatkan 73,233.00

14.a. Memasang 1 m' pipa beton F 20 cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Beton dia 20 cm bh 1.1000 30,600.00 33,660.00
Batu Bata bh 10.0000 450.00 4,500.00
Semen Potland kg 3.9200 1,269.00 4,974.48
Pasir Pasang m3 0.0560 104,850.00 5,871.60
Pasir Urug m3 0.0240 45,360.00 1,088.64
Tenaga Kerja :
Pekerja oh 0.1400 31,500.00 4,410.00
Tukang Batu oh 0.0700 54,000.00 3,780.00
Kepala Tukang oh 0.0070 63,000.00 441.00
Mandor oh 0.0070 63,000.00 441.00
0.2240 50,094.72 9,072.00 59,166.72
Harga per satuan pekerjaan dibulatkan 59,166.00
15. Memasang 1 m' pipa beton F 30 cm I.6.-3#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Beton dia 30 cm bh 1.1000 45,000.00 49,500.00
Batu Bata bh 12.0000 450.00 5,400.00
Semen Potland kg 10.3000 1,269.00 13,070.70
Pasir Pasang m3 0.0610 104,850.00 6,395.85
Pasir Urug m3 0.0690 45,360.00 3,129.84
Tenaga Kerja :
Pekerja oh 0.3800 31,500.00 11,970.00
Tukang Batu oh 0.1900 54,000.00 10,260.00
Kepala Tukang oh 0.0190 63,000.00 1,197.00
Mandor oh 0.0190 63,000.00 1,197.00
0.6080 77,496.39 24,624.00 102,120.39
Harga per satuan pekerjaan dibulatkan 102,120.00

15.a. Memasang 1 m' pipa beton F 40 cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Beton dia 40 cm bh 1.1000 54,000.00 59,400.00
Batu Bata bh 17.0000 450.00 7,650.00
Semen Potland kg 10.3000 1,269.00 13,070.70
Pasir Pasang m3 0.0610 104,850.00 6,395.85
Pasir Urug m3 0.0690 45,360.00 3,129.84
Tenaga Kerja :
Pekerja oh 0.3800 31,500.00 11,970.00
Tukang Batu oh 0.1900 54,000.00 10,260.00
Kepala Tukang oh 0.0190 63,000.00 1,197.00
Mandor oh 0.0190 63,000.00 1,197.00
0.6080 89,646.39 24,624.00 114,270.39
Harga per satuan pekerjaan dibulatkan 114,270.00

15.b. Memasang 1 m' pipa beton F 50 cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Beton dia 50 cm bh 2.1000 63,000.00 132,300.00
Batu Bata bh 20.0000 450.00 9,000.00
Semen Potland kg 10.3000 1,269.00 13,070.70
Pasir Pasang m3 0.0610 104,850.00 6,395.85
Pasir Urug m3 0.0690 45,360.00 3,129.84
Tenaga Kerja :
Pekerja oh 0.3800 31,500.00 11,970.00
Tukang Batu oh 0.1900 54,000.00 10,260.00
Kepala Tukang oh 0.0190 63,000.00 1,197.00
Mandor oh 0.0190 63,000.00 1,197.00
0.6080 163,896.39 24,624.00 188,520.39
Harga per satuan pekerjaan dibulatkan 188,520.00

16. Memasang 1 bh bak kontrol pasangan batu bata (30 x 30) cm t 35 cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Batu Bata bh 108.7500 450.00 48,937.50
Semen Potland kg 44.0000 1,269.00 55,836.00
Pasir Pasang m3 0.0700 104,850.00 7,339.50
Batu Kerikil m3 0.0700 181,800.00 12,726.00
Besi Beton kg 1.6000 11,520.00 18,432.00
Pasir Beton m3 0.0600 104,850.00 6,291.00
Tenaga Kerja :
Pekerja oh 3.2000 31,500.00 100,800.00
Tukang Batu oh 1.0150 54,000.00 54,810.00
Kepala Tukang oh 0.0015 63,000.00 94.50
Mandor oh 0.0160 63,000.00 1,008.00
4.2325 149,562.00 156,712.50 306,274.50
Harga per satuan pekerjaan dibulatkan 306,274.00
17. Memasang 1 bh bak kontrol pasangan batu bata (45 x 45) cm t 50 cm I.6.-4#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Batu Bata bh 187.5000 450.00 84,375.00
Semen Potland kg 77.0000 1,269.00 97,713.00
Pasir Pasang m3 0.1300 104,850.00 13,630.50
Batu Kerikil m3 0.0200 181,800.00 3,636.00
Besi Beton kg 2.6000 11,520.00 29,952.00
Pasir Beton m3 0.0900 104,850.00 9,436.50
Tenaga Kerja :
Pekerja oh 3.2000 31,500.00 100,800.00
Tukang Batu oh 1.0150 54,000.00 54,810.00
Kepala Tukang oh 0.0015 63,000.00 94.50
Mandor oh 0.0160 63,000.00 1,008.00
4.2325 238,743.00 156,712.50 395,455.50
Harga per satuan pekerjaan dibulatkan 395,455.00

19. Memasang 1 m' pipa galvanis dia 1/2"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Galvanis m' 1.2000 18,000.00 21,600.00
Perlengkapan set 0.3500 6,300.00 2,205.00
Tenaga Kerja :
Pekerja oh 0.0540 31,500.00 1,701.00
Tukang Besi oh 0.0900 54,000.00 4,860.00
Kepala Tukang oh 0.0090 63,000.00 567.00
Mandor oh 0.0270 63,000.00 1,701.00
0.1800 23,805.00 8,829.00 32,634.00
Harga per satuan pekerjaan dibulatkan 32,634.00

20. Memasang 1 m' pipa galvanis dia 3/4"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Galvanis m' 1.2000 24,585.00 29,502.00
Perlengkapan set 0.3500 8,604.75 3,011.66
Tenaga Kerja :
Pekerja oh 0.0540 31,500.00 1,701.00
Tukang Besi oh 0.0900 54,000.00 4,860.00
Kepala Tukang oh 0.0090 63,000.00 567.00
Mandor oh 0.0270 63,000.00 1,701.00
0.1800 32,513.66 8,829.00 41,342.66
Harga per satuan pekerjaan dibulatkan 41,342.00

21. Memasang 1 m' pipa galvanis dia 1"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Galvanis m' 1.2000 29,940.00 35,928.00
Perlengkapan set 0.3500 10,479.00 3,667.65
Tenaga Kerja :
Pekerja oh 0.0540 31,500.00 1,701.00
Tukang Besi oh 0.0900 54,000.00 4,860.00
Kepala Tukang oh 0.0090 63,000.00 567.00
Mandor oh 0.0270 63,000.00 1,701.00
0.1800 39,595.65 8,829.00 48,424.65
Harga per satuan pekerjaan dibulatkan 48,424.00

22. Memasang 1 m' pipa galvanis dia 1 1/2"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Galvanis m' 1.2000 48,210.00 57,852.00
Perlengkapan set 0.3500 16,873.50 5,905.73
Tenaga Kerja :
Pekerja oh 0.1080 31,500.00 3,402.00
Tukang Besi oh 0.1800 54,000.00 9,720.00
Kepala Tukang oh 0.0180 63,000.00 1,134.00
Mandor oh 0.0054 63,000.00 340.20
0.3114 63,757.73 14,596.20 78,353.93
Harga per satuan pekerjaan dibulatkan 78,353.00

22.a. Memasang 1 m' pipa galvanis dia 2" I.6.-5#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Galvanis m' 1.2000 105,375.00 126,450.00
Perlengkapan set 0.3500 36,881.25 12,908.44
Tenaga Kerja :
Pekerja oh 0.1080 31,500.00 3,402.00
Tukang Besi oh 0.1800 54,000.00 9,720.00
Kepala Tukang oh 0.0180 63,000.00 1,134.00
Mandor oh 0.0054 63,000.00 340.20
0.3114 139,358.44 14,596.20 153,954.64
Harga per satuan pekerjaan dibulatkan 153,954.00

22.b. Memasang 1 m' pipa galvanis dia 2 1/2"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Galvanis m' 1.2000 144,135.00 172,962.00
Perlengkapan set 0.3500 50,447.25 17,656.54
Tenaga Kerja :
Pekerja oh 0.1080 31,500.00 3,402.00
Tukang Besi oh 0.1800 54,000.00 9,720.00
Kepala Tukang oh 0.0180 63,000.00 1,134.00
Mandor oh 0.0054 63,000.00 340.20
0.3114 190,618.54 14,596.20 205,214.74
Harga per satuan pekerjaan dibulatkan 205,214.00

23. Memasang 1 m' pipa galvanis dia 3"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Galvanis m' 1.2000 154,743.75 185,692.50
Perlengkapan set 0.3500 54,160.31 18,956.11
Tenaga Kerja :
Pekerja oh 0.1080 31,500.00 3,402.00
Tukang Besi oh 0.1800 54,000.00 9,720.00
Kepala Tukang oh 0.0180 63,000.00 1,134.00
Mandor oh 0.0054 63,000.00 340.20
0.3114 204,648.61 14,596.20 219,244.81
Harga per satuan pekerjaan dibulatkan 219,244.00

24. Memasang 1 m' pipa galvanis dia 4"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa Galvanis m' 1.2000 208,481.25 250,177.50
Perlengkapan set 0.3500 72,968.44 25,538.95
Tenaga Kerja :
Pekerja oh 0.1350 31,500.00 4,252.50
Tukang Besi oh 0.2250 54,000.00 12,150.00
Kepala Tukang oh 0.0225 63,000.00 1,417.50
Mandor oh 0.0068 63,000.00 428.40
0.3893 275,716.45 18,248.40 293,964.85
Harga per satuan pekerjaan dibulatkan 293,964.00

25. Memasang 1 m' pipa PVC tipe AW dia 1/2"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 5,940.00 7,128.00
Perlengkapan set 0.3500 2,079.00 727.65
Tenaga Kerja :
Pekerja oh 0.0360 31,500.00 1,134.00
Tukang Pipa oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0018 63,000.00 113.40
0.1038 7,855.65 4,865.40 12,721.05
Harga per satuan pekerjaan dibulatkan 12,721.00

26. Memasang 1 m' pipa PVC tipe AW dia 3/4" I.6.-6#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 6,750.00 8,100.00
Perlengkapan set 0.3500 2,362.50 826.88
Tenaga Kerja :
Pekerja oh 0.0360 31,500.00 1,134.00
Tukang Pipa oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0018 63,000.00 113.40
0.1038 8,926.88 4,865.40 13,792.28
Harga per satuan pekerjaan dibulatkan 13,792.00

27. Memasang 1 m' pipa PVC tipe AW dia 1"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 8,550.00 10,260.00
Perlengkapan set 0.3500 2,992.50 1,047.38
Tenaga Kerja :
Pekerja oh 0.0360 31,500.00 1,134.00
Tukang Pipa oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0018 63,000.00 113.40
0.1038 11,307.38 4,865.40 16,172.78
Harga per satuan pekerjaan dibulatkan 16,172.00

28. Memasang 1 m' pipa PVC tipe AW dia 1 1/2"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 8,775.00 10,530.00
Perlengkapan set 0.3500 3,071.25 1,074.94
Tenaga Kerja :
Pekerja oh 0.0360 31,500.00 1,134.00
Tukang Pipa oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0018 63,000.00 113.40
0.1038 11,604.94 4,865.40 16,470.34
Harga per satuan pekerjaan dibulatkan 16,470.00

29. Memasang 1 m' pipa PVC tipe D dia 2"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 10,260.00 12,312.00
Perlengkapan set 0.3500 3,591.00 1,256.85
Tenaga Kerja :
Pekerja oh 0.0540 31,500.00 1,701.00
Tukang Pipa oh 0.0900 54,000.00 4,860.00
Kepala Tukang oh 0.0090 63,000.00 567.00
Mandor oh 0.0027 63,000.00 170.10
0.1557 13,568.85 7,298.10 20,866.95
Harga per satuan pekerjaan dibulatkan 20,866.00

31. Memasang 1 m' pipa PVC tipe D dia 3"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 17,325.00 20,790.00
Perlengkapan set 0.3500 6,063.75 2,122.31
Tenaga Kerja :
Pekerja oh 0.0810 31,500.00 2,551.50
Tukang Pipa oh 0.1350 54,000.00 7,290.00
Kepala Tukang oh 0.0135 63,000.00 850.50
Mandor oh 0.0041 63,000.00 258.30
0.2336 22,912.31 10,950.30 33,862.61
Harga per satuan pekerjaan dibulatkan 33,862.00

31. Memasang 1 m' pipa PVC tipe D dia 3"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 24,750.00 29,700.00
Perlengkapan set 0.3500 8,662.50 3,031.88
Tenaga Kerja :
Pekerja oh 0.0810 31,500.00 2,551.50
Tukang Pipa oh 0.1350 54,000.00 7,290.00
Kepala Tukang oh 0.0135 63,000.00 850.50
Mandor oh 0.0041 63,000.00 258.30
0.2336 32,731.88 10,950.30 43,682.18
Harga per satuan pekerjaan dibulatkan 43,682.00

32. Memasang 1 m' pipa PVC tipe D dia 4" I.6.-7#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 24,075.00 28,890.00
Perlengkapan set 0.3500 8,426.25 2,949.19
Tenaga Kerja :
Pekerja oh 0.0810 31,500.00 2,551.50
Tukang Pipa oh 0.1350 54,000.00 7,290.00
Kepala Tukang oh 0.0135 63,000.00 850.50
Mandor oh 0.0041 63,000.00 258.30
0.2336 31,839.19 10,950.30 42,789.49
Harga per satuan pekerjaan dibulatkan 42,789.00

32.a Memasang 1 m' pipa PVC tipe AW dia 4" I.6.-7#7

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 33,750.00 40,500.00
Perlengkapan set 0.3500 11,812.50 4,134.38
Tenaga Kerja :
Pekerja oh 0.0810 31,500.00 2,551.50
Tukang Pipa oh 0.1350 54,000.00 7,290.00
Kepala Tukang oh 0.0135 63,000.00 850.50
Mandor oh 0.0041 63,000.00 258.30
0.2336 44,634.38 10,950.30 55,584.68
Harga per satuan pekerjaan dibulatkan 55,584.00

33. Memasang 1 m' pipa PVC tipe D dia 5"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pipa PVC m' 1.2000 33,750.00 40,500.00
Perlengkapan set 0.3500 11,812.50 4,134.38
Tenaga Kerja :
Pekerja oh 0.0810 31,500.00 2,551.50
Tukang Pipa oh 0.1350 54,000.00 7,290.00
Kepala Tukang oh 0.0135 63,000.00 850.50
Mandor oh 0.0041 63,000.00 258.30
0.2336 44,634.38 10,950.30 55,584.68
Harga per satuan pekerjaan dibulatkan 55,584.00

34. Memasang 1 bh bak cuci stainless steel

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Bak Cuci Stainless Steel bh 1.0000 337,500.00 337,500.00
Water Drain + asesories set 1.0000 108,000.00 108,000.00
Tenaga Kerja :
Pekerja oh 0.0300 31,500.00 945.00
Tukang Batu oh 0.3000 54,000.00 16,200.00
Kepala Tukang oh 0.0300 63,000.00 1,890.00
Mandor oh 0.0015 63,000.00 94.50
0.3615 445,500.00 19,129.50 464,629.50
Harga per satuan pekerjaan dibulatkan 464,629.00

35. Memasang 1 bh kran dia 3/4 atau 1/2"

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kran Air bh 1.0000 22,500.00 22,500.00
Seal Tape bh 0.0250 2,250.00 56.25
Tenaga Kerja :
Pekerja oh 0.0100 31,500.00 315.00
Tukang Pipa oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0050 63,000.00 315.00
0.1250 22,556.25 6,660.00 29,216.25
Harga per satuan pekerjaan dibulatkan 29,216.00

36. Memasang 1 bh floor drain

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Floor Drain bh 1.0000 157,500.00 157,500.00
Tenaga Kerja :
Pekerja oh 0.0100 31,500.00 315.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0050 63,000.00 315.00
0.1250 157,500.00 6,660.00 164,160.00
Harga per satuan pekerjaan dibulatkan 164,160.00

37a. Membuat Septictank

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Galian Tanah M3 10.0409 25,200.00 253,029.67


Urugan tanah M3 1.2000 58,050.00 69,660.00
Urugan Sirtu M3 1.4915 129,870.00 193,701.11
Pasangan Bata Kosong M3 1.8991 1,668,203.00 3,168,037.61
Pas. bata merah 1Pc : 2 Ps M2 10.8295 75,956.00 822,563.98
Plesteran 1Pc : 3 Ps M3 9.4376 31,719.00 299,351.23
Pasang Ijuk Kg 10.0000 23,832.40 238,324.00
Balok Gantung M3 0.0144 1,006,080.00 14,487.55
Pasang Plat Penutup Bh 0.2141 1,006,080.00 215,403.74
Pasang PVC Ø 4 " M1 1.5000 42,789.00 64,183.50
Pasang GIP Ø 2 " M1 0.9000 153,954.00 138,558.60
5,477,300.99 0.00 5,477,300.99
Harga per satuan pekerjaan dibulatkan 5,477,300.00
F.6 1. Bh 1,330,270.00

F.6 2. Bh 433,192.00

F.6 4. Bh 744,412.00

F.6 5. Bh 300,280.00

F.6 7. Bh 498,969.00
F.6 8. Bh 935,025.00

F.6 10. Bh #REF!

F.6 14. M1 73,233.00

F.6 14.a. M1 59,166.00


F.6 15. M1 102,120.00

F.6 15.a. M1 114,270.00

F.6 15.b. M1 188,520.00

F.6 16. M1 306,274.00


F.6 17. M1 395,455.00

F.6 19. M1 32,634.00

F.6 20. M1 41,342.00

F.6 21. M1 48,424.00

F.6 22. M1 78,353.00


F.6 22.a. M1 153,954.00

F.6 22.b. M1 205,214.00

F.6 23. M1 219,244.00

F.6 24. M1 293,964.00

F.6 25. M1 12,721.00


F.6 26. M1 13,792.00

F.6 27. M1 16,172.00

F.6 28. M1 16,470.00

F.6 29. M1 20,866.00

F.6 31. M1 33,862.00


F.6 31. M1 43,682.00

F.6 32. M1 42,789.00

F.6 32.a M1 55,584.00

F.6 33. M1 55,584.00

F.6 34. M1 464,629.00


F.6 35. M1 29,216.00

F.6 36. M1 164,160.00

F.6 37a. M1 5,477,300.00


J.6. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM J.6.-1#3

1. Memasang 1 kg besi profil

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Besi Profil kg 1.1500 12,016.00 13,818.40
Tenaga Kerja :
Pekerja oh 0.0600 31,500.00 1,890.00
Tukang Besi oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0030 63,000.00 189.00
0.1290 13,818.40 5,697.00 19,515.40
Harga per satuan pekerjaan dibulatkan 19,515.00

2. Memasang 1 kg rangka kuda-kuda baja IWF

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Besi Baja IWF kg 1.1500 14,450.00 16,617.50
Tenaga Kerja :
Pekerja oh 0.0600 31,500.00 1,890.00
Tukang Besi oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0030 63,000.00 189.00
0.1290 16,617.50 5,697.00 22,314.50
Harga per satuan pekerjaan dibulatkan 22,314.00

3. Mengerjakan 100 kg pekerjaan perakitan

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Solar ltr 1.0000 10,800.00 10,800.00
Minyak Pelumas ltr 0.1000 27,877.50 2,787.75
Sewa Alat jam 0.8000 23,500.00 18,800.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Besi oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0010 63,000.00 63.00
Mandor oh 0.0050 63,000.00 315.00
0.2060 32,387.75 8,928.00 41,315.75
Harga per satuan pekerjaan dibulatkan 41,315.00

5. Mengerjakan 1 cm pengelasan dengan las listrik

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kawat Las Listrik kg 0.0400 29,450.00 1,178.00
Solar ltr 0.0300 10,800.00 324.00
Minyak Pelumas ltr 0.0040 27,877.50 111.51
Sewa Alat jam 0.0170 23,500.00 399.50
Tenaga Kerja :
Pekerja oh 0.0040 31,500.00 126.00
Tukang Besi oh 0.0020 54,000.00 108.00
Kepala Tukang oh 0.0002 63,000.00 12.60
Mandor oh 0.0002 63,000.00 12.60
0.0064 2,013.01 259.20 2,272.21
Harga per satuan pekerjaan dibulatkan 2,272.00

8. Memasang 1 m2 pintu lipat (folding door)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pintu Lipat m2 1.0000 1,187,500.00 1,187,500.00
Tenaga Kerja :
Pekerja oh 0.4400 31,500.00 13,860.00
Tukang Besi oh 0.4400 54,000.00 23,760.00
Kepala Tukang oh 0.0440 63,000.00 2,772.00
Mandor oh 0.0220 63,000.00 1,386.00
0.9460 1,187,500.00 41,778.00 1,229,278.00
Harga per satuan pekerjaan dibulatkan 1,229,278.00
10. Memasang 1 m2 pintu rolling door aluminium J.6.-2#3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Rolling Door Aluminium m2 1.0000 503,500.00 503,500.00
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Besi oh 1.0000 54,000.00 54,000.00
Kepala Tukang oh 0.1000 63,000.00 6,300.00
Mandor oh 0.0500 63,000.00 3,150.00
2.1500 503,500.00 94,950.00 598,450.00
Harga per satuan pekerjaan dibulatkan 598,450.00

11.a Memasang 1 m' kusen pintu/jendela kaca mati aluminium

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Profil Aluminium m' 1.1000 70,822.50 77,904.75
Skrup Fixer bh 2.0000 360.00 720.00
Sealant tube 0.0600 33,075.00 1,984.50
Tenaga Kerja :
Pekerja oh 0.0430 31,500.00 1,354.50
Tukang Besi oh 0.0430 54,000.00 2,322.00
Kepala Tukang oh 0.0043 63,000.00 270.90
Mandor oh 0.0021 63,000.00 132.30
0.0924 80,609.25 4,079.70 84,688.95
Harga per satuan pekerjaan dibulatkan 84,688.00

11.b Memasang 1 m' kusen pintu/jendela aluminium

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Profil Aluminium m' 1.1000 70,822.50 77,904.75
Skrup Fixer bh 2.0000 360.00 720.00
Sealant tube 0.0600 33,075.00 1,984.50
Pipa hollow aluminium (1 x 3) cm btg 1.1000 5,985.00 6,583.50
Paku skrup 1" bh 4.0000 315.00 1,260.00
Tenaga Kerja :
Pekerja oh 0.0430 31,500.00 1,354.50
Tukang Besi oh 0.0430 54,000.00 2,322.00
Kepala Tukang oh 0.0043 63,000.00 270.90
Mandor oh 0.0021 63,000.00 132.30
0.0924 88,452.75 4,079.70 92,532.45
Harga per satuan pekerjaan dibulatkan 92,532.00

12. Memasang 1 m2 pintu aluminium strip lebar 8 cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Profil Aluminium m' 4.4000 57,000.00 250,800.00
Aluminium Strip m' 14.6000 8,075.00 117,895.00
Tenaga Kerja :
Pekerja oh 0.0850 31,500.00 2,677.50
Tukang Besi oh 0.0850 54,000.00 4,590.00
Kepala Tukang oh 0.0085 63,000.00 535.50
Mandor oh 0.0042 63,000.00 264.60
0.1827 368,695.00 8,067.60 376,762.60
Harga per satuan pekerjaan dibulatkan 376,762.00

13. Memasang 1 m2 pintu kaca rangka aluminium

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pintu Aluminium m' 4.4000 74,812.50 329,175.00
Profil Kaca m' 4.5000 1,995.00 8,977.50
Kaca 5 mm m2 1.1000 86,940.00 95,634.00
Sealant tube 0.2700 33,075.00 8,930.25
Tenaga Kerja :
Pekerja oh 0.0850 31,500.00 2,677.50
Tukang Besi oh 0.0850 54,000.00 4,590.00
Kepala Tukang oh 0.0080 63,000.00 504.00
Mandor oh 0.0040 63,000.00 252.00
0.1820 442,716.75 8,023.50 450,740.25
Harga per satuan pekerjaan dibulatkan 450,740.00

13.a. Memasang 1 m2 jendela kaca rangka aluminium J.6.-3#3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Jendela Aluminium m' 4.4000 59,850.00 263,340.00
Profil Kaca m' 4.5000 1,995.00 8,977.50
Kaca 5 mm m2 1.1000 86,940.00 95,634.00
Sealant tube 0.2700 33,075.00 8,930.25
Tenaga Kerja :
Pekerja oh 0.0850 31,500.00 2,677.50
Tukang Besi oh 0.0850 54,000.00 4,590.00
Kepala Tukang oh 0.0080 63,000.00 504.00
Mandor oh 0.0040 63,000.00 252.00
0.1820 376,881.75 8,023.50 384,905.25
Harga per satuan pekerjaan dibulatkan 384,905.00

15 Memasang 1 m2 terali besi strip (2 x 3) mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Besi Strip kg 6.1770 13,157.50 81,273.88
Pengelasan cm 27.0800 2,272.00 61,525.76
Tenaga Kerja :
Pekerja oh 1.6700 31,500.00 52,605.00
Tukang Besi oh 1.6700 54,000.00 90,180.00
Kepala Tukang oh 0.1670 63,000.00 10,521.00
Mandor oh 0.0830 63,000.00 5,229.00
3.5900 142,799.64 158,535.00 301,334.64
Harga per satuan pekerjaan dibulatkan 301,334.00

16. Memasang 1 m2 kawat nyamuk

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kawat Nyamuk m2 1.1000 23,750.00 26,125.00
Pengelasan cm 11.1100 2,272.00 25,241.92
Baja Strip (0,2 x 2) cm kg 1.7160 13,157.50 22,578.27
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Tukang Besi oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0050 63,000.00 315.00
0.2150 73,945.19 9,495.00 83,440.19
Harga per satuan pekerjaan dibulatkan 83,440.00

17. Memasang 1 m2 jendela nako dan tralis

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Jendela Nako (rangka + kaca 5 mm) m2 1.1000 315,000.00 346,500.00
Paku Skrup bh 10.0000 72.00 720.00
Besi Strip kg 3.6000 13,157.50 47,367.00
Tenaga Kerja :
Pekerja oh 0.3000 31,500.00 9,450.00
Tukang Besi oh 0.3000 54,000.00 16,200.00
Kepala Tukang oh 0.0300 63,000.00 1,890.00
Mandor oh 0.0150 63,000.00 945.00
0.6450 394,587.00 28,485.00 423,072.00
Harga per satuan pekerjaan dibulatkan 423,072.00

18. Memasang 1 m' talang datar/jurai seng bjls 28 lebar 90 cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Seng Plat m' 1.0500 42,615.00 44,745.75
Paku kg 0.0150 14,220.00 213.30
Papan Kayu III m3 0.0190 3,690,000.00 70,110.00
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Besi oh 0.4000 54,000.00 21,600.00
Kepala Tukang oh 0.0250 63,000.00 1,575.00
Mandor oh 0.0100 63,000.00 630.00
0.6350 115,069.05 30,105.00 145,174.05
Harga per satuan pekerjaan dibulatkan 145,174.00

19. Memasang 1 m' talang 1/2 lingkaran dia 15 cm, seng plat bjls 30 lebar 45 J.6.-4#3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Seng Plat m' 1.0500 42,615.00 44,745.75
Paku kg 0.0100 14,220.00 142.20
Besi Strip kg 0.5000 13,157.50 6,578.75
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Tukang Besi oh 0.3000 54,000.00 16,200.00
Kepala Tukang oh 0.0300 63,000.00 1,890.00
Mandor oh 0.0070 63,000.00 441.00
0.4870 51,466.70 23,256.00 74,722.70
Harga per satuan pekerjaan dibulatkan 74,722.00
F.6 1. Kg 19,515.00

F.6 2. Kg 22,314.00

F.6 3. Kg 41,315.00

F.6 5. Cm 2,272.21

F.6 8. M2 1,229,278.00
F.6 10. M2 598,450.00

F.6 11.a M1 84,688.00

F.6 11.b M1 92,532.00

F.6 12. M2 376,762.00

F.6 13. M2 450,740.00


F.6 13.a. M2 384,905.00

F.6 15 M2 301,334.00

F.6 16. M2 83,440.00

F.6 17. M2 423,072.00

F.6 18. M1 145,174.00


F.6 19. M1 74,722.00
K.6. HARGA SATUAN PEKERJAAN PENGUNCI DAN KACA K.6.-1#3

2. Memasang 1 buah kunci tanam

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kunci Tanam bh 1.0000 61,020.00 61,020.00
Tenaga Kerja :
Pekerja oh 0.0100 31,500.00 315.00
Tukang Kayu oh 0.6000 54,000.00 32,400.00
Kepala Tukang oh 0.0600 63,000.00 3,780.00
Mandor oh 0.0050 63,000.00 315.00
0.6750 61,020.00 36,810.00 97,830.00
Harga per satuan pekerjaan dibulatkan 97,830.00

4. Memasang 1 buah kunci silinder

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kunci Silinder bh 1.0000 198,000.00 198,000.00
Tenaga Kerja :
Pekerja oh 0.0100 31,500.00 315.00
Tukang Kayu oh 0.6000 54,000.00 32,400.00
Kepala Tukang oh 0.0600 63,000.00 3,780.00
Mandor oh 0.0050 63,000.00 315.00
0.6750 198,000.00 36,810.00 234,810.00
Harga per satuan pekerjaan dibulatkan 234,810.00

5. Memasang 1 buah engsel pintu

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Engsel Pintu bh 1.0000 8,977.50 8,977.50
Tenaga Kerja :
Pekerja oh 0.0150 31,500.00 472.50
Tukang Kayu oh 0.1250 54,000.00 6,750.00
Kepala Tukang oh 0.0130 63,000.00 819.00
Mandor oh 0.0075 63,000.00 472.50
0.1605 8,977.50 8,514.00 17,491.50
Harga per satuan pekerjaan dibulatkan 17,491.00

6. Memasang 1 buah engsel jendela

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Engsel Jendela bh 1.0000 4,050.00 4,050.00
Tenaga Kerja :
Pekerja oh 0.0100 31,500.00 315.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0005 63,000.00 31.50
0.1205 4,050.00 6,376.50 10,426.50
Harga per satuan pekerjaan dibulatkan 10,426.00

9. Memasang 1 buah kait angin

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kait Angin bh 1.0000 4,500.00 4,500.00
Tenaga Kerja :
Pekerja oh 0.0100 31,500.00 315.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0005 63,000.00 31.50
0.1205 4,500.00 6,376.50 10,876.50
Harga per satuan pekerjaan dibulatkan 10,876.00
11. Memasang 1 buah kunci selot K.6.-2#3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kunci Selot bh 1.0000 148,320.00 148,320.00
Tenaga Kerja :
Pekerja oh 0.0200 31,500.00 630.00
Tukang Kayu oh 0.5000 54,000.00 27,000.00
Kepala Tukang oh 0.0500 63,000.00 3,150.00
Mandor oh 0.0010 63,000.00 63.00
0.5710 148,320.00 30,843.00 179,163.00
Harga per satuan pekerjaan dibulatkan 179,163.00

12. Memasang 1 buah handle pintu stainless steel

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Door Holder bh 1.0000 110,250.00 110,250.00
Tenaga Kerja :
Pekerja oh 0.0500 31,500.00 1,575.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0025 63,000.00 157.50
0.1625 110,250.00 7,762.50 118,012.50
Harga per satuan pekerjaan dibulatkan 118,012.00

12.a Memasang 1 buah pegangan pintu (door holder)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Handle pintu stainless steel bh 1.0000 103,500.00 103,500.00
Tenaga Kerja :
Pekerja oh 0.0500 31,500.00 1,575.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0025 63,000.00 157.50
0.1625 103,500.00 7,762.50 111,262.50
Harga per satuan pekerjaan dibulatkan 111,262.00

13. Memasang 1 buah door stop

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Door Stop bh 1.0000 14,850.00 14,850.00
Tenaga Kerja :
Pekerja oh 0.0100 31,500.00 315.00
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0005 63,000.00 31.50
0.1205 14,850.00 6,376.50 21,226.50
Harga per satuan pekerjaan dibulatkan 21,226.00

15. Memasang 1 buah kunci lemari

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kunci Lemari bh 1.0000 9,720.00 9,720.00
Tenaga Kerja :
Pekerja oh 0.0250 31,500.00 787.50
Tukang Kayu oh 0.1250 54,000.00 6,750.00
Kepala Tukang oh 0.0130 63,000.00 819.00
Mandor oh 0.0012 63,000.00 75.60
0.1642 9,720.00 8,432.10 18,152.10
Harga per satuan pekerjaan dibulatkan 18,152.00

15b. Memasang 1 buah Door Closser

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Door Closser bh 1.0000 216,125.00 216,125.00
Tenaga Kerja :
Pekerja oh 0.0100 35,000.00 350.00
Tukang Kayu oh 0.1000 60,000.00 6,000.00
Kepala Tukang oh 0.0100 70,000.00 700.00
Mandor oh 0.0005 70,000.00 35.00
0.1205 216,125.00 7,085.00 223,210.00
Harga per satuan pekerjaan dibulatkan 223,210.00

15c. Memasang 1 buah Door Stopper

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Door Closser bh 1.0000 15,580.00 15,580.00
Tenaga Kerja :
Pekerja oh 0.0100 35,000.00 350.00
Tukang Kayu oh 0.1000 60,000.00 6,000.00
Kepala Tukang oh 0.0100 70,000.00 700.00
Mandor oh 0.0005 70,000.00 35.00
0.1205 15,580.00 7,085.00 22,665.00
Harga per satuan pekerjaan dibulatkan 22,665.00

15.a. Memasang 1 buah grendel K.6.-3#3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Grendel bh 1.0000 5,580.00 5,580.00
Tenaga Kerja :
Pekerja oh 0.0069 31,500.00 217.35
Tukang Kayu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0002 63,000.00 12.60
0.1171 5,580.00 6,259.95 11,839.95
Harga per satuan pekerjaan dibulatkan 11,839.00

16. Memasang 1 m2 kaca tebal 3 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaca 3 mm m2 1.1000 70,875.00 77,962.50
Tenaga Kerja :
Pekerja oh 0.1600 31,500.00 5,040.00
Tukang Kayu oh 0.1600 54,000.00 8,640.00
Kepala Tukang oh 0.0160 63,000.00 1,008.00
Mandor oh 0.0080 63,000.00 504.00
0.3440 77,962.50 15,192.00 93,154.50
Harga per satuan pekerjaan dibulatkan 93,154.00

17. Memasang 1 m2 kaca tebal 5 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaca 5 mm m2 1.1000 86,940.00 95,634.00
Tenaga Kerja :
Pekerja oh 0.1600 31,500.00 5,040.00
Tukang Kayu oh 0.1600 54,000.00 8,640.00
Kepala Tukang oh 0.0160 63,000.00 1,008.00
Mandor oh 0.0080 63,000.00 504.00
0.3440 95,634.00 15,192.00 110,826.00
Harga per satuan pekerjaan dibulatkan 110,826.00

17.a. Memasang 1 m2 kaca rayband tebal 5 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kaca Rayband 5 mm m2 1.1000 112,500.00 123,750.00
Tenaga Kerja :
Pekerja oh 0.1600 31,500.00 5,040.00
Tukang Kayu oh 0.1600 54,000.00 8,640.00
Kepala Tukang oh 0.0160 63,000.00 1,008.00
Mandor oh 0.0080 63,000.00 504.00
0.3440 123,750.00 15,192.00 138,942.00
Harga per satuan pekerjaan dibulatkan 138,942.00
F.6 2. Bh 97,830.00

F.6 4. Bh 234,810.00

F.6 5. Bh 17,491.00

F.6 6. Bh 10,426.00

F.6 9. Bh 10,876.00
F.6 11. Bh 179,163.00

F.6 12. Bh 118,012.00

F.6 12.a Bh 111,262.00

F.6 13. Bh 21,226.00

F.6 15. Bh 18,152.00

F.6 15b. Bh 223,210.00


F.6 15c. Bh 22,665.00

F.6 15.a. Bh 11,839.00

F.6 16. M2 93,154.00

F.6 17. M2 110,826.00

F.6 17.a. M2 138,942.00


L.6. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING L.6.-1#3

3. Memasang per 1 m2 lantai ubin PC abu-abu ukuran (20 x 20) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Ubin Abu-abu bh 26.5000 2,655.00 70,357.50
PC kg 10.4000 1,269.00 13,197.60
Pasir Pasang m3 0.0450 104,850.00 4,718.25
Tenaga Kerja :
Pekerja oh 0.2700 31,500.00 8,505.00
Tukang Batu oh 0.1350 54,000.00 7,290.00
Kepala Tukang oh 0.0140 63,000.00 882.00
Mandor oh 0.0140 63,000.00 882.00
0.4330 88,273.35 17,559.00 105,832.35
Harga per satuan pekerjaan dibulatkan 105,832.00

6. Memasang per 1 m2 lantai ubin warna ukuran (20 x 20) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Ubin Warna bh 26.5000 2,925.00 77,512.50
PC kg 10.4000 1,269.00 13,197.60
Pasir Pasang m3 0.0450 104,850.00 4,718.25
Semen Warna kg 1.6200 4,950.00 8,019.00
Tenaga Kerja :
Pekerja oh 0.2700 31,500.00 8,505.00
Tukang Batu oh 0.1350 54,000.00 7,290.00
Kepala Tukang oh 0.0140 63,000.00 882.00
Mandor oh 0.0140 63,000.00 882.00
0.4330 103,447.35 17,559.00 121,006.35
Harga per satuan pekerjaan dibulatkan 121,006.00

16. Memasang per 1 m' plint ubin PC abu-abu ukuran (15 x 20) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Plint Ubin bh 5.3000 1,350.00 7,155.00
PC kg 1.6500 1,269.00 2,093.85
Pasir Pasang m3 0.0040 104,850.00 419.40
Tenaga Kerja :
Pekerja oh 0.0900 31,500.00 2,835.00
Tukang Batu oh 0.0900 54,000.00 4,860.00
Kepala Tukang oh 0.0090 63,000.00 567.00
Mandor oh 0.0050 63,000.00 315.00
0.1940 9,668.25 8,577.00 18,245.25
Harga per satuan pekerjaan dibulatkan 18,245.00

19. Memasang per 1 m' plint ubin PC warna ukuran (15 x 20) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Plint Ubin Warna bh 5.3000 1,575.00 8,347.50
PC kg 1.1400 1,269.00 1,446.66
Pasir Pasang m3 0.0030 104,850.00 314.55
Semen Warna kg 0.1000 4,950.00 495.00
Tenaga Kerja :
Pekerja oh 0.0900 31,500.00 2,835.00
Tukang Batu oh 0.0900 54,000.00 4,860.00
Kepala Tukang oh 0.0090 63,000.00 567.00
Mandor oh 0.0050 63,000.00 315.00
0.1940 10,603.71 8,577.00 19,180.71
Harga per satuan pekerjaan dibulatkan 19,180.00

34.a. Memasang per 1 m2 lantai keramik ukuran (40 x 40) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Ubin Keramik m2 1.0500 50,085.00 52,589.25
PC kg 8.1900 1,269.00 10,393.11
Pasir Pasang m3 0.0450 104,850.00 4,718.25
Semen Warna kg 1.6200 4,950.00 8,019.00
Tenaga Kerja :
Pekerja oh 0.7000 31,500.00 22,050.00
Tukang Batu oh 0.3500 54,000.00 18,900.00
Kepala Tukang oh 0.0350 63,000.00 2,205.00
Mandor oh 0.0350 63,000.00 2,205.00
1.1200 75,719.61 45,360.00 121,079.61
Harga per satuan pekerjaan dibulatkan 121,079.00

35. Memasang per 1 m2 lantai keramik ukuran (30 x 30) cm L.6.-2#3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Ubin Keramik m2 1.0500 38,700.00 40,635.00
PC kg 10.0000 1,269.00 12,690.00
Pasir Pasang m3 0.0450 104,850.00 4,718.25
Semen Warna kg 1.5000 4,950.00 7,425.00
Tenaga Kerja :
Pekerja oh 0.7000 31,500.00 22,050.00
Tukang Batu oh 0.3500 54,000.00 18,900.00
Kepala Tukang oh 0.0350 63,000.00 2,205.00
Mandor oh 0.0350 63,000.00 2,205.00
1.1200 65,468.25 45,360.00 110,828.25
Harga per satuan pekerjaan dibulatkan 110,828.00

36. Memasang per 1 m2 lantai keramik ukuran (20 x 20) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Ubin Keramik m2 1.0500 36,855.00 38,697.75
PC kg 10.4000 1,269.00 13,197.60
Pasir Pasang m3 0.0450 104,850.00 4,718.25
Semen Warna kg 1.6200 4,950.00 8,019.00
Tenaga Kerja :
Pekerja oh 0.7000 31,500.00 22,050.00
Tukang Batu oh 0.3500 54,000.00 18,900.00
Kepala Tukang oh 0.0350 63,000.00 2,205.00
Mandor oh 0.0350 63,000.00 2,205.00
1.1200 64,632.60 45,360.00 109,992.60
Harga per satuan pekerjaan dibulatkan 109,992.00

39. Memasang per 1 m' plint keramik ukuran (10 x 20) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Plint Keramik Artistik bh 5.3000 1,474.20 7,813.26
PC kg 1.1400 1,269.00 1,446.66
Pasir Pasang m3 0.0030 104,850.00 314.55
Semen Warna kg 0.0250 4,950.00 123.75
Tenaga Kerja :
Pekerja oh 0.0900 31,500.00 2,835.00
Tukang Batu oh 0.0900 54,000.00 4,860.00
Kepala Tukang oh 0.0090 63,000.00 567.00
Mandor oh 0.0050 63,000.00 315.00
0.1940 9,698.22 8,577.00 18,275.22
Harga per satuan pekerjaan dibulatkan 18,275.00

44. Memasang per 1 m2 lantai karpet

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Karpet m2 1.0500 27,900.00 29,295.00
Lem kg 0.3500 13,500.00 4,725.00
Tenaga Kerja :
Pekerja oh 0.1700 31,500.00 5,355.00
Tukang Kayu oh 0.1700 54,000.00 9,180.00
Kepala Tukang oh 0.0170 63,000.00 1,071.00
Mandor oh 0.0090 63,000.00 567.00
0.3660 34,020.00 16,173.00 50,193.00
Harga per satuan pekerjaan dibulatkan 50,193.00

48 Memasang per 1 m2 dinding porselen ukuran (11 x 11) cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Porselen m2 1.0500 58,500.00 61,425.00
PC kg 9.3000 1,269.00 11,801.70
Pasir Pasang m3 0.0180 104,850.00 1,887.30
Semen Warna kg 1.5000 4,950.00 7,425.00
Tenaga Kerja :
Pekerja oh 1.0000 31,500.00 31,500.00
Tukang Batu oh 0.5000 54,000.00 27,000.00
Kepala Tukang oh 0.0500 63,000.00 3,150.00
Mandor oh 0.0500 63,000.00 3,150.00
1.6000 82,539.00 64,800.00 147,339.00
Harga per satuan pekerjaan dibulatkan 147,339.00

50. Memasang per 1 m2 dinding porselen ukuran (20 x 25) cm L.6.-3#3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Porselen m2 1.0500 47,250.00 49,612.50
PC kg 9.3000 1,269.00 11,801.70
Pasir Pasang m3 0.0180 104,850.00 1,887.30
Semen Warna kg 1.9400 4,950.00 9,603.00
Tenaga Kerja :
Pekerja oh 0.9000 31,500.00 28,350.00
Tukang Batu oh 0.4500 54,000.00 24,300.00
Kepala Tukang oh 0.0450 63,000.00 2,835.00
Mandor oh 0.0450 63,000.00 2,835.00
1.4400 72,904.50 58,320.00 131,224.50
Harga per satuan pekerjaan dibulatkan 131,224.00

57. Memasang per 1 m2 dinding batu paras

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Batu Paras m2 1.1000 83,700.00 92,070.00
PC kg 11.7500 1,269.00 14,910.75
Pasir Pasang m3 0.0350 104,850.00 3,669.75
Tenaga Kerja :
Pekerja oh 0.7000 31,500.00 22,050.00
Tukang Batu oh 0.3500 54,000.00 18,900.00
Kepala Tukang oh 0.0350 63,000.00 2,205.00
Mandor oh 0.0350 63,000.00 2,205.00
1.1200 110,650.50 45,360.00 156,010.50
Harga per satuan pekerjaan dibulatkan 156,010.00

58. Memasang per 1 m2 dinding batu tempel hitam

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Batu Tempel Hitam m2 1.1000 91,098.00 100,207.80
PC kg 11.7500 1,269.00 14,910.75
Pasir Pasang m3 0.0350 104,850.00 3,669.75
Tenaga Kerja :
Pekerja oh 0.7000 31,500.00 22,050.00
Tukang Batu oh 0.3500 54,000.00 18,900.00
Kepala Tukang oh 0.0350 63,000.00 2,205.00
Mandor oh 0.0350 63,000.00 2,205.00
1.1200 118,788.30 45,360.00 164,148.30
Harga per satuan pekerjaan dibulatkan 164,148.00

60. Memasang per 1 m2 wall paper, lebar 50 cm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Wall Paper m' 2.2000 19,800.00 43,560.00
Lem kg 0.2500 13,500.00 3,375.00
Tenaga Kerja :
Pekerja oh 0.3500 31,500.00 11,025.00
Tukang Kayu oh 0.1750 54,000.00 9,450.00
Kepala Tukang oh 0.0170 63,000.00 1,071.00
Mandor oh 0.0020 63,000.00 126.00
0.5440 46,935.00 21,672.00 68,607.00
Harga per satuan pekerjaan dibulatkan 68,607.00
F.6 3. M2 105,832.00

F.6 6. M2 121,006.35

F.6 16. M1 18,245.00

F.6 19. M1 19,180.00

F.6 34.a. M2 121,079.00


F.6 35. M2 110,828.00

F.6 36. M2 109,992.00

F.6 39. M1 18,275.00

F.6 44. M2 50,193.00

F.6 48 M2 147,339.00
F.6 50. M2 131,224.00

F.6 57. M2 156,010.00

F.6 58. M2 164,148.00

F.6 60. M2 68,607.00


M.6. HARGA SATUAN PEKERJAAN PENGECATAN M.6.-1#2

1. Mengikis/mengerok 1 m2 permukaan cat tembok/besi lama

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Soda Api kg 0.0500 17,100.00 855.00
Tenaga Kerja :
Pekerja oh 0.1500 31,500.00 4,725.00
Mandor oh 0.0080 63,000.00 504.00
0.1580 855.00 5,229.00 6,084.00
Harga per satuan pekerjaan dibulatkan 6,084.00

2. Mencuci 1 m2 bidang permukaan tembok/besi yang pernah dicat

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Sabun kg 0.0500 6,750.00 337.50
Tenaga Kerja :
Pekerja oh 0.0800 31,500.00 2,520.00
Mandor oh 0.0040 63,000.00 252.00
0.0840 337.50 2,772.00 3,109.50
Harga per satuan pekerjaan dibulatkan 3,109.00

7. Mengecat 1 m2 bidang kayu lama

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Plamir kg 0.1500 16,650.00 2,497.50
Cat Dasar kg 0.1700 53,100.00 9,027.00
Cat Penutup kg 0.1700 53,100.00 9,027.00
Tenaga Kerja :
Pekerja oh 0.0700 31,500.00 2,205.00
Tukang Cat oh 0.0750 54,000.00 4,050.00
Kepala Tukang oh 0.0075 63,000.00 472.50
Mandor oh 0.0025 63,000.00 157.50
0.1550 20,551.50 6,885.00 27,436.50
Harga per satuan pekerjaan dibulatkan 27,436.00

8. Mengecat 1 m2 bidang kayu baru (1 lapis plamir dan cat dasar, 2 lapis cat penutup)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Cat Meni kg 0.2000 16,425.00 3,285.00
Plamir kg 0.1500 16,650.00 2,497.50
Cat Dasar kg 0.1700 53,100.00 9,027.00
Cat Penutup (2 kali) kg 0.2600 53,100.00 13,806.00
Tenaga Kerja :
Pekerja oh 0.0700 31,500.00 2,205.00
Tukang Cat oh 0.0090 54,000.00 486.00
Kepala Tukang oh 0.0060 63,000.00 378.00
Mandor oh 0.0025 63,000.00 157.50
0.0875 28,615.50 3,226.50 31,842.00
Harga per satuan pekerjaan dibulatkan 31,842.00

11. Melabur 1 m2 bidang kayu dengan politur

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Politur ltr 0.1500 22,050.00 3,307.50
Politur Jadi ltr 0.3720 40,500.00 15,066.00
Ampelas lbr 2.0000 4,410.00 8,820.00
Tenaga Kerja :
Pekerja oh 0.0000 31,500.00 0.00
Tukang Cat oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0160 63,000.00 1,008.00
Mandor oh 0.0025 63,000.00 157.50
0.0785 27,193.50 4,405.50 31,599.00
Harga per satuan pekerjaan dibulatkan 31,599.00
12. Melabur 1 m2 bidang kayu dengan residu/ter M.6.-2#2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Residu/Ter ltr 0.3500 1,260.00 441.00
Tenaga Kerja :
Pekerja oh 0.1000 31,500.00 3,150.00
Mandor oh 0.0060 63,000.00 378.00
0.1060 441.00 3,528.00 3,969.00
Harga per satuan pekerjaan dibulatkan 3,969.00

14. Mengecat 1 m2 bidang tembok baru dalam (1 lapis plamir dan cat dasar, 2 lapis cat penutup)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Plamir kg 0.1000 14,850.00 1,485.00
Cat Dasar kg 0.1000 22,500.00 2,250.00
Cat Penutup (2 kali) kg 0.2600 22,500.00 5,850.00
Tenaga Kerja :
Pekerja oh 0.0200 31,500.00 630.00
Tukang Cat oh 0.0630 54,000.00 3,402.00
Kepala Tukang oh 0.0063 63,000.00 396.90
Mandor oh 0.0025 63,000.00 157.50
0.0918 9,585.00 4,586.40 14,171.40
Harga per satuan pekerjaan dibulatkan 14,171.00

14.b Mengecat 1 m2 bidang tembok baru Luar (1 lapis plamir dan cat dasar, 2 lapis cat penutup)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Plamir kg 0.1000 14,850.00 1,485.00
Cat Dasar kg 0.1000 88,200.00 8,820.00
Cat Penutup (2 kali) kg 0.2600 88,200.00 22,932.00
Tenaga Kerja :
Pekerja oh 0.0200 31,500.00 630.00
Tukang Cat oh 0.0630 54,000.00 3,402.00
Kepala Tukang oh 0.0063 63,000.00 396.90
Mandor oh 0.0025 63,000.00 157.50
0.0918 33,237.00 4,586.40 37,823.40
Harga per satuan pekerjaan dibulatkan 37,823.00
15. Mengecat 1 m2 bidang tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Cat Dasar kg 0.1200 13,500.00 1,620.00
Cat Penutup (2 kali) kg 0.1800 13,500.00 2,430.00
Tenaga Kerja :
Pekerja oh 0.0600 31,500.00 1,890.00
Tukang Cat oh 0.0600 54,000.00 3,240.00
Kepala Tukang oh 0.0050 63,000.00 315.00
Mandor oh 0.0030 63,000.00 189.00
0.1280 4,050.00 5,634.00 9,684.00
Harga per satuan pekerjaan dibulatkan 9,684.00

20. Mengecat 1 m2 bidang permukaan baja dengan meni besi

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Meni Besi kg 0.1000 16,425.00 1,642.50
Kuas bh 0.0150 13,950.00 209.25
Tenaga Kerja :
Pekerja oh 0.0750 31,500.00 2,362.50
Tukang Cat oh 0.2000 54,000.00 10,800.00
Kepala Tukang oh 0.0200 63,000.00 1,260.00
Mandor oh 0.0040 63,000.00 252.00
0.2990 1,851.75 14,674.50 16,526.25
Harga per satuan pekerjaan dibulatkan 16,526.00

24. Mengecat 1 m2 bidang permukaan baja lapis seng (galbani) secara manual 3 lapis cat konvensional tebal 200 mm

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Cat Dasar kg 0.1100 16,425.00 1,806.75
Cat Antara kg 0.1700 53,100.00 9,027.00
Cat Penutup kg 0.0800 53,100.00 4,248.00
Tenaga Kerja :
Pekerja oh 0.5000 31,500.00 15,750.00
Tukang Cat oh 0.8000 54,000.00 43,200.00
Kepala Tukang oh 0.3000 63,000.00 18,900.00
Mandor oh 0.2000 63,000.00 12,600.00
1.8000 15,081.75 90,450.00 105,531.75
Harga per satuan pekerjaan dibulatkan 105,531.00

24a. Coating 1 m2 bidang Bidang Batu

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Vernis kg 0.1500 62,500.00 9,375.00
Kertas Gosok kg 0.1000 4,410.00 441.00
Kuas kg 0.0100 13,950.00 139.50
Tenaga Kerja :
Pekerja oh 0.1600 0.00 0.00
Tukang Cat oh 0.1600 40,500.00 6,480.00
Kepala Tukang oh 0.0160 36,000.00 576.00
Mandor oh 0.0025 54,000.00 135.00
0.3385 9,955.50 7,191.00 17,146.50
Harga per satuan pekerjaan dibulatkan 17,146.00
M.6 1. M2 6,084.00

M.6 2. M2 3,109.00

M.6 7. M2 27,436.00

M.6 8. M2 31,842.00

M.6 11. M2 31,599.00


M.6 12. M2 3,969.00

M.6 14. M2 14,171.00

M.6 14.b M2 37,823.00

M.6 15. M2 9,684.00

M.6 20. M2 16,526.00

M.6 24. M2 105,531.00


M.6 24a. M2 17,146.00
HARGA SATUAN PEKERJAAN LAIN-LAIN Ls.-1#5

B1+B2 Gebalan rumput per 1 m2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Rumput m2 1.0000 8,640.00 8,640.00
Tenaga Kerja :
Pekerja oh 0.1830 31,500.00 5,764.50
Mandor oh 0.0110 63,000.00 693.00
0.1940 8,640.00 6,457.50 15,097.50
Harga per satuan pekerjaan dibulatkan 15,097.00

L.5. Membongkar lantai per 1m2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 2.0000 31,500.00 63,000.00
Mandor oh 0.1000 63,000.00 6,300.00
2.1000 69,300.00 69,300.00
6,930.00
Harga per satuan pekerjaan dibulatkan 6,930.00

L.6. Membongkar plesteran per 1m2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.5000 31,500.00 15,750.00
Mandor oh 0.2500 63,000.00 15,750.00
0.7500 31,500.00 31,500.00
3,150.00
Harga per satuan pekerjaan dibulatkan 3,150.00

L.7. Membongkar genteng/atap sirap per 1m2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Mandor oh 0.1000 63,000.00 6,300.00
0.3000 12,600.00 12,600.00
1,260.00
Harga per satuan pekerjaan dibulatkan 1,260.00

L.9. Membongkar usuk/reng per 1m2

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Bongkar oh 0.2500 31,500.00 7,875.00
Kepala Tukang oh 0.0250 63,000.00 1,575.00
Mandor oh 0.1000 63,000.00 6,300.00
0.5750 22,050.00 22,050.00
2,205.00
Harga per satuan pekerjaan dibulatkan 2,205.00

L.13. Membongkar rangka/kuda-kuda per 1m3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks Total (Rp)
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)
Tenaga Kerja :
Pekerja oh 4.0000 31,500.00 126,000.00
Tukang Bongkar oh 6.0000 31,500.00 189,000.00
Kepala Tukang oh 0.6000 63,000.00 37,800.00
Mandor oh 0.2000 63,000.00 12,600.00
10.8000 365,400.00 365,400.00
Harga per satuan pekerjaan dibulatkan 365,400.00

Ls.1. Memasang 1 m2 paving blok warna

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Paving Blok Warna m2 1.0000 38,070.00 38,070.00
Pasir Pasang m3 0.0800 104,850.00 8,388.00
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0200 63,000.00 1,260.00
0.3300 46,458.00 13,590.00 60,048.00
Harga per satuan pekerjaan dibulatkan 60,048.00
Ls.2. Memasang 1 m2 paving blok abu-abu persegi K-200 Ls.-2#5

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Paving Blok Abu-abu persegi K-200 m2 1.0000 30,712.50 30,712.50
Pasir Pasang m3 0.0800 104,850.00 8,388.00
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0200 63,000.00 1,260.00
0.3300 39,100.50 13,590.00 52,690.50
Harga per satuan pekerjaan dibulatkan 52,690.00

Ls.3. Memasang 1 m2 paving blok abu-abu persegi K-300

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Paving Blok abu-abu persegi K-300 m2 1.0000 54,405.00 54,405.00
Pasir Pasang m3 0.0800 104,850.00 8,388.00
Sewa Alat Pemadatan m2 0.0600 2,500.00 150.00
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0200 63,000.00 1,260.00
0.3300 62,943.00 13,590.00 76,533.00
Harga per satuan pekerjaan dibulatkan 76,533.00

Ls.3a. Memasang 1 m2 paving blok hexagonal abu-abu (tebal paving 6 cm)

Uraian Satuan Indeks Harga Satuan Harga Satuan Jumlah Harga Satuan
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Paving Blok m2 1.0000 34,492.50 34,492.50
Pasir Pasang m3 0.0800 104,850.00 8,388.00
Sewa Alat Pemadatan m2 1.0000 2,500.00 2,500.00
Tenaga Kerja :
Pekerja oh 0.2000 31,500.00 6,300.00
Tukang Batu oh 0.1000 54,000.00 5,400.00
Kepala Tukang oh 0.0100 63,000.00 630.00
Mandor oh 0.0200 63,000.00 1,260.00
0.3300 45,380.50 13,590.00 58,970.50
Harga per satuan pekerjaan dibulatkan 58,970.00

Ls.4. Memasang 1 titik instalasi listrik

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Kabel m' 10.0000 2,880.00 28,800.00
Pipa PVC 1/2" m' 3.0000 5,940.00 17,820.00
T Dos PVC set 1.0000 7,290.00 7,290.00

Tenaga Kerja :
Pekerja oh 0.2400 31,500.00 7,560.00
Tukang Listrik oh 0.3200 54,000.00 17,280.00
Kepala Tukang oh 0.1600 63,000.00 10,080.00
Mandor oh 0.1200 63,000.00 7,560.00
0.8400 53,910.00 42,480.00 96,390.00
Harga per satuan pekerjaan dibulatkan 96,390.00

Ls.5. Memasang 1 bh skakelar tunggal

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Skakelar Tunggal bh 1.0000 14,850.00 14,850.00
Tenaga Kerja :
Tukang Listrik oh 0.0640 54,000.00 3,456.00
Mandor oh 0.0064 63,000.00 403.20
0.0704 14,850.00 3,859.20 18,709.20
Harga per satuan pekerjaan dibulatkan 18,709.00
Ls.6. Memasang 1 bh skakelar ganda Ls.-3#5

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Skakelar Ganda bh 1.0000 17,595.00 17,595.00
Tenaga Kerja :
Tukang Listrik oh 0.0640 54,000.00 3,456.00
Mandor oh 0.0064 63,000.00 403.20
0.0704 17,595.00 3,859.20 21,454.20
Harga per satuan pekerjaan dibulatkan 21,454.00

Ls.7. Memasang 1 bh stop kontak

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Stop Kontak bh 1.0000 12,600.00 12,600.00
Tenaga Kerja :
Tukang Listrik oh 0.0640 54,000.00 3,456.00
Mandor oh 0.0064 63,000.00 403.20
0.0704 12,600.00 3,859.20 16,459.20
Harga per satuan pekerjaan dibulatkan 16,459.00

Ls.8. Memasang 1 unit septictank bio filter kaps. 1 m3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Bio Filter 1 m3 unit 1.0000 2,745,000.00 2,745,000.00
Tenaga Kerja :
Pekerja oh 0.8000 31,500.00 25,200.00
Tukang Batu oh 1.6000 54,000.00 86,400.00
Kepala Tukang oh 0.2000 63,000.00 12,600.00
Mandor oh 0.0200 63,000.00 1,260.00
2.6200 2,745,000.00 125,460.00 2,870,460.00
Harga per satuan pekerjaan dibulatkan 2,870,460.00

Ls.9. Memasang 1 unit septictank bio filter kaps. 1,5 m3

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Bio Filter 1,5 m3 unit 1.0000 3,375,000.00 3,375,000.00
Tenaga Kerja :
Pekerja oh 0.8000 31,500.00 25,200.00
Tukang Batu oh 1.6000 54,000.00 86,400.00
Kepala Tukang oh 0.2000 63,000.00 12,600.00
Mandor oh 0.0200 63,000.00 1,260.00
2.6200 3,375,000.00 125,460.00 3,500,460.00
Harga per satuan pekerjaan dibulatkan 3,500,460.00

Ls.11. Memasang 1 m2 atap polycarbonate rangka stainless steel

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Polycarbonate + Rangka m2 1.0000 706,500.00 706,500.00
Tenaga Kerja :
Pekerja oh 0.7000 31,500.00 22,050.00
Tukang Besi oh 0.3500 54,000.00 18,900.00
Kepala Tukang oh 0.0350 63,000.00 2,205.00
Mandor oh 0.0700 63,000.00 4,410.00
1.1550 706,500.00 47,565.00 754,065.00
Harga per satuan pekerjaan dibulatkan 754,065.00
Ls.12. Memasang 1 m2 pagar besi Ls.-4#5

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pagar Besi m2 1.0000 427,500.00 427,500.00
PC kg 25.0000 1,269.00 31,725.00
Pasir Pasang m3 0.0500 104,850.00 5,242.50
Tenaga Kerja :
Pekerja oh 0.3056 31,500.00 9,626.40
Tukang Batu oh 0.3056 54,000.00 16,502.40
Kepala Tukang oh 0.0306 63,000.00 1,927.80
Mandor oh 0.0031 63,000.00 195.30
0.6449 464,467.50 28,251.90 492,719.40
Harga per satuan pekerjaan dibulatkan 492,719.00

Ls.13. Memasang 1 m2 pintu pagar besi

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Pintu Pagar Besi m2 1.0000 503,500.00 503,500.00
PC kg 2.0000 1,269.00 2,538.00
Pasir Pasang m3 0.0040 104,850.00 419.40
Tenaga Kerja :
Pekerja oh 0.2578 31,500.00 8,120.70
Tukang Batu oh 0.2578 54,000.00 13,921.20
Kepala Tukang oh 0.0258 63,000.00 1,625.40
Mandor oh 0.0026 63,000.00 163.80
0.5440 506,457.40 23,831.10 530,288.50
Harga per satuan pekerjaan dibulatkan 530,288.00

Ls.14. Memasang per 1 m2 dinding/lantai batu kerikil warna (ex. kupang) butiran dia 0,5 cm.

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Batu Kerikil ex. Kupang kg 12.3000 6,750.00 83,025.00
PC kg 4.2650 1,269.00 5,412.29
Pasir Pasang m3 0.0167 104,850.00 1,751.00
Tenaga Kerja :
Pekerja oh 0.8800 31,500.00 27,720.00
Tukang Batu oh 0.3400 54,000.00 18,360.00
Kepala Tukang oh 0.0340 63,000.00 2,142.00
Mandor oh 0.0440 63,000.00 2,772.00
1.2980 90,188.28 50,994.00 141,182.28
Harga per satuan pekerjaan dibulatkan 141,182.00

Ls.15.a. Memasang 1 m2 rangka atap baja ringan mutu tinggi model pelana/perisai sederhana sudut kemiringan 30 o bentang ≤ 08 m'

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Profil C 75.75 m' 3.2800 22,950.00 75,276.00
Reng m' 6.4500 13,500.00 87,075.00
Screw bh 26.0000 450.00 11,700.00
Dynabolt bh 1.0000 1,800.00 1,800.00
Tenaga Kerja :
Ongkos Pasang m2 1.0000 25,000.00 25,000.00
175,851.00 25,000.00 200,851.00
Harga per satuan pekerjaan dibulatkan 200,851.00

Ls.15.b. Memasang 1 m2 rangka atap baja ringan mutu tinggi model pelana/perisai sederhana sudut kemiringan 30 o bentang 10 s/d 16 m'.

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Profil C 75.100 m' 2.6600 30,330.00 80,677.80
Profil C 75.75 m' 2.7700 22,950.00 63,571.50
Reng m' 6.0900 13,500.00 82,215.00
Screw bh 25.0000 450.00 11,250.00
Dynabolt bh 0.3000 1,800.00 540.00
Plat Bracing m' 0.6000 6,750.00 4,050.00
Tenaga Kerja :
Ongkos Pasang m2 0.9000 25,000.00 22,500.00
242,304.30 22,500.00 264,804.30
Harga per satuan pekerjaan dibulatkan 264,804.00

Ls.15.c. Memasang 1 m2 rangka atap baja ringan mutu tinggi model pelana/perisai sederhana sudut kemiringan 30 o bentang > 16 m'. Ls.-5#5

Harga Satuan Harga Satuan Jumlah Harga Satuan


Uraian Satuan Indeks
Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)
Bahan :
Profil C 75.100 m' 3.6800 30,330.00 111,614.40
Profil C 75.75 m' 4.3700 22,950.00 100,291.50
Reng m' 5.9700 13,500.00 80,595.00
Screw bh 25.0000 450.00 11,250.00
Dynabolt bh 0.5000 1,800.00 900.00
Plat Bracing m' 0.4000 6,750.00 2,700.00
Tenaga Kerja :
Ongkos Pasang m2 0.9000 25,000.00 22,500.00
307,350.90 22,500.00 329,850.90
Harga per satuan pekerjaan dibulatkan 329,850.00
B1+B2 M2 15,097.00

L.5. M2 6,930.00

L.6. M2 3,150.00

L.7. M2 1,260.00

L.9. M2 2,205.00

L.13. M3 365,400.00

Ls.1. M2 60,048.00
Ls.2. M2 52,690.00

Ls.3. M2 76,533.00

Ls.3a. M2 58,970.00

Ls.4. Ttk 96,390.00

Ls.5. Bh 18,709.00
Ls.6. Bh 21,454.00

Ls.7. Bh 16,459.00

Ls.8. Unit 2,870,460.00

Ls.9. Unit 3,500,460.00

Ls.11. M2 754,065.00
Ls.12. M2 492,719.00

Ls.13. M2 530,288.00

Ls.14. M2 141,182.00

Ls.15.a. M2 200,851.00

Ls.15.b. M2 264,804.00
-0.30

Ls.15.c. M2 329,850.00

### 201600
PEMERINTAH KOTA KEDIRI
DINAS PEKERJAAN UMUM
HARGA SATUAN POKOK BARANG DAN JASA
(DAU) TAHUN ANGGARAN 2015

A. HARGA SATUAN BAHAN

No. URAIAN SAT. HARGA SATUAN

1 Pasir urug m3 45,360.00


2 Pasir pasang/Pasir beton m3 104,850.00
3 Pasir batu m3 100,350.00
4 Tanah urug m3 40,500.00
5 Tanah katel m3 44,415.00
6 Tanah sirtu m3 53,100.00
7 Batu bata merah kelas I bh 450.00
8 Kapur pasang m3 505,575.00
9 Ijuk kg 31,185.00
10 Semen PC (Gresik) @ 40 kg. zak 50,760.00
11 Semen putih kg 1,710.00
12 Semen berwarna kg 4,950.00
13 Semen merah m3 181,800.00
14 Batu pecah 20/20 cm. m3 146,475.00
15 Batu belah 15/20 cm. m3 151,200.00
16 Batu pecah 5/7 cm. m3 -
17 Batu pecah 4/6 cm. m3 129,150.00
18 Batu kali pecah 3/5 cm. m3 158,760.00
19 Batu cor/koral beton 2/3 cm. m3 181,800.00
20 Batu pecah 1/2 cm. m3 195,750.00
21 Batu pecah 0,5/1 cm. m3 225,666.00
22 Marmer bakar m2 100,710.00
23 Batu ampyang kemas kg 18,900.00
24 Batu kupang warna kg 6,750.00
25 Batu palimanan m2 83,700.00
26 Besi beton ulir kg 11,520.00
27 Besi beton polos kg 11,520.00
28 Kawat ikat beton kg 20,425.00
29 Besi beugel/baut 25 cm. f 12 mm. bj 12,169.50
30 Besi profil WF kg 10,455.00
31 Besi plat strip kg 13,157.50
32 Besi plat bordes 2,3 mm. lbr 997,500.00
33 Besi profil WF <= 200 mm. kg 16,150.00
34 Besi profil WF <= 200 mm. s/d 400 mm. kg 14,450.00
35 Besi siku L 30,30,3 mm. ljr 94,050.00
36 Besi siku L 40,40,4 mm. ljr 144,400.00
37 Besi siku L 60,60,6 mm. ljr 190,000.00
Door Closser Bh 216,125.00
Door Stopper Bh 15,580.00
38 Elektroda baja/kawat las baja (RB) kg 29,450.00
39 Kawat nyamuk kasa aluminium m2 23,750.00
40 Kawat duri pagar roll 168,150.00
41 Tiang pagar BRC 2" tinggi 1,5 m. btg 122,407.50
42 Pagar BRC 1,2x2,4 m. unit 346,750.00
43 Pintu dorong BRC 1,2x3,0 m. unit 1,282,500.00
44 Pintu swing ganda BRC 1,2x3,0 m. unit 1,187,500.00
46 Pagar besi komplit aksesoris m2 427,500.00
47 Pintu pagar besi komplit aksesoris m2 503,500.00
48 Pintu rolling door alumunium (Alexindo)/setara m2 503,500.00
49 Pintu harmonika m2 1,187,500.00
50 Kosen jendela polos aluminium (Alexindo)/setara m' 57,000.00
51 Kosen jendela alur aluminium (Alexindo)/setara m' 59,850.00
52 Kosen pintu polos aluminium (Alexindo)/setara m' 70,822.50
53 Kosen pintu alur aluminium (Alexindo)/setara m' 74,812.50
54 Karet kusen alumunium/profil kaca m' 1,995.00
55 Aluminium strip m' 8,075.00
56 Pipa hollow aluminium (1 x 3) cm m' 5,985.00
HSPBJ 2013/Dinas PU Kota Kediri/Hal. 1#6

No. URAIAN SAT. HARGA SATUAN


Hollow 40.40.2 m1 9,450.00
54 Sealant tube 33,075.00
55 Fixer skrup bh 360.00
56 Atap polycarbonat rangka stainless steel m2 706,500.00
57 Kayu dolken f 8-10 cm. bt 29,700.00
58 Kayu jati balok 8/12 cm. m3 25,200,000.00
59 Kayu jati usuk 5/7 cm. m3 15,750,000.00
60 Kayu jati reng 3/5 cm. m3 15,750,000.00
61 Kayu jati papan m3 25,200,000.00
62 Kayu kamper balok 8/12 cm. m3 8,910,000.00
63 Kayu kamper usuk 5/7 cm. m3 8,910,000.00
64 Kayu kamper reng 3/5 cm. m3 8,910,000.00
65 Kayu kamper papan m3 8,910,000.00
66 Kayu kruing balok 8/12 cm. m3 6,300,000.00
67 Kayu kruing usuk 5/7 cm. m3 6,300,000.00
68 Kayu kruing reng 3/5 cm. m3 6,300,000.00
69 Kayu kruing papan m3 6,300,000.00
70 Kayu meranti balok 8/12 cm. m3 4,410,000.00
71 Kayu meranti usuk 5/7 cm. m3 4,410,000.00
72 Kayu meranti reng 3/5 cm. m3 4,410,000.00
73 Kayu meranti papan m3 4,410,000.00
74 Kayu meranti bekisting m3 3,690,000.00
75 List kayu profil m' 2,970.00
76 Kayu bakar m3 103,500.00
77 Gedek guling m2 12,465.00
78 Bambu f 10-12 cm. pj. 6 m. bt 15,300.00
79 Teakwood 110x210x4 mm. lbr 83,700.00
80 Teakwood 122x244x4 mm. lbr 121,725.00
Teakwood 110x210x3 mm. lbr 67,500.00
81 Plywood 122x244x4 mm. lbr 73,350.00
82 Woodplank (20 x 400 x 1) cm lbr 54,000.00
83 Woodplank (30 x 400 x 1) cm lbr 95,220.00
84 Triplek 122x244x9 mm. lbr 139,860.00
85 Triplek 90x200x4 mm. lbr 44,685.00
87 Triplek 110x210x4 mm. lbr -
Triplek 120x240x6 mm. lbr 94,500.00
86 Triplek 120x240x4 mm. lbr 64,935.00
87 Triplek 122x244x4 mm. lbr 66,330.00
88 Eternit gresik m2 16,065.00
89 Asbes gelombang bsr. (3,05x1,05) tb. 5 mm setara Gresik lbr 103,950.00
90 Asbes gelombang kcl. (3,05x1,05) tb. 4 mm setara Gresik lbr 80,325.00
91 Asbes wuwung gelombang bsr. 5 mm. psg 27,405.00
92 Asbes wuwung gelombang kcl. 4 mm. psg 38,430.00
93 Seng gelombang BJLS 30 (1,8x0,9) m. lbr 71,460.00
94 Seng datar BJLS 30 (0,9x1,0) m. lbr 42,615.00
95 Genteng kodok (ex. Trenggalek) bj 2,025.00
96 Genteng wuwung kodok (ex. Trenggalek ) bj 4,500.00
97 Genteng press / mantili bj 2,475.00
98 Genteng wuwung press bj 4,230.00
99 Genteng beton bj 1,980.00
100 Genteng wuwung beton bj 3,870.00
101 Paku biasa kg 14,220.00
102 Paku pancing kg 20,700.00
103 Paku asbes/ulir bh 283.50
104 Paku seng payung bj 112.50
105 Paku sumbat bj 72.00
106 Paku skrup bh 315.00
107 Glass blok bh 18,000.00
108 Roster merah bh 3,780.00
109 Paving stone abu-abu persegi K-200 m2 30,712.50
110 Paving stone abu-abu segi enam tebal 6 cm. m2 34,492.50
111 Paving stone merah segi enam tebal 6 cm. m2 38,070.00
112 Paving stone abu-abu persegi K.300 m2 54,405.00
113 Tegel keramik uk. 20 x 20 cm. m2 36,855.00
114 Tegel keramik uk. 30 x 30 cm. m2 38,700.00
115 Tegel keramik uk. 40 x 40 cm. m2 50,085.00
116 Tegel keramik uk. 20 x 25 cm. m2 47,250.00
117 Uskup K-300 bj 2,970.00
118 Uskup K-200 bj 2,475.00
119 Buis beton f 15 cm. bh 45,024.30

HSPBJ 2013/Dinas PU Kota Kediri/Hal. 2#6

No. URAIAN SAT. HARGA SATUAN


120 Buis beton f 20 cm. bh 30,600.00
121 Buis beton f 30 cm. bh 45,000.00
123 Buis beton f 40 cm. bh 54,000.00
124 Buis beton f 50 cm. bh 63,000.00
125 Buis beton U 15 cm. bh 11,700.00
126 Buis beton U 20 cm. bh 15,300.00
127 Buis beton U 30 cm. bh 22,500.00
128 Buis beton U 40 cm. bh 27,000.00
129 Buis beton U 50 cm. bh 31,500.00
130 Pipa PVC 1/2" Maspion AW m' 5,940.00
131 Pipa PVC 3/4" Maspion AW m' 6,750.00
132 Pipa PVC 1" Maspion AW m' 8,550.00
133 Pipa PVC 1,5" Maspion AW m' 8,775.00
134 Pipa PVC 2" Maspion D m' 10,260.00
135 Pipa PVC 3" Maspion D m' 17,325.00
Pipa PVC 3" Maspion AW m' 24,750.00
136 Pipa PVC 4" Maspion D m' 24,075.00
Pipa PVC 4" Maspion AW m' 33,750.00
137 Pipa PVC 5" Maspion D m' 33,750.00
138 Keni PVC 1/2" bh 1,080.00
139 Keni PVC 3/4" bh 1,890.00
140 Keni PVC 2" bh 3,150.00
141 Keni PVC 3" bh 7,182.00
142 Keni PVC 4" bh 11,700.00
143 Keni PVC 5" bh 27,000.00
144 Klem pipa PVC bh 13,419.00
145 Tandon air fiberglass kap. 1100 ltr. (Pinguin) bh 1,456,434.00
146 Kaca polos tb. 3 mm. m2 70,875.00
147 Kaca polos tb. 5 mm. m2 86,940.00
148 Kaca ray band tb. 5 mm. m2 112,500.00
149 Kaca nako krepyak dan kerangka m2 315,000.00
150 Cat besi emco bintang kg 53,100.00
151 Cat kayu emco bintang kg 53,100.00
152 Cat meni cap pedang kg 16,425.00
153 Cat tembok (Decolith)/sejenis kg 13,500.00
Cat tembok (Vinilex)/sejenis kg 22,500.00
Cat tembok (mowilex)/sejenis kg 88,200.00
154 Cat plincute (Avian)/sejenis kg 36,000.00
155 Plamir tembok kg 14,850.00
156 Plamir kayu kg 16,650.00
157 Thinner B (minyak cat) lt 7,470.00
158 Politur lt 40,500.00
159 Lem (Rajawali) bks 11,250.00
160 Lem kayu (Fox) kg 13,500.00
161 Kertas gosok lbr 4,410.00
162 Engsel H stl 8,100.00
163 Engsel kuningan (Arch) stl 17,955.00
164 Grendel bh 5,580.00
165 Grendel kuningan/krom bh 10,350.00
166 Grendel tanam bh 25,785.00
167 Kunci gembok besar bh 28,620.00
168 Kunci gembok sedang bh 14,940.00
169 Kunci tanam 808 bh 9,720.00
170 Kunci tanam km/wc bh 33,795.00
171 Kunci tanam (Kuda Terbang) bh 61,020.00
172 Kunci selot bh 148,320.00
173 Handle Pintu stainless steel bh 103,500.00
174 Hak angin bj 4,500.00
175 Hak angin sikutan stl 18,900.00
176 Hak angin lurus (stel maju/mundur) stl 33,255.00
177 Selang spiral saluran kran set 41,760.00
178 Closet duduk porselin (monoblock) bh 1,152,000.00
179 Closet jongkok porselin (INA) bh 292,500.00
180 Kran air bh 22,500.00
Kran San-Ei type A286JC – PA286JC bh 58,500.00
181 TBA/isolasi rol 2,250.00
182 Wastafel besar bh 157,500.00
Washtafel ex TOTO tipe L548 bh 247,500.00
183 Watermur bh 14,175.00
184 Sifon wasser set 108,000.00
185 Floor drain bh 157,500.00
Floordrain ex Alinco 1990 ABS ball bh 247,500.00
186 Septictank Bio Filter Kapasitas 0,75 M3 bh 1,521,000.00

HSPBJ 2013/Dinas PU Kota Kediri/Hal. 3#6

No. URAIAN SAT. HARGA SATUAN

187 Septictank Bio Filter Kapasitas 1 M3 bh 2,745,000.00


188 Septictank Bio Filter Kapasitas 1,5 M3 bh 3,375,000.00
189 Septictank Bio Filter Kapasitas 2 M3 bh 4,140,000.00
190 Septictank Bio Filter Kapasitas 3 M3 bh 6,525,000.00
191 Septictank Bio Filter Kapasitas 4 M3 bh 18,540,000.00
192 Sumur peresap bh -
193 Sun Screen Besi Hollow Mdl. Bracing m2 337,500.00
194 Fitting plafon set 7,200.00
195 T dos PVC set 7,290.00
191 Isolator bh 4,500.00
192 Stop kontak (Broco) bh 12,600.00
193 Skakelar tunggal (Broco) bh 14,850.00
194 Zekering SPA 60 A bh 6,525.00
195 Panel box 290 x 30 cm bh 351,000.00
196 Lampu TL 20 W komplit (Philips) bh 50,400.00
197 Lampu Tl 40 W komplit (Philips) bh 90,720.00
198 Lampu pijar bh 3,870.00
199 Lampu SL 18 Watt bh 24,750.00
200 Lampu SL 23 Watt bh 35,325.00
201 Fitting lampu downlight bh 56,250.00
202 Pasang Zekering 4 Pas bh 337,500.00
-
199 Kabel NYA 500 V 1x2,5 mm. m' 2,880.00
200 Kabel NYA 450-750 V 1x1,5 mm. m' 3,150.00
201 Kabel NYA 450-750 V 1x2,5 mm. m' 3,375.00
202 Pompa air Nasional GP 125 JB l/dt bh 394,537.50
203 Pompa air Gold Star 10 KPOa 185 l/dt bh 1,071,000.00
204 Pompa tangan bh 297,202.50
205 Premium (industri) ltr 8,370.00
206 Minyak solar (industri) ltr 10,800.00
207 Minyak tanah (industri) ltr 11,025.00
208 Minyak bakar (industri) ltr 6,210.00
209 Olie (Meditran SX 15W/40)/setara ltr 35,100.00
210 Olie (Mesran Super)/setara ltr 27,877.50
211 Residu ltr 1,260.00
212 Minyak bekisting ltr 5,670.00
213 Thermoplast kg 54,315.00
214 Glass beads kg 19,890.00
215 Rumput taman m2 21,915.00
216 Rumput gebal m2 8,640.00
217 Bak mandi fiberglass bh 247,500.00
218 Bak cuci piring stainles steel bh 337,500.00
219 Sabun cream kg 6,750.00
220 Kuas 4" eterna bh 13,950.00
221 Pasang pintu KM/WC PVC unit 344,925.00
222 Pipa galvanis 1/2" (BSA) ljr 108,000.00
223 Pipa galvanis 3/4" (BSA) ljr 147,510.00
224 Pipa galvanis 1" (BSA) ljr 179,640.00
225 Pipa galvanis 1 1/4" (BSA) ljr 231,435.00
226 Pipa galvanis 1 1/2" (BSA) ljr 289,260.00
227 Pipa galvanis 2" (BSA) ljr 632,250.00
228 Pipa galvanis 2.5" (BSA) ljr 864,810.00
229 Pipa galvanis 3" (BSA) ljr 928,462.50
230 Pipa galvanis 4" (BSA) ljr 1,250,887.50
231 Batu candi m2 91,098.00
232 Roof light fiberglass 0.85 x 2.50 m. lbr 101,700.00
233 Skakelar ganda (Broco) bh 17,595.00
234 Soda api kg 17,100.00
235 Cerlak ltr 22,050.00
236 Gypsum board (120 x 240) cm tbl. 9 mm setara Elephant lbr 63,000.00
237 List gypsum profil 10 cm. m' 18,000.00
238 Urinoir bh 585,000.00
239 Door holder stel 220,500.00
240 Door stop bh 14,850.00
241 Kunci silinder bh 198,000.00
242 Nok genteng beton bh 8,100.00
243 Wallpaper lbr. 50 cm. (Contract Paper) m' 19,800.00
244 Porselin dinding 11 x 11 cm. m2 58,500.00
245 Karpet m2 27,900.00

HSPBJ 2013/Dinas PU Kota Kediri/Hal. 4#6

No. URAIAN SAT. HARGA SATUAN

246 Ubin PC abu-abu 20 x 20 cm. bh 2,655.00


247 Ubin PC warna 20 x 20 cm. bh 2,925.00
248 Plint ubin PC abu-abu 10 x 20 cm. bh 1,350.00
249 Plint ubin PC warna 10 x 20 cm. bh 1,575.00
250 Baja ringan mutu tinggi profil C 75.100 m' 30,330.00
251 Baja ringan mutu tinggi profil C 75.75 m' 22,950.00
252 Reng (batten) m' 13,500.00
253 Screw bh 450.00
254 Dynabolt bh 1,800.00
Baut Angkur Ø 16 mm bh 64,080.00
Baut Angkur Ø 8 mm bh -
255 Plat bracing m' 6,750.00
256 Aspal curah (AC 60-70) kg 1,800.00
257 Aspal drum kemas kg 9,000.00
258 Grease kg 58,500.00
259 Kawat galvanis kg 13,500.00
260 Tang pemotong kawat bh 17,100.00
261 Palu besar/bodem bh 58,500.00
262 Pisau besar bh 40,500.00
263 Keranjang bh 14,400.00
264 Gergaji bh 25,740.00
265 Ganco bh 49,500.00
266 Sabit besar bh 36,000.00
267 Kansteen 10.20.40 K-225 (terpasang) m' 42,750.00
268 Kansteen 15.25.40 K-225 (terpasang) m' 81,000.00
269 Kansteen 15.30.50 K-225 (terpasang) m' 79,200.00
270 Kansteen 18.30.60 K-225 (terpasang) m' 82,800.00
271 Keramik trotoar uk. 33,3 x 33,3 cm. m2 81,000.00
272 Keramik mozaik 80 x 80 cm. (terpasang) unit 673,560.00
273 Main Hole (cast iron) 70 x 70 cm. (terpasang) unit 1,185,030.00
274 Box Culvert U 150.150.120.15 cm. dan pcs 7,500,600.00
CU 150.20.120 cm. (terpasang) -
275 Selang Pemadam bh 3,195,000.00
276 Nozzle bh 8,100,000.00
277 Fire man Shirt bh 8,100,000.00
278 Sepatu Safeti bh 2,475,000.00
279 Helm Pemadam bh 6,750,000.00
280 "x" Conection bh 4,050,000.00
281 Lampu SL 23 watt bh 24,480.00
HSPBJ 2013/Dinas PU Kota Kediri/Hal. 5#6

B. HARGA SATUAN UPAH TENAGA KERJA

HARGA SATUAN
No. URAIAN SAT.
(Rp.)

1 Mandor org/hr 63,000.00


2 Kepala Tukang Batu org/hr 63,000.00
3 Kepala Tukang Kayu org/hr 63,000.00
4 Kepala Tukang Cat org/hr 63,000.00
5 Kepala Tukang Besi org/hr 63,000.00
6 Kepala Tukang Gali org/hr 63,000.00
7 Kepala Tukang Listrik org/hr 63,000.00
8 Kepala Tukang Pipa org/hr 63,000.00
9 Kepala Tukang Taman org/hr 63,000.00
10 Tukang Batu org/hr 54,000.00
11 Tukang Kayu org/hr 54,000.00
12 Tukang Cat org/hr 54,000.00
13 Tukang Gali org/hr 54,000.00
14 Tukang Besi org/hr 54,000.00
15 Tukang Politur org/hr 54,000.00
16 Tukang Aspal org/hr 54,000.00
17 Tukang Pipa org/hr 54,000.00
18 Tukang Listrik org/hr 54,000.00
19 Tukang Taman org/hr 54,000.00
20 Pembantu Tukang Batu org/hr 36,000.00
21 Pembantu Tukang Kayu org/hr 36,000.00
22 Pembantu Tukang Cat org/hr 36,000.00
23 Pembantu Tukang Besi org/hr 36,000.00
24 Pembantu Tukang Listrik org/hr 36,000.00
25 Pembantu Tukang Pipa org/hr 36,000.00
26 Tukang Bongkar org/hr 31,500.00
27 Pekerja/Buruh tak terampil org/hr 31,500.00
28 Buruh terampil org/hr 40,500.00
29 Pengemudi/Sopir org/hr 45,000.00
30 Pembantu Sopir org/hr 31,500.00
31 Masinis org/hr 45,000.00
32 Pembantu Masinis org/hr 31,500.00
33 Mekanik org/hr 45,000.00
34 Pembantu Mekanik org/hr 31,500.00
35 Operator org/hr 45,000.00
36 Pembantu Operator org/hr 31,500.00
37 Penjaga malam org/hr 45,000.00
38 Penjaga api org/hr 31,500.00
HSPBJ 2013/Dinas PU Kota Kediri/Hal. 6#6
Proyek :WSR 36 Madiun
Pekerjaan :bangunan kantor, mess, dan gudang
Lokasi : Madiun - Jawa Timur

NO URAIAN

A Pekerjaan Persiapan

B Pekerjaan Bongkaran

C Pekerjaan Galian & Urugan

D Pekerjaan Struktur Bawah

F Pekerjaan Struktur Atas & Atap

G Pekerjaan Dinding, Pasangan, Plesteran dan Acian

H Pekerjaan Lantai

I Pekerjaan Partisi

J Pekerjaan Kusen Pintu & Jendela

K Pekerjaan Plafond

L Pekerjaan Sanitair

M Pekerjaan Air Kotor

N Pekerjaan Air Hujan


O Pekerjaan Pengecatan

P Pekerjaan Lain – Lain

JUMLAH BOBOT TOTAL %


RENCANA PRESTASI PER MINGGU %
KOMULATIF RENCANA PRESTASI PER MINGGU %
DEVIASI ± %
JADWAL

BOBOT % 1 2 3 4 5 6

4.14 1.50 2.30 2.10 1.80

1.43 0.45 0.55

1.08 0.31

4.77 1.66

40.55 3.35

9.39

6.26

3.68

3.82

3.65

2.23 0.98

2.52

0.68
7.96

7.86

100.00
1.50 2.30 2.10 1.80 1.43 5.87
- 1.50 3.80 5.90 7.70 9.13 15.00
JADWAL PELAKSANAAN PEKERJAAN

7 8 9 10 11 12 13

0.43

0.56 0.21

2.10 1.01

5.00 5.00 5.00 5.00 4.00 13.20

2.60 3.20 2.40 1.19

1.70 2.50 2.06

1.50 1.90

1.96

1.10 1.40

0.87
8.09 6.22 7.60 8.20 8.10 19.49 8.19
23.09 29.31 36.91 45.11 53.21 72.70 80.89

1-Jun-15
150
29-Oct-15
14 15 16 17 18 19 20

0.28

1.86

1.15

0.38

1.36 1.16

0.68
1.30 2.40 2.50 1.76

2.50 1.50 1.90

6.32 4.24 2.50 1.76 2.50 1.50 1.90


87.21 91.45 93.95 95.70 98.20 99.70 101.60
21 22 SKALA KET

3.56

Jangka waktu
pelaksanaan
pekerjaan
selama 150
(Seratus Lima
Puluh) hari
kalender
1.90 0.06

1.90 3.50
103.50 100.00

Kediri, 12 Juni 2015


#REF!
CV. DARMA BAKTI

#REF!

Drs.SA'RONI
Direktur
JADWAL PELAKSANAAN PEKERJAAN
Proyek :WSR 36 Madiun
Pekerjaan :bangunan kantor, mess, dan gudang
Lokasi : Madiun - Jawa Timur

NO URAIAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 SKALA KET

Pekerjaan Persiapan

B Pekerjaan Bongkaran

C Pekerjaan Galian & Urugan

D Pekerjaan Struktur Bawah

F Pekerjaan Struktur Atas & Atap

G Pekerjaan Dinding, Pasangan, Plesteran dan Acian

H Pekerjaan Lantai Jangka waktu


pelaksanaan
I Pekerjaan Partisi pekerjaan
selama 150
(Seratus Lima
J Pekerjaan Kusen Pintu & Jendela Puluh) hari
kalender
K Pekerjaan Plafond

L Pekerjaan Sanitair

M Pekerjaan Air Kotor

N Pekerjaan Air Hujan

O Pekerjaan Pengecatan

P Pekerjaan Lain – Lain

JUMLAH BOBOT TOTAL %


RENCANA PRESTASI PER MINGGU % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KOMULATIF RENCANA PRESTASI PER MINGGU % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEVIASI ± %

MULAI
SELESAI
Kediri, 12 Juni 2015
#REF!
1-Jun-15 CV. DARMA BAKTI
150
29-Oct-15
#REF!

Drs.SA'RONI
Direktur
JADWAL PELAKSANAAN PEKERJAAN
Proyek :WSR 36 Madiun
Pekerjaan :bangunan kantor, mess, dan gudang
Lokasi : Madiun - Jawa Timur

NO URAIAN BOBOT % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 SKALA KET

A Pekerjaan Panel
A.1 Panel PP/LP 6.96 1.60 1.60 1.80 1.96

A.2 Panel Kontrol Genset (PK – G) 7.14 1.45 1.70 1.80 2.19

A.3 Pekerjaan Grounding Elektrikal maks.2 ohm (Panel & PK-G) 2.38 0.40 0.50 0.70 0.78

B Instalasi Penerangan & stop kontak 19.72 3.60 4.30 6.20 5.62

C Pekerjaan AC 16.42 3.50 4.20 4.00 4.72

D Pekerjaan Penyalur petir 4.07 0.95 0.95 1.10 1.07

D.1 Pekerjaan Grounding Elektrikal maks.2 ohm (Penangkal Petir) 1.98 0.20 0.35 0.55 0.88 Jangka waktu
Row 49
pelaksanaan
pekerjaan
E Pekerjaan Telephone 5.50 0.85 1.30 1.40 1.95 selama 150
(Seratus Lima
F Pekerjaan TV 3.33 0.45 0.60 0.90 1.38 Puluh) hari
kalender
G Pekerjaan Jaringan Komputer 1.71 0.45 0.45 0.81

H Pekerjaan APAR 0.09 0.04 0.05

I Pekerjaan Sistem Plumbing


i.1 Pekerjaan Sistem Plumbing 19.78 3.50 3.60 5.00 7.68

i.2 Instalasi Pipa Air GWT 1.66 0.35 0.50 0.81

i.3 Instalasi Distribusi Air 8.84 2.50 3.00 3.34

i.4 Instalasi Gas LPG 0.42 0.42

JUMLAH BOBOT TOTAL % 100.00


RENCANA PRESTASI PER MINGGU % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 3.05 7.50 13.01 15.74 17.25 12.73 10.07 11.49 3.81 3.75
KOMULATIF RENCANA PRESTASI PER MINGGU % - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 4.65 12.15 25.16 40.90 58.15 70.88 80.94 92.43 96.25 100.00
DEVIASI ± %

Kediri, 12 Juni 2015


#REF!
1-Jun-15 CV. DARMA BAKTI
150
29-Oct-15
#REF!

Drs.SA'RONI
Direktur
JADWAL PELAKSANAAN PEKERJAAN
Proyek :WSR 36 Madiun
Pekerjaan :bangunan kantor, mess, dan gudang
Lokasi : Madiun - Jawa Timur

NO URAIAN BOBOT % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 SKALA KET

A Pekerjaan Panel
A.1 Panel PP/LP 6.96 1.60 1.60 1.80 1.96

A.2 Panel Kontrol Genset (PK – G) 7.14 1.45 1.70 1.80 2.19

A.3 Pekerjaan Grounding Elektrikal maks.2 ohm (Panel & PK-G) 2.38 0.40 0.50 0.70 0.78

B Instalasi Penerangan & stop kontak 19.72 3.60 4.30 6.20 5.62

C Pekerjaan AC 16.42 3.50 4.20 4.00 4.72

D Pekerjaan Penyalur petir 4.07 0.95 0.95 1.10 1.07

D.1 Pekerjaan Grounding Elektrikal maks.2 ohm (Penangkal Petir) 1.98 0.20 0.35 0.55 0.88 Jangka waktu
pelaksanaan
pekerjaan
E Pekerjaan Telephone 5.50 0.85 1.30 1.40 1.95 selama 150
(Seratus Lima
F Pekerjaan TV 3.33 0.45 0.60 0.90 1.38 Puluh) hari
kalender
G Pekerjaan Jaringan Komputer 1.71 0.45 0.45 0.81

H Pekerjaan APAR 0.09 0.04 0.05

I Pekerjaan Sistem Plumbing


i.1 Pekerjaan Sistem Plumbing 19.78 3.50 3.60 5.00 7.68

i.2 Instalasi Pipa Air GWT 1.66 0.35 0.50 0.81

i.3 Instalasi Distribusi Air 8.84 2.50 3.00 3.34

i.4 Instalasi Gas LPG 0.42 0.42

JUMLAH BOBOT TOTAL % 100.00


RENCANA PRESTASI PER MINGGU % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 3.05 7.50 13.01 15.74 17.25 12.73 10.07 11.49 3.81 3.75
KOMULATIF RENCANA PRESTASI PER MINGGU % - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 4.65 12.15 25.16 40.90 58.15 70.88 80.94 92.43 96.25 100.00
DEVIASI ± %

MULAI
SELESAI Kediri, 12 Juni 2015
#REF!
1-Jun-15 CV. DARMA BAKTI
150
29-Oct-15
#REF!

Drs.SA'RONI
Direktur