Beruflich Dokumente
Kultur Dokumente
1 A 1
APR
A A A
DATE
A A
A
A A
PLAN PLAN
PLAN PLAN PLAN
DESCRIPTION
PLAN
A
A
2 2
SYMBOL
SUBMITTED BY:
FILE NO.:
DATE:
3 3
PREPARED BY:
SECTION-AA SECTION-AA
DWN BY:
CHK BY:
SECTION-AA SECTION-AA SECTION-AA SECTION-AA
US Army Corps
A A
A A A
4 4
PLAN A
PLAN A
PLAN A A PLAN
AL SEAL
FAX.NO: 4692727
TRAHDPENG CO. W.L.L.
CONTRACTING &
DOHA , QATAR
PLAN
PLAN
TEL.NO: 4689938
P.O.Box 3657
SECTION-AA SECTION-AA
5 5
SECTION-AA SECTION-AA
STATE OF QATAR
SHIELD 5
SECTION-AA
SECTION-AA
1 FWMH-1 TO FWMH 12
GENERAL NOTES:
1. ALL HDPEMENSIONS ARE IN METERS UNLESS STATED OTHERWISE.
6 2. ALL LEVELS AND COORHDPENATES ARE BASED ON QATAR NATIONAL 6
HEIGHT DATUM 95 (QNHD95)
3. ALL WORKS TO BE IN ACCORDANCE WITH THE QATAR CONSTRUCTION
STANDARDS (Q.C.S. 2014) ASGHAL STANDARD DETAIL AND THE
SHEET
PROJECT SPECIFICATIONS. REFERENCE
4. INSTALLATION OF FOUL WATER MANHOLE SHALL BE SUBMITTED NUMBER:
BY CIVIL TEAM.
5. FOR GRAVITY PIPE LINE, PIPE LENGTH IS MEASURED BETWEEN THE
CENTERLINE OF CORRESPONHDPENG MANHOLES.
A B C D E F G H
A B C D E F G H
A
FWMH-13 FWMH-14 FWMH-16 FWMH-17 FWMH-18 US Army Corps
FWMH-19
of Engineers
A
A
1 A A 1
APR
A A
A
DATE
A
PLAN PLAN
PLAN PLAN
PLAN PLAN
DESCRIPTION
2 2
SECTION-AA
SECTION-AA SECTION-AA
SECTION-AA SECTION-AA
SYMBOL
SECTION-AA
SUBMITTED BY:
A
FWMH-20 FWMH-21 FWMH-22 FWMH-23 FWMH-24 FWMH-25
FILE NO.:
DATE:
A A
A
3 A 3
A A
PREPARED BY:
A A
A
DWN BY:
CHK BY:
PLAN
A
PLAN
US Army Corps
SECTION-AA SECTION-AA
AL SEAL
FAX.NO: 4692727
TRAHDPENG CO. W.L.L.
CONTRACTING &
DOHA , QATAR
SECTION-AA
TEL.NO: 4689938
P.O.Box 3657
SECTION-AA
SECTION-AA SECTION-AA
DC-FS-01
5 5
STATE OF QATAR
SHIELD 5
A
PLAN
GENERAL NOTES:
1. ALL HDPEMENSIONS ARE IN METERS UNLESS STATED OTHERWISE.
6 2. ALL LEVELS AND COORHDPENATES ARE BASED ON QATAR NATIONAL 6
HEIGHT DATUM 95 (QNHD95)
3. ALL WORKS TO BE IN ACCORDANCE WITH THE QATAR CONSTRUCTION
STANDARDS (Q.C.S. 2014) ASGHAL STANDARD DETAIL AND THE
SHEET
PROJECT SPECIFICATIONS. REFERENCE
4. INSTALLATION OF FOUL WATER MANHOLE SHALL BE SUBMITTED NUMBER:
SECTION-AA BY CIVIL TEAM.
5. FOR GRAVITY PIPE LINE, PIPE LENGTH IS MEASURED BETWEEN THE
CENTERLINE OF CORRESPONHDPENG MANHOLES.
A B C D E F G H
A B C D E F G H
1 1
APR
A A
A A
A
DATE
A
A
A A A
A PLAN
PLAN PLAN PLAN
PLAN
PLAN
DESCRIPTION
2 2
SYMBOL
SECTION-AA
SUBMITTED BY:
FWMH-32 FWMH-33 FWMH-34 FWMH-35 FWMH-36 FWMH-37
FILE NO.:
A
DATE:
3 3
A A A
PREPARED BY:
A
A
A
DWN BY:
CHK BY:
A A
A A
PLAN
US Army Corps
of Engineers
4 4
AL SEAL
FAX.NO: 4692727
TRAHDPENG CO. W.L.L.
CONTRACTING &
DOHA , QATAR
SECTION-AA SECTION-AA SECTION-AA
TEL.NO: 4689938
P.O.Box 3657
SECTION-AA
5 5
SECTION-AA SECTION-AA
STATE OF QATAR
SHIELD 5
1 FWMH-26 TO FWMH 37
GENERAL NOTES:
1. ALL HDPEMENSIONS ARE IN METERS UNLESS STATED OTHERWISE.
6 2. ALL LEVELS AND COORHDPENATES ARE BASED ON QATAR NATIONAL
6
HEIGHT DATUM 95 (QNHD95)
3. ALL WORKS TO BE IN ACCORDANCE WITH THE QATAR CONSTRUCTION SHEET
STANDARDS (Q.C.S. 2014) ASGHAL STANDARD DETAIL AND THE
PROJECT SPECIFICATIONS.
REFERENCE
4. INSTALLATION OF FOUL WATER MANHOLE SHALL BE SUBMITTED NUMBER:
BY CIVIL TEAM.
5. FOR GRAVITY PIPE LINE, PIPE LENGTH IS MEASURED BETWEEN THE
CENTERLINE OF CORRESPONHDPENG MANHOLES.
A B C D E F G H
A B C D E F G H
US Army Corps
of Engineers
1 A 1
APR
A
A A
A
A A A
A
DATE
A A
PLAN PLAN
PLAN PLAN
A
PLAN
PLAN
DESCRIPTION
2 2
SYMBOL
SECTION-AA
SECTION-AA
SECTION-AA
SUBMITTED BY:
SECTION-AA
FILE NO.:
SECTION-AA
DATE:
3 3
PREPARED BY:
SECTION-AA
DWN BY:
CHK BY:
US Army Corps
of Engineers
A A
A
A
4 A A 4
A A PLAN
AL SEAL
FAX.NO: 4692727
TRAHDPENG CO. W.L.L.
CONTRACTING &
DOHA , QATAR
A
TEL.NO: 4689938
PLAN
P.O.Box 3657
PLAN PLAN
PLAN
PLAN
5 5
STATE OF QATAR
SHIELD 5
SECTION-AA SECTION-AA SECTION-AA SECTION-AA SECTION-AA
SECTION-AA
GENERAL NOTES:
1. ALL HDPEMENSIONS ARE IN METERS UNLESS STATED OTHERWISE.
6 2. ALL LEVELS AND COORHDPENATES ARE BASED ON QATAR NATIONAL 6
HEIGHT DATUM 95 (QNHD95)
3. ALL WORKS TO BE IN ACCORDANCE WITH THE QATAR CONSTRUCTION
STANDARDS (Q.C.S. 2014) ASGHAL STANDARD DETAIL AND THE
SHEET
PROJECT SPECIFICATIONS. REFERENCE
4. INSTALLATION OF FOUL WATER MANHOLE SHALL BE SUBMITTED NUMBER:
1 FWMH-38 TO FWMH 49 BY CIVIL TEAM.
5. FOR GRAVITY PIPE LINE, PIPE LENGTH IS MEASURED BETWEEN THE
CENTERLINE OF CORRESPONHDPENG MANHOLES.
A B C D E F G H
A B C D E F G H
US Army Corps
FWMH-50 FWMH-51 FWMH-52 FWMH-53 FWMH-54 FWMH-55 of Engineers
A
1 A 1
APR
A
A A
DATE
A
A
A
A A
PLAN PLAN
DESCRIPTION
A
PLAN PLAN
PLAN
PLAN
2 2
SYMBOL
SECTION-AA
SECTION-AA
SUBMITTED BY:
FILE NO.:
SECTION-AA
DATE:
SECTION-AA
3 SECTION-AA 3
SECTION-AA
PREPARED BY:
DWN BY:
CHK BY:
US Army Corps
AL SEAL
FAX.NO: 4692727
A
DOHA , QATAR
TEL.NO: 4689938
P.O.Box 3657
PLAN PLAN
5 5
STATE OF QATAR
SHIELD 5
1 FWMH-50 TO FWMH-57
SECTION-AA SECTION-AA
GENERAL NOTES:
1. ALL HDPEMENSIONS ARE IN METERS UNLESS STATED OTHERWISE.
6 2. ALL LEVELS AND COORHDPENATES ARE BASED ON QATAR NATIONAL 6
HEIGHT DATUM 95 (QNHD95)
3. ALL WORKS TO BE IN ACCORDANCE WITH THE QATAR CONSTRUCTION
STANDARDS (Q.C.S. 2014) ASGHAL STANDARD DETAIL AND THE
SHEET
PROJECT SPECIFICATIONS. REFERENCE
4. INSTALLATION OF FOUL WATER MANHOLE SHALL BE SUBMITTED NUMBER:
BY CIVIL TEAM.
5. FOR GRAVITY PIPE LINE, PIPE LENGTH IS MEASURED BETWEEN THE
CENTERLINE OF CORRESPONHDPENG MANHOLES.
A B C D E F G H