Beruflich Dokumente
Kultur Dokumente
darwin.bernardo@alc.sa
Table of contents
Al Ramaniah Commercial Building & Offices
Luminaire parts list.................................................................................................................................................................................................... 4
Views.........................................................................................................................................................................................................................6
Site 1
Results summary of surfaces............................................................................................................................................................................. 16
Parking Driveway / Horizontal illuminance..........................................................................................................................................................17
Parking Slot / Horizontal illuminance.................................................................................................................................................................. 18
Parking Slot / Horizontal illuminance.................................................................................................................................................................. 20
Parking Driveway / Horizontal illuminance..........................................................................................................................................................21
Parking Slot / Horizontal illuminance.................................................................................................................................................................. 22
Building Side / Horizontal illuminance.................................................................................................................................................................23
Rooftop / Horizontal illuminance......................................................................................................................................................................... 24
Rooftop / Horizontal illuminance......................................................................................................................................................................... 26
Building 2
Ground Floor
Corridor
Room summary..................................................................................................................................................................................... 28
Corridor
Room summary..................................................................................................................................................................................... 29
Staircase
Room summary..................................................................................................................................................................................... 30
Staircase
Room summary..................................................................................................................................................................................... 31
Results summary of surfaces................................................................................................................................................................ 32
Staircase
Room summary..................................................................................................................................................................................... 33
Results summary of surfaces................................................................................................................................................................ 34
First Floor
1 Office
Room summary..................................................................................................................................................................................... 35
1 Toilet
Room summary..................................................................................................................................................................................... 36
10 Office
Room summary..................................................................................................................................................................................... 37
10 Office
Room summary..................................................................................................................................................................................... 38
2 Office
Room summary..................................................................................................................................................................................... 39
2 Toilet
Room summary..................................................................................................................................................................................... 40
3 Office
Room summary..................................................................................................................................................................................... 41
3 Toilet
Room summary..................................................................................................................................................................................... 42
4 Office
Room summary..................................................................................................................................................................................... 43
4 Toilet
Room summary..................................................................................................................................................................................... 44
5 Office
Room summary..................................................................................................................................................................................... 45
5 Toilet
Room summary..................................................................................................................................................................................... 46
6 Office
Room summary..................................................................................................................................................................................... 47
6 Toilet
Room summary..................................................................................................................................................................................... 48
7 Office
Page 2
Al Ramaniah Commercial Building & Offices 2/28/2019
Room summary..................................................................................................................................................................................... 49
7 Toilet
Room summary..................................................................................................................................................................................... 50
8 Office
Room summary..................................................................................................................................................................................... 51
8 Toilet
Room summary..................................................................................................................................................................................... 52
9 Office
Room summary..................................................................................................................................................................................... 53
9 Office
Room summary..................................................................................................................................................................................... 54
Corridor
Room summary..................................................................................................................................................................................... 55
Corridor
Room summary..................................................................................................................................................................................... 56
Staircase
Room summary..................................................................................................................................................................................... 57
Results summary of surfaces................................................................................................................................................................ 58
Staircase
Room summary..................................................................................................................................................................................... 59
Results summary of surfaces................................................................................................................................................................ 60
Staircase
Room summary..................................................................................................................................................................................... 61
Results summary of surfaces................................................................................................................................................................ 62
Second Floor
11 Office
Room summary..................................................................................................................................................................................... 63
11 Toilet
Room summary..................................................................................................................................................................................... 64
12 Office
Room summary..................................................................................................................................................................................... 65
12 Toilet
Room summary..................................................................................................................................................................................... 66
13 Office
Room summary..................................................................................................................................................................................... 67
13 Toilet
Room summary..................................................................................................................................................................................... 68
14 Office
Room summary..................................................................................................................................................................................... 69
14 Toilet
Room summary..................................................................................................................................................................................... 70
Corridor
Room summary..................................................................................................................................................................................... 71
Corridor
Room summary..................................................................................................................................................................................... 72
Staircase
Room summary..................................................................................................................................................................................... 73
Staircase
Room summary..................................................................................................................................................................................... 74
Building 3
SEC
SEC RM
Room summary..................................................................................................................................................................................... 75
SEC RM
Room summary..................................................................................................................................................................................... 76
Page 3
Al Ramaniah Commercial Building & Offices 2/28/2019
Colorimetric data
1x: CCT 4000 K, CRI 80
Colorimetric data
1x: CCT 4000 K, CRI 80
Colorimetric data
1x: CCT 4000 K, CRI 80
Colorimetric data
1x: CCT 4000 K, CRI 80
Colorimetric data
1x: CCT 4000 K, CRI 80
Page 4
Al Ramaniah Commercial Building & Offices 2/28/2019
Colorimetric data
1x: CCT 4000 K, CRI 80
Colorimetric data
1x: CCT 4000 K, CRI 70
Colorimetric data
1x: CCT 4000 K, CRI 80
Colorimetric data
1x: CCT 5000 K, CRI 70
Total lamp luminous flux: 1407221 lm, Total luminaire luminous flux: 1407221 lm, Total Load: 12759.8 W, Luminous efficacy: 110.3 lm/W
Page 5
Al Ramaniah Commercial Building & Offices 2/28/2019
Site Render_01
Page 6
Al Ramaniah Commercial Building & Offices 2/28/2019
0.10 0.16 0.25 0.40 0.63 1.00 1.25 1.58 1.99 2.51 3.16 3.97 5.00 6.30 7.93
Page 7
Al Ramaniah Commercial Building & Offices 2/28/2019
Site Render_02
Page 8
Al Ramaniah Commercial Building & Offices 2/28/2019
0.10 0.16 0.25 0.40 0.63 1.00 1.25 1.58 1.99 2.51 3.16 3.97 5.00 6.30 7.93
Page 9
Al Ramaniah Commercial Building & Offices 2/28/2019
Page 10
Al Ramaniah Commercial Building & Offices 2/28/2019
0.10 0.16 0.25 0.40 0.63 1.00 1.25 1.58 1.99 2.51 3.16 3.97 5.00 6.30 7.93
Page 11
Al Ramaniah Commercial Building & Offices 2/28/2019
Page 12
Al Ramaniah Commercial Building & Offices 2/28/2019
0.10 0.16 0.25 0.40 0.63 1.00 1.25 1.58 1.99 2.51 3.16 3.97 5.00 6.30 7.93
Page 13
Al Ramaniah Commercial Building & Offices 2/28/2019
Page 14
Al Ramaniah Commercial Building & Offices 2/28/2019
0.10 0.16 0.25 0.40 0.63 1.00 1.25 1.58 1.99 2.51 3.16 3.97 5.00 6.30 7.93
Page 15
Al Ramaniah Commercial Building & Offices 2/28/2019
Site 1
General
Surface Result Average Min Max Min/average Min/max
1 Parking Driveway Horizontal illuminance [lx] 12.0 9.18 14.9 0.77 0.62
Height: 0.000 m
2 Parking Slot Horizontal illuminance [lx] 20.9 13.9 28.7 0.67 0.48
Height: 0.000 m
3 Parking Slot Horizontal illuminance [lx] 18.8 6.22 40.2 0.33 0.15
Height: 0.000 m
4 Parking Driveway Horizontal illuminance [lx] 11.9 3.49 44.1 0.29 0.079
Height: 0.000 m
5 Parking Slot Horizontal illuminance [lx] 28.1 8.40 59.5 0.30 0.14
Height: 0.000 m
6 Building Side Horizontal illuminance [lx] 20.4 0.000 41.3 0.00 0.00
Height: 0.000 m
Page 16
Al Ramaniah Commercial Building & Offices 2/28/2019
Scale: 1 : 500
Page 17
Al Ramaniah Commercial Building & Offices 2/28/2019
Page 18
Al Ramaniah Commercial Building & Offices 2/28/2019
Scale: 1 : 200
Page 19
Al Ramaniah Commercial Building & Offices 2/28/2019
Scale: 1 : 200
Page 20
Al Ramaniah Commercial Building & Offices 2/28/2019
Scale: 1 : 500
Page 21
Al Ramaniah Commercial Building & Offices 2/28/2019
Scale: 1 : 500
Page 22
Al Ramaniah Commercial Building & Offices 2/28/2019
Scale: 1 : 500
Page 23
Al Ramaniah Commercial Building & Offices 2/28/2019
Page 24
Al Ramaniah Commercial Building & Offices 2/28/2019
Scale: 1 : 100
Page 25
Al Ramaniah Commercial Building & Offices 2/28/2019
Page 26
Al Ramaniah Commercial Building & Offices 2/28/2019
Scale: 1 : 200
Page 27
Al Ramaniah Commercial Building & Offices 2/28/2019
Corridor
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (Corridor) Perpendicular illuminance (adaptive) [lx] 175 97.7 224 0.56 0.44
Height: 0.100 m, Wall zone: 0.000 m
Lighting power density: 3.49 W/m² = 1.99 W/m²/100 lx (Floor area of room 45.66 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 28
Al Ramaniah Commercial Building & Offices 2/28/2019
Corridor
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (Corridor) Perpendicular illuminance (adaptive) [lx] 172 99.1 212 0.58 0.47
Height: 0.100 m, Wall zone: 0.000 m
Lighting power density: 3.49 W/m² = 2.03 W/m²/100 lx (Floor area of room 45.66 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 29
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Lighting power density: 2.30 W/m² (Floor area of room 22.12 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 30
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 66.9%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Lighting power density: 1.85 W/m² (Floor area of room 13.75 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 31
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 66.9%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
General
Surface Result Average Min Max Min/average Min/max
Page 32
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Lighting power density: 0.00 W/m² (Floor area of room 13.68 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 33
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
General
Surface Result Average Min Max Min/average Min/max
Page 34
Al Ramaniah Commercial Building & Offices 2/28/2019
1 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (1 Office) Perpendicular illuminance (adaptive) [lx] 522 203 685 0.39 0.30
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.70 W/m² = 1.28 W/m²/100 lx (Floor area of room 86.67 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 35
Al Ramaniah Commercial Building & Offices 2/28/2019
1 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (1 Toilet) Perpendicular illuminance (adaptive) [lx] 232 77.6 408 0.33 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 36
Al Ramaniah Commercial Building & Offices 2/28/2019
10 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (10 Office) Perpendicular illuminance (adaptive) [lx] 523 191 687 0.37 0.28
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.70 W/m² = 1.28 W/m²/100 lx (Floor area of room 86.68 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 37
Al Ramaniah Commercial Building & Offices 2/28/2019
10 Office
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (10 Office) Perpendicular illuminance (adaptive) [lx] 232 76.4 408 0.33 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 38
Al Ramaniah Commercial Building & Offices 2/28/2019
2 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (2 Office) Perpendicular illuminance (adaptive) [lx] 492 174 653 0.35 0.27
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.44 W/m² = 1.31 W/m²/100 lx (Floor area of room 78.91 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 39
Al Ramaniah Commercial Building & Offices 2/28/2019
2 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (2 Toilet) Perpendicular illuminance (adaptive) [lx] 231 77.4 408 0.34 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 40
Al Ramaniah Commercial Building & Offices 2/28/2019
3 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (3 Office) Perpendicular illuminance (adaptive) [lx] 490 171 652 0.35 0.26
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.44 W/m² = 1.31 W/m²/100 lx (Floor area of room 78.91 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 41
Al Ramaniah Commercial Building & Offices 2/28/2019
3 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (3 Toilet) Perpendicular illuminance (adaptive) [lx] 232 77.4 407 0.33 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 42
Al Ramaniah Commercial Building & Offices 2/28/2019
4 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (4 Office) Perpendicular illuminance (adaptive) [lx] 457 172 603 0.38 0.29
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.64 W/m² = 1.45 W/m²/100 lx (Floor area of room 54.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 43
Al Ramaniah Commercial Building & Offices 2/28/2019
4 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (4 Toilet) Perpendicular illuminance (adaptive) [lx] 232 77.0 409 0.33 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 44
Al Ramaniah Commercial Building & Offices 2/28/2019
5 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (5 Office) Perpendicular illuminance (adaptive) [lx] 515 150 688 0.29 0.22
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 7.10 W/m² = 1.38 W/m²/100 lx (Floor area of room 86.89 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 45
Al Ramaniah Commercial Building & Offices 2/28/2019
5 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (5 Toilet) Perpendicular illuminance (adaptive) [lx] 241 85.1 410 0.35 0.21
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 4.12 W/m² = 1.71 W/m²/100 lx (Floor area of room 2.55 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 46
Al Ramaniah Commercial Building & Offices 2/28/2019
6 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (6 Office) Perpendicular illuminance (adaptive) [lx] 514 141 690 0.27 0.20
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 7.10 W/m² = 1.38 W/m²/100 lx (Floor area of room 86.89 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 47
Al Ramaniah Commercial Building & Offices 2/28/2019
6 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (6 Toilet) Perpendicular illuminance (adaptive) [lx] 241 87.9 409 0.36 0.21
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 4.12 W/m² = 1.71 W/m²/100 lx (Floor area of room 2.55 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 48
Al Ramaniah Commercial Building & Offices 2/28/2019
7 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (7 Office) Perpendicular illuminance (adaptive) [lx] 458 171 605 0.37 0.28
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.64 W/m² = 1.45 W/m²/100 lx (Floor area of room 54.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 49
Al Ramaniah Commercial Building & Offices 2/28/2019
7 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (7 Toilet) Perpendicular illuminance (adaptive) [lx] 231 76.6 408 0.33 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 50
Al Ramaniah Commercial Building & Offices 2/28/2019
8 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (8 Office) Perpendicular illuminance (adaptive) [lx] 492 175 651 0.36 0.27
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.44 W/m² = 1.31 W/m²/100 lx (Floor area of room 78.91 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 51
Al Ramaniah Commercial Building & Offices 2/28/2019
8 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (8 Toilet) Perpendicular illuminance (adaptive) [lx] 231 77.0 407 0.33 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 52
Al Ramaniah Commercial Building & Offices 2/28/2019
9 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (9 Office) Perpendicular illuminance (adaptive) [lx] 490 167 651 0.34 0.26
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.44 W/m² = 1.32 W/m²/100 lx (Floor area of room 78.91 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 53
Al Ramaniah Commercial Building & Offices 2/28/2019
9 Office
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (9 Office) Perpendicular illuminance (adaptive) [lx] 231 76.3 407 0.33 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 54
Al Ramaniah Commercial Building & Offices 2/28/2019
Corridor
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (Corridor) Perpendicular illuminance (adaptive) [lx] 159 83.4 258 0.52 0.32
Height: 0.100 m, Wall zone: 0.000 m
Lighting power density: 3.28 W/m² = 2.06 W/m²/100 lx (Floor area of room 97.16 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 55
Al Ramaniah Commercial Building & Offices 2/28/2019
Corridor
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (Corridor) Perpendicular illuminance (adaptive) [lx] 159 81.1 256 0.51 0.32
Height: 0.100 m, Wall zone: 0.000 m
Lighting power density: 3.28 W/m² = 2.06 W/m²/100 lx (Floor area of room 97.16 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 56
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Lighting power density: 4.59 W/m² (Floor area of room 22.13 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 57
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
General
Surface Result Average Min Max Min/average Min/max
Page 58
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Lighting power density: 3.71 W/m² (Floor area of room 13.68 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 59
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
General
Surface Result Average Min Max Min/average Min/max
Page 60
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 24.5%, Light loss factor: 0.80
Lighting power density: 5.54 W/m² (Floor area of room 13.75 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 61
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 24.5%, Light loss factor: 0.80
General
Surface Result Average Min Max Min/average Min/max
Page 62
Al Ramaniah Commercial Building & Offices 2/28/2019
11 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (11 Office) Perpendicular illuminance (adaptive) [lx] 513 141 680 0.27 0.21
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.21 W/m² = 1.21 W/m²/100 lx (Floor area of room 187.02 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 63
Al Ramaniah Commercial Building & Offices 2/28/2019
11 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (11 Toilet) Perpendicular illuminance (adaptive) [lx] 232 76.4 408 0.33 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 64
Al Ramaniah Commercial Building & Offices 2/28/2019
12 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (12 Office) Perpendicular illuminance (adaptive) [lx] 505 156 683 0.31 0.23
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.44 W/m² = 1.28 W/m²/100 lx (Floor area of room 112.68 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 65
Al Ramaniah Commercial Building & Offices 2/28/2019
12 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (12 Toilet) Perpendicular illuminance (adaptive) [lx] 291 137 430 0.47 0.32
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 5.83 W/m² = 2.01 W/m²/100 lx (Floor area of room 1.80 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 66
Al Ramaniah Commercial Building & Offices 2/28/2019
13 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (13 Office) Perpendicular illuminance (adaptive) [lx] 505 149 684 0.30 0.22
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.44 W/m² = 1.28 W/m²/100 lx (Floor area of room 112.68 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 67
Al Ramaniah Commercial Building & Offices 2/28/2019
13 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (13 Toilet) Perpendicular illuminance (adaptive) [lx] 290 134 429 0.46 0.31
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 5.83 W/m² = 2.01 W/m²/100 lx (Floor area of room 1.80 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 68
Al Ramaniah Commercial Building & Offices 2/28/2019
14 Office
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (14 Office) Perpendicular illuminance (adaptive) [lx] 513 139 679 0.27 0.20
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 6.21 W/m² = 1.21 W/m²/100 lx (Floor area of room 187.02 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 69
Al Ramaniah Commercial Building & Offices 2/28/2019
14 Toilet
Clearance height: 2.400 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (14 Toilet) Perpendicular illuminance (adaptive) [lx] 232 76.5 408 0.33 0.19
Height: 0.800 m, Wall zone: 0.000 m
Lighting power density: 3.89 W/m² = 1.68 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 70
Al Ramaniah Commercial Building & Offices 2/28/2019
Corridor
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (Corridor) Perpendicular illuminance (adaptive) [lx] 149 71.7 197 0.48 0.36
Height: 0.100 m, Wall zone: 0.000 m
Lighting power density: 3.25 W/m² = 2.19 W/m²/100 lx (Floor area of room 27.20 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 71
Al Ramaniah Commercial Building & Offices 2/28/2019
Corridor
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (Corridor) Perpendicular illuminance (adaptive) [lx] 147 75.1 196 0.51 0.38
Height: 0.100 m, Wall zone: 0.000 m
Lighting power density: 3.25 W/m² = 2.21 W/m²/100 lx (Floor area of room 27.20 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 72
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Lighting power density: 9.28 W/m² (Floor area of room 13.68 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 73
Al Ramaniah Commercial Building & Offices 2/28/2019
Staircase
Clearance height: 3.300 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Lighting power density: 9.28 W/m² (Floor area of room 13.68 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 74
Al Ramaniah Commercial Building & Offices 2/28/2019
SEC RM
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (SEC RM) Perpendicular illuminance (adaptive) [lx] 304 211 361 0.69 0.58
Height: 0.100 m, Wall zone: 0.000 m
Lighting power density: 9.67 W/m² = 3.19 W/m²/100 lx (Floor area of room 8.56 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 75
Al Ramaniah Commercial Building & Offices 2/28/2019
SEC RM
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Light loss factor: 0.80
Workplane
Surface Result Average Min Max Min/average Min/max
1 Workplane (SEC RM) Perpendicular illuminance (adaptive) [lx] 260 175 308 0.67 0.57
Height: 0.100 m, Wall zone: 0.000 m
Lighting power density: 7.52 W/m² = 2.89 W/m²/100 lx (Floor area of room 11.01 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 76