DC LOAD CALCULATION
Power
No. Feeder Type Function Model Manufacturer Remarks
Consumption (W)
1 400kV Control Diameter Panel
Control
1.1 Bay Control Unit (Main) REC 670 ABB 50x3=150 Fed from DC BUS 1
Diameter-1
Bay Control Mimic (Backup) BCM 800 ABB 5 Fed from DC BUS 1
Multifunction Meter Elite 440 SECURE 2x10=20 Fed from DC BUS 1
KV Meter 10 Fed from DC BUS 1
Ammeter RESHAB 3x5.5=16.5 Fed from DC BUS 1
Fed from DC BUS 1 & 2
Controlled Switch (PSD) PSD02 Siemens 15x3=45
(Change-over)
DC BUS 1 246.5
Total
DC BUS 2 45
Control
1.2 Bay Control Unit (Main) REC 670 ABB 50x3=150 Fed from DC BUS 1
Diameter-2
Bay Control Mimic (Backup) BCM 800 ABB 5 Fed from DC BUS 1
Multifunction Meter Elite 440 SECURE 2x10=20 Fed from DC BUS 1
KV Meter 10 Fed from DC BUS 1
Ammeter RESHAB 3x5.5=16.5 Fed from DC BUS 1
Fed from DC BUS 1 & 2
Controlled Switch (PSD) PSD02 Siemens 15x3=45
(Change-over)
DC BUS 1 246.5
Total
DC BUS 2 45
Control
1.3 Bay Control Unit (Main) REC 670 ABB 50x3=150 Fed from DC BUS 1
Diameter-3
Bay Control Mimic (Backup) BCM 800 ABB 5 Fed from DC BUS 1
Multifunction Meter Elite 440 SECURE 2x10=20 Fed from DC BUS 1
KV Meter 10 Fed from DC BUS 1
Ammeter RESHAB 3x5.5=16.5 Fed from DC BUS 1
Fed from DC BUS 1 & 2
Controlled Switch (PSD) PSD02 Siemens 15x3=45
(Change-over)
DC BUS 1 246.5
Total
DC BUS 2 45
Page 1 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
Control
1.4 Bay Control Unit (Main) REC 670 ABB 50x3=150 Fed from DC BUS 1
Diameter-4
Bay Control Mimic (Backup) BCM 800 ABB 5 Fed from DC BUS 1
Multifunction Meter Elite 440 SECURE 2x10=20 Fed from DC BUS 1
KV Meter 10 Fed from DC BUS 1
Ammeter RESHAB 3x5.5=16.5 Fed from DC BUS 1
Fed from DC BUS 1 & 2
Controlled Switch (PSD) PSD02 Siemens 15x3=45
(Change-over)
DC BUS 1 246.5
Total
DC BUS 2 45
DC BUS 1 59.6
Total
DC BUS 2 59.6
2.2 Gopalganj-2 Distance Protection (Main-1) REL 670 ABB 50 Fed from DC BUS 1
Differential Protection (Main-2) REL 670 ABB 50 Fed from DC BUS 2
Trip Coil Supervision 1 TSG 930 JUCKER 9.6 Fed from DC BUS 1
Trip Coil Supervision 2 TSG 930 JUCKER 9.6 Fed from DC BUS 2
DC BUS 1 59.6
Total
DC BUS 2 59.6
2.3 Meghnaghat-1 Distance Protection (Main-1) REL 670 ABB 50 Fed from DC BUS 1
Differential Protection (Main-2) REL 670 ABB 50 Fed from DC BUS 2
Trip Coil Supervision 1 TSG 930 JUCKER 9.6 Fed from DC BUS 1
Trip Coil Supervision 2 TSG 930 JUCKER 9.6 Fed from DC BUS 2
DC BUS 1 59.6
Total
DC BUS 2 59.6
2.4 Meghnaghat-2 Distance Protection (Main-1) REL 670 ABB 50 Fed from DC BUS 1
Differential Protection (Main-2) REL 670 ABB 50 Fed from DC BUS 2
Trip Coil Supervision 1 TSG 930 JUCKER 9.6 Fed from DC BUS 1
Trip Coil Supervision 2 TSG 930 JUCKER 9.6 Fed from DC BUS 2
DC BUS 1 59.6
Total
DC BUS 2 59.6
DC BUS 1 59.6
2.5 Future T/L Total
DC BUS 2 59.6
DC BUS 1 74.6
Total
DC BUS 2 59.6
Page 2 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
DC BUS 1 74.6
Total
DC BUS 2 59.6
DC BUS 1 74.6
Total
DC BUS 2 59.6
DC BUS 1 232
Total
DC BUS 2 232
DC BUS 1 232
Total
DC BUS 2 232
DC BUS 1 49
Total
DC BUS 2 49
Page 3 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
Tariff Meter
5.2 Gopalganj-1 Meter-Check Elster 7
Panel-Check
Gopalganj-2 Meter-Check Elster 7
Meghnaghat-1 Meter-Check Elster 7 Fed from DC BUS 1 & 2
Meghnaghat-2 Meter-Check Elster 7 (Change-over)
400/230/33kV ATR-1 Meter -Check Elster 7
400/230/33kV ATR-2 Meter -Check Elster 7
400/230/33kV ATR-3 Meter- Check Elster 7
DC BUS 1 49
Total
DC BUS 2 49
DC BUS 1 79
Total
DC BUS 2 24
DC BUS 1 79
Total
DC BUS 2 24
DC BUS 1 35
Total
DC BUS 2 35
8 Others
Fed from DC BUS 1 & 2
8.1 Emergency Light Main Control Room + SPR1 + SPR2 120+120=120=360
(Change-over)
DC BUS 1
Total
DC BUS 2
Page 4 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
AC LOAD CALCULATION
2)AC load
(𝐶ℎ𝑎𝑟𝑔𝑒𝑟 𝐼𝑛𝑝𝑢𝑡 𝑙𝑜𝑎𝑑)/
AC LOAD (𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
= ×𝑃𝑜𝑤𝑒𝑟 𝐹𝑎𝑐𝑡𝑜𝑟)
= 38.824 kVA
Here, Charger Input Current, I= 240
Charger Input Voltage, V= 110
Power Factor, Cosθ= 0.85
Efficiency, ŋ= 0.8
2)AC load
(𝐶ℎ𝑎𝑟𝑔𝑒𝑟 𝐼𝑛𝑝𝑢𝑡 𝑙𝑜𝑎𝑑)/
AC LOAD (𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
= ×𝑃𝑜𝑤𝑒𝑟 𝐹𝑎𝑐𝑡𝑜𝑟)
= 12.706 kVA
Here, Charger Input Current, I= 180
Charger Input Voltage, V= 48
Power Factor, Cosθ= 0.85
Efficiency, ŋ= 0.8
Page 5 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
Total 33787.4
Total 33787.4
Total 33787.4
Page 6 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
12 Sub-DCDB 1 1 104
Space Heater 1 200 0.50 1 100
Lamp 1 10 0.3 0.85 4
Page 7 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
13 Sub-DCDB 2 1 104
Space Heater 1 200 0.50 1 100
Lamp 1 10 0.3 0.85 4
Page 8 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
TOTAL 349176.6
NOTE: 1) Fire pump & oil treatment equipment will not be operatedat the same time
7 UPS 1 2809
Equipments 1 2300 1.00 0.85 2706
Space Heater 1 200 0.50 1 100
Lamp 1 10 0.3 0.85 4
TOTAL 212302.1
NOTE: 1) Fire pump & oil treatment equipment will not be operatedat the same time
Page 9 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
TOTAL 561.47873176
= 510.44 KVA
Page 10 of 10