It is to inform that the Sub-Committee has finalized the rates for the following
materials for the month of December - 2018 during the meeting held in the chambers of
Engineer-in-Chief (A.W./I.W.), Water Resources Department, Ramavarapadu,
Vijayawada on 27-12-2018. Hence all Superintending Engineers (PH) are requested to take
necessary action in the matter and to communicate the rates to all Executive Engineers
(PH)/Municipal Engineers under their respective jurisdiction for adoption for the month
of December - 2018. All the rates are Exclusive of all taxes.
ZAT4 NelloreTement and Steel monthly rates\December 2018 \finalized 2018 Steel Rates.docx
PH Items Rate per MT
P.C. drawn Wire / H.T.
Wire 3mm Rs.57,000/- (Rupees fifty seven thousand only)
P.C. drawn Steel wire /
8 Rs.56,000/- (Rupees fifty six thousand only)
H.T. Wire 4mm
9 H.R. Sheet in coils 1.6 mm
Rs.51,000/- (Rupees fifty one thousand Only)
H.R. Sheet in coils 2.0 mm
10 Rs.50,000/- (Rupees Fifty thousand only)
5.5/6.0 mm M.S. Wire rod
11 Rs.46,000/- (Rupees forty six thousand only)
Coil
Foundry Grade Pig Iron
12 Rs.35,000/- (Rupees thirty five thousand only)
(2.00 to 2.24)
Dr.Velapareddy Chandraiah
ENGINEER-IN-CHIEF (PH)(FAC)
To
All Superintending Engineers (PH)
Copy to Chief Engineer, GVMC & VMC for information
Copy to Executive Engineers I and II, 0/o EnC (PH) for information
Copy to Dy.E.EsT2, T3, T5, & T6 sections, 0/o EnC (PH) for information and
necessary action