Beruflich Dokumente
Kultur Dokumente
Revenue Tariff for Water Supply and Sanitation Services (Commercial) - Annex-II
Water Sewerage Water Conservancy Sewerage
Total Monthly
S. # Category Connection Connection Total Charges Per Charges Charges
User Charges
Fee Fee Month per Month per Month
Plaza
11 6,000 2,500 8,500 1,029 514 257 1,800
Temporary Water
14 560 280 140 980
Charges
Note:
1. The monthly water charges rates given in the table are for 1/2" dia water connection. For 3/4" dia and 1" dia water connection, monthly
water charges will be three times and five times higher than 1/2" dia water connection respectively.
3. Conservancy and sewerage / drainage charges are fixed @ 50% and 25% respectively of water charges per month.