1 R. Prasadarao 10002103
2 N. Ravikumar 10002378
3 BRK Rao 10004663
4 B. Raju 10005013
5 G. Ashok 10005728
6 KVSJ Raju 11004794
7 Ch Praveen kumar 10012323
1.1.2019 A
B
c
2.1.2019 A
3.1.2019
4.1.2019
5.1.2019
6.1.2019
7.1.2019
08.01.2019
09.01.2019
10.01.2019
G.Sudhakar
CT Code CT Name
a P. Linga murthy
b A.Panda
c P.V.V.Rao
d J.Someswara rao
e A.Meera swami
f M.Bhaskar
g K.N.Rao
h Haresh
i Mohan
j Laxmi Narayana
k R. Rama Rao
Job Description Remarks
GB501 N trip lever square block tightened & checked, instrumentation solenoid
removed,fixed after overhauling.
B filter over flow line steam jacketing lines flange leak arrested.
fire waer line renewal done 3" valve renewal done
GD 501 monthly pm checked.coupling guard and lub oil pump pad renewed.
GD 506 discarge tee blind removed and fixed after unplugging.
Fire header line welding fire header fixed at FB1903 A tank.
Pumping pit steam coil isolation vlave pipe line fabricated & fixed
GB 501N - Blower bearing hosuing & governor assembly removed & damaged
bearing replaced- Bearing 6310, Trip pin housing refixed, bearig housing cleaned &
spare parts removed one cleaned
GB 501N - trubine casing guard fabricated & welding to be done
FD 502C - filter end cover boxing up done
GB 501N - Governor & bearing housing cover(NDE) & couling fixed , Overhauling
job completed
JD 640 conveyor - Normalising job done
GB 501N - MOP fixed & lube oil lines fixed& rubber compund applied at leaky
portion
GD 501N - AOP pump trail run taken & checked for oil leaks in lube lines
GB 501N - suction manway open rotor cleaned & boxing up done
SAP-II - Sand filter manway open for operations inspection & boxing up done
GA 510 - Condensate line positioned and additional line fabrication work in
progress
ESI No Rate per man-day Overtime rate per hour Paid Holiday Rate per da
10263086
Paid Holiday Rate per day
SSK SK
838.74 1029.5
973.33 1175.17 Revised rates