INSPECTION REQUEST (IR)

Inspection Request Number : Date :

Client : PMC :

Contractor :
Name of the work :
Package No :
Name of
Work :

Area / Location of Reference


Inspection Dwg. No :

Inspection required at: Date : Time :


We request your attendence to inspect the following works :
(Desrciption)

Requested by
Project In-charge (Contractor) :
Date :
Works Ready for Inspection :
Contractor Representative Name Date Signature

Site/ Project Engineer

MEP Engineer

QA / QC Engineer

EHS

PMC Comments :
Approved
Approved with Corrective
Actions

Not Approved

Name & Signature of PMC rep. Name & Signature of CLIENT Rep.

Date : Date :
Receieved by the contractor

Signature Date :
Check List for Concrete, Formwork & Reinforcement (POUR CARD)
Pour Card Number : Date :

Client : PMC :

Contractor :
Name of the work :
Package No :
Name of
Work :
Area / Location of Inspection
Reference Drawing No and Rev No
Start Date & Time Completion Date & Time
Signature
Result
Sl. No Desrciption Contractor's PMC/ CLIENT
(OK/NA)
Rep.
All Method statement & Risk Assessment approved by
1 Concerened Dept

2 Check for location / level footing / column / beam / slab /


flooring completed as per relevant Dwgs

3 Check for reinforcement work done as per approved Bar Bending


Schedule & structural drawing.

4 Check for reinforcement work tied (with binding wire completed


as per drawing).

5 Check for MEP Inserts / conduits / cut outs etc. laid as per
drawing and approved by the departments.

6 Check for formwork laid to the correct dimensions including line,


level & plumb checked including form all

7 Check for sufficient length and number of re-bars dowels, if any,


laid for future / further extension works as per drawing.

8 Check for staging including bracing work completed properly.

9 Check reinforcement placed in correct position by placing cover


blocks / chairs / spacer bars etc.

10 Check for concrete top level marked at required places.

11 Check for concrete area cleared off nails, binding wire, wooden
wastes & taped with haevy duty tapes etc.

12 Check for sufficient number of vibrating & finishing items


available.

13 Check for safety protection like barricades / scaffolding


platform / lighting arrangements completed.

14 Check for availability of curing arrangements.

15 Check for required grade of concrete M -

16 Check for concrete placed and compacted in layers and finished


as per the requirements.

17 Total Concrete Quantity -


18 No. of Cubes taken & Identify No's
Remarks if any :
Name & Sign. Of Site Engg ( For Contractor) Name & Sign. Of PMC eng / CLIENT Rep.

Date : Date :
Remarks