Interior Finishes
C3020 Floor Finishes
PART 1 - GENERAL
1.01 OVERVIEW
A. Includes carpet, terrazzo, stone, resilient flooring, quarry tile, ceramic tile, concrete, and,
hardeners and sealers.
A. The following table indicates finishes for various room types within Owner’s facilities.
Confirm finishes with Owner’s Project Manager/Planner Designers
A. In addition to incorporating all applicable life safety and building code requirements,
provisions described within this Element shall be included within the Project Contract
Documents.
B. Where terrazzo is the scheduled finish for an area occupying more than one structural bay, a
“sand cushion” terrazzo system with depressed floor slab shall be utilized. Depressed slab
and all membranes/materials beneath the terrazzo shall be fully detailed. Confirm use of
sand cushion system with Owner’s Project Manager.
C. Indicate that flooring materials shall be installed using adhesives/products which are
recommended for use by the manufacturer. Require that shop drawing submittals for flooring
material include information on the proposed installation product(s) and substantiate that they
are as recommended for use by the manufacturer. Indicate that in cases where products
differ from those recommended by the manufacturer, the installer/contractor shall bear sole
responsibility for any resulting deficiencies.
D. Require that flooring materials be installed as late in the construction schedule as practical,
and be protected from damage from construction operations and placement of equipment
and fixtures during the remainder of the construction period. Require use of protection
methods recommended in writing by manufacturer and installer that ensure the flooring
material is without damage or deterioration at time of Substantial Completion.
E. Indicate that immediately prior to Substantial Completion inspections, resilient flooring (sheet
vinyl and vinyl composition tile) is to have a floor finish applied and be buffed/burnished as
recommended by the manufacturer to a level acceptable to Owner.
F. Schedule walk off carpet in lieu of using recessed mats at building entrances.
G. Select floor joint assemblies that are appropriate for expected traffic.
PART 4 - PRODUCTS
4.01 GENERAL
A. Obtain approval from Owner’s Project Manager/Planner Designer for all finish schedules prior
to issuance of Construction Documents.
B. For renovation projects, refer to Owner’s Master Construction Specifications and Interior
Finishes Standards. These are available on the Owner’s Design Guidelines website:
Construction Specifications - http://www2.mdanderson.org/depts/cpm/standards/specs.html
Interior Finish Standards - http://www2.mdanderson.org/depts/cpm/standards/interiors.html