TOTAL
B. Rubric for the Discussion on the Roles and Responsibilities of Each Group Member (Team Management)
Level of Achievement
Not satisfactory Satisfactory Very well done
CRITERIA Incorrect, unclear or Complete, correct and Complete, correct and goes
incomplete discussed beyond clear description
0 4 7
1. The role of each member is clearly defined. to to to
3 6 10
2. The responsibilities of the leader are 0 6 11
to to to
thoroughly enumerated
5 10 15
3. The responsibilities of the members are 0 6 11
to to to
enumerated
5 10 15
TOTAL
CRITERIA Excellent (max pts) Average (mid pts) Poor (lowest pts: 3) Points
Provides a detailed list of tasks Tasks are listed but could use more Task list is vague, incomplete, or too
Detailed
necessary to complete the design. Tasks detail. Key tasks may be omitted. closely associated with course
breakdown are specific to the project and deliverables to accurately describe and /10
of tasks encompass active design milestones as guide design work.
well as course deliverables.
Appropriate Timeline and time estimates are Timeline or time estimates Timeline or time estimates are
realistic and reflect course deadlines. occasionally veer from reality or unrealistic, inflated, or inaccurate.
timeline and
Timeline spans the length of project. are too closely tied to course Grader doubts project will track the /10
time deadlines. Team has not fully way the chart predicts.
estimates considered the entire span of time
necessary to complete its project.
The chart is up to date and The chart is not completely up to The chart is not up to date or
accurate. Adjustments have been date or accurate. Some items accurate. Items are out of date and
made when initial predictions fail projected for completion haven’t changed items have not been
Chart is up to map to reality. been, and the chart hasn’t been updated.
to date and adjusted to reflect the changes. /10
accurate
Chart answers the question: Chart does not adequately answer Chart has not been updated to
"What needs to get done the question: "What needs to get account for plan changes or delays.
between now and project end?” done between now and project
end?”
Provides specific accounting of the Provides specific accounting of the Fails to provide a meaningful
design effort for each task and for design effort, but may only cover one accounting of individual or team
Accounting
each team member during each time of the categories, omit some details, efforts.
for hours by period. Reports or provide totals that don’t match the
team reported values.
1) hours/team member/time /10
member by
period and 2) hours/team
time period
and task Member/task and totals for each
category are tallied.
TOTAL
TOTAL
Note:
A multidisciplinary approach involves drawing appropriately from multiple academic disciplines to redefine problems outside normal boundaries and
reach solutions based on a new understanding of complex situations.
The definition of Multidisciplinary: composed of or combining several usually separate branches of learning or fields of expertise