Sie sind auf Seite 1von 3

CORPORATE CENTRE ONE & TWO

13 01 0 M O R R I S R O A D

NEW TECH SUITES


TECH STATS
Robust and redundant fiber and
power infrastructure
600+ tech companies in the area
Over 25% of top tech employers
Source: http://growalpharetta.com/technology/

LOFT SPEC SUITES TO ENHANCE YOUR CULTURE!


CORPORATE CENTRE ONE
• Open loft/tech style build out
• Open ceiling plenum
• Exposed concrete
• Lounge style break rooms
• Collaborative space
KEY PLAN

Suite 100 – 4,599 RSF


Exist.
A13
Collaboration Office
111 110
A9

EXERCISE EXERCISE
ROOM ROOM
Exist.
Office
109

Copy/Print
C2
108
A14 IT Closet A6 A4
114 C4
C5
C8 A9 C7
D1 DW
A8 C4
Reception A7
100 A8
C1
A7 A9
A1
C3 A5 Open Office
A10 Open Office
107
113
A8
Break
A9 112
A10 Exist. Conference
106
A3 Typ.
C6 A2 Typ. Exist.
Office
Exist. Exist. Exist. 105
Office Office Office FE

102 103 104 A11


A12
Huddle
FIRE
PUMP
ROOM
MECHANICAL
ROOM

MAIL /
VENDING

101
ELECTRICAL
ROOM

1 Scope of Work: Demolition Plan 2 Scope of Work: Construction Plan


SW1
Suite 150 – 4,361 RSF
Scale: 1/8" = 1'-0" (If printed on 30 x 42)
SW1 Scale: 1/8" = 1'-0" (If printed on 30 x 42)
KEY PLAN

Demolition Plan Notes Construction Plan Notes Construction Plan Notes Price as Alternate Symbol Legend
Exist. Exist. Open A12
General: This document should only be used for preliminary pricing purposes as all specifications Furniture: All furniture shown is for representational purposes only and is to be provided by the Life Safety: Verify existing/provide new building standard Life Safety devices throughout area of GWB Header: Provide new 6" droppedOffice
Office GWB header, at all droppedOffice
ceiling areas adjacent to Collaboration Partition - Existing to Remain Conference
and clarifications have not been determined in relation to current as-built conditions. Contractor future Tenant. Future Tenant and/or Future Tenant's selected vendor are to confirm furniture demolition/construction, including emergency light fixtures, exit signage, fire horn/strobe devices 105with ceiling grid/tile with104
open ceiling, flush level 5 finish if open ceiling103
alternates are selected. 102 101
and fire extinguishers. Partition - New Construction A10
shall visit job site to become familiar with scope of work prior to submitting price. Contractor shall configuration and install per installation drawing provided by vendor to meet Future Tenant's needs
note all conditions that affect or shall be affected by the scope of work. Any discrepancies between and jurisdictional requirements. It is the sole responsibility of the Future Tenant and/or Future A1 - Modify entry/exit door to have new 1/4" thick clear tempered glass inset (6" top rail and
these conditions and the drawing and notes shall be reported to the Designer for clarification PRIOR Tenant's vendor to field verify conditions prior to providing furnishing to ensure feasibility of product Blinds: Contractor to clean all existing blinds at construction completion. Coordinate with stiles, 12" bottom rail). In lieu of existing hardware to remain, provide and install new building Partition - To be Removed
to submitting price. This suite has not been field verified by VeenendaalCave, Inc. selected. Construction Manager if any blinds need to be replaced. standard closer and lockset hardware.
Door - New C2 A4
Entry
Contact Derik Keel for access to the suite, 404.654.1263. C1 100 A1
Partition: Construct new interior partition where indicated by symbol; floor to underside of ceiling, A2 - Modify Office, A2 A2 new 1/4" thick clear tempered glass
Huddle, and Conference doors to have
Carpet: Provide and install new carpet throughout, unless otherwise noted. inset A3
(6" top rail and stiles, 12" bottom rail).
A3 Door - To be Removed
General Demolition - Remove existing interior partitions, millwork, finishes, and doors with typical. Construct new interior partitions floor to slab where exposed ceilings occur.
associated door stops where indicated; salvage doors for reuse where indicated and offer additional [Allowance: $15.00 sq/yd installed.]
to Landlord for building stock and coordinate for appropriate disposal. See Symbol Legend. Surface Preparation: Patch and repair all surfaces where demolition and/or new construction A3 - Provide new hollow metal frame unit with sidelight to match existing @ Huddle #101 and Key - Extent of Demolition/Floor Finish Transition
occurs and as needed throughout; prepare areas to receive new finishes. Existing Office #102. Provide bracing to structure as necessary. C3 A5
Paint: Provide and apply two (2) coats eggshell latex finish on all walls; allow for accent paint at
Power/Communication Devices: Remove all wiring associated with demolished/abandonded D1 Key - Note
30% of total wall surface area; two (2) coats semi-gloss latex finish on all h.m. frames. A4 - Provide and install new dual height waterfall island, one (1) 6'-3"W x 3'-0" D x 2'-10"H
devices back to its point of origin. Coordinate with Construction Manager's Low Voltage Vendor Switching: Provide and install new building standard occupancy switches throughout area of FE C7 A10
A8 A14
prior to removal for possible reuse. construction to match, if not already installed, unless noted otherwise. Utilize existing j-box and section and one (1) 6'-3"W x 3'-0"D x 3'-6"H section with 3/4" MDF clad plastic laminate counter Phone A13 - New Exposed Ceiling - Option A (see Alternate A11
Key Hatch #1 Note A7)
wiring where applicable. Confirm specification with Construction Manager prior to Rubber Base: Provide and install new 4" rubber base throughout. tops and waterfall edges @ Break #112; base to have (3) three 4" diameter stainless steel 108
support legs at center of each section as indicated on plan. Specification: Doug Mockett TL34R-4 -
C1 A6 Exist.
D1 - Remove millwork, sink, dishwasher and associated water heater where indicated; cap ordering. Copy/Print
D1
34-1/2" Table Leg, 4" Diameter; Satin Chrome Finish. Contact: Steve @ 800-523-1269 Storage/IT
plumbing flush with slab. Salvage sink, dishwasher, and water heater if feasible for reuse. 107 Key Hatch #2 - New Exposed Ceiling - Option B (see Alternate Note A8)
Transition Strip: Provide Tarkett Johnsonite Slim Line Transition SLT-XX-L Color to Match Carpet Break
111
Power/Communications: Existing power/communication outlets to remain throughout. C1 A6 Phone
@ LVT/concrete to carpet transitions.  Maximum transition 1/4" per ADA requirements. A5 - In lieu of plastic laminate countertops, provide and install solid surface countertops @ Break C6 109 110 C8
Provide new power/communication outlets to accommodate new partition layout. Each office/open
office/work area/reception to have a minimum of two duplexes and one voice/data outlet; common #112. [Allowance: $80.00/SF installed] Open C4 C5Concrete (see
Key Shade #1 - Exposed Polished A7 Alternate Note A9
A9)
A15
Office
areas to have minimum building standard requirements, all
copiers/printers/refrigerators/dishwashers/microwaves to be on dedicated outlet and GFI's to be
Construction Plan - Key Notes 106
A6 - In lieu of plastic laminate, provide and install solid surface countertops for dual height DW

provided at all wet areas, typical. C1 - Provide and install approximately 12'-6" of new plastic laminate base cabinets and 16'-2" waterfall island @ Break #112. [Allowance: $80.00/SF installed] Key Shade #2 - NIC
upper cabinets where indicated @ Break #112; construct of 3/4" MDF clad in plastic laminate
Existing/Relocated Doors: Existing doors to remain throughout, unless noted otherwise. with standard wire pulls; reuse salvaged stainless steel handicap accessible sink with new lever-type A7 - In lieu of existing suspended ceiling tile/grid @ Reception #100 and Break #112, expose
Touch up stain finish as needed. Verify existing hardware is in good working order. Repair/provide fixtures. Base cabinets to have one (1) adjustable shelf within and one (1) drawer above; provide ceiling at areas indicated by Key Hatch #1. Fog structure and systems above in all open areas.
new as needed. Verify existing/provide new lockset hardware at all offices, typical. openings for salvaged dishwasher (NIC); upper cabinets to have two (2) adjustable shelves within Top off existing and new partitions to structure above where plenum is exposed. Install
and shelf for Future Tenant provided microwave (NIC). Provide 2" backsplash and FRT within salvaged/new building standard 2'x4' fluorescent light fixtures; chain hung at exposed ceiling.
FIRE Entry/Exit Doors: Existing pair(s) of entry/exit door/frame to remain @ Elevator Lobby. partition as required. Provide and install new/relocated appropriately sized electric water heater for Modify sprinkler
FIREheads as required by code. See Symbol Legend.
PUMP Contractor to verify electric strike, card reader, and closer are in proper working condition; sink/dishwasher. Provide new hot and cold water lines as necessary to new plumbing location; PUMP
ROOM provide new as necessary. include all necessary fittings, drain lines, connections and accessories as required. A backflow A8 - In lieuROOM
of existing suspended ceiling tile/grid @ Open Offices #107, #113, and Break
MECHANICAL prevention device shall be installed to comply with all applicable parts of 2012 IPC Sections 608.3 #112, expose ceiling at areas indicated by Key Hatch #2. Fog structure and systems above in MECHANICAL
ROOM unless noted otherwise. Confirm
Existing Glazing: Existing glazing to remain throughout, and/or 608.16. all open areas. Top off existing and new partitions to structure above where plenum is exposed. ROOM
glazing is tempered and braced to structure above. Install salvaged/new building standard 2'x4' fluorescent light fixtures; chain hung at exposed
MAIL / C2 - Provide and install approximately 10'-2" of new plastic laminate base cabinets and 15'-7" of ceiling. Modify sprinkler heads as required by code. See Symbol Legend. MAIL /
VENDING Existing ceiling components to remain throughout, unless otherwise noted;
Ceilings/Lighting: new plastic laminate upper cabinets where indicated @ Copy/Print #108; construct of 3/4" MDF VENDING
relocate light fixtures as necessary where affected by demolition/construction; provide new building clad in plastic laminate with standard wire pulls. Base cabinets to have one (1) adjustable shelf A9 - In lieu of carpet and LVT throughout; provide exposed concrete where indicated by Key
ELECTRICAL within and upper cabinets to have two (2) adjustable shelves within. Provide 2" backsplash and Shade #1. Strip and prepare floor as necessary for new penetrating concrete sealer. Provide (1) ELECTRICAL
standard 2x4 fluorescent fixtures to accommodate minimum (1) per 100 sq. ft and (1) per 15 sq. ft
ROOM coat of concrete penetrating sealer with 20% solids for low sheen finish. See Symbol Legend. ROOM
at assembly. Patch and repair grid as necessary; replace any damaged or soiled tiles to match fire rated blocking within partition as required.
existing; clean, relamp, and reballast existing light fixtures as needed; provide new switches and
recircuit existing lighting as necessary for new partition layout. C3 - Provide and install FRT within partition for Future Tenant provided signage (NIC) @ A10 - Provide and install vinyl wallcovering inside corner to inside corner where indicated @
Reception #100. Coordinate exact location and all requirements with future Reception #100. Specification: Flat Iron Brick - Sandstone #L304503CD Contact: Maureen Blair @
Tenant. National Wallcovering, 678.603.3788
HVAC: Modify existing HVAC as required to provide proper heating, ventilation, and cooling per
new occupancy and equipment load (quantities NIC); test and balance HVAC for correct output C4 - Provide and install waterlines/drainlines for Future Tenant provided refrigerator with ice maker A11 - Provide and install new wall mounted cable outlet (TV box), duplex outlet (TV box) and data
responsibility of General Contractor. Provide and install new PIU boxes where needed to achieve outlet (TV box) @ Existing Conference #106 for Future Tenant provided flat screen TV (NIC).
CORPORATE CENTRE TWO
• Very unique opportunity for a full floor user to get a turnkey • Exposed concrete
loft/tech sytle suite • Collaboration areas
• Open plan highlighted by open ceiling plenum • Huddle rooms
• Feature lounge area

Suite 300 – 23,666 RSF

A6

Open Office
Huddle 310 Collaboration
309 C14 A17 C7 C14 A17 313
C11
C12
,Typ.

Collaboration Open Office


311 312

A11

Ex. Office Ex. Office Office Office


329 328 327 326 Open Office
314

Open Office Copy/Print Open Office


330 C6
325 315
C16
A3

Restrooms
Open Office Existing IT
308 324
C14 A17 C6 C11 C17 A10

Copy/Print Bldg. General


331 Elevator Lobby DW
C11 A15

A14 A14 Bldg. General C8 C3 C8 A5


A6 A9
A7 Lounge
332

A12 A6
C1
Open Office Huddle C4 Break C13 C5
302 318 Huddle 322
C14 A17
Reception C11 321 A5
Gaming
Collaboration 300 C11 323

Conference
319 C6
C1
C9
Copy/Work
A8
320

C1
C18
Ex. Office
307 A8
Open Office
C2 317
C15
A4 ,Typ. A13
C1 C1
C10

Ex. Office Ex. Office A1 Typ. Ex. Office Conference A2


306 305 304 303 C11
Collaborate
Conference 316
301 C14 A17
A6 A6
A7
A12

1 Construction Plan
SW-2 Scale: 1/8" = 1'-0" (If printed on 30" x 42")

et Notes Construction Sheet Notes Construction Plan - Notes Construction Sheet - Key Notes Price as Alternate Price as Alternate
Symbol Legend
or representational purposes only and is to be provided by the HVAC: Modify existing HVAC as required to provide proper heating, ventilation, and cooling per C3 - Provide and install approximately 14'-5" of new plastic laminate base and upper cabinets C11 - Relocate (8) eight salvaged 2' x 2' parabolic fixtures @ Conference #303; provide new to GWB Header: Provide new 6" dropped GWB header, at all areas adjacent to open ceiling, flush A9 - Provide and install lockers with FRT wood blocking within partition where indicated. Fur out
with ceiling grid/tile with level 5 finish (if open ceiling alternate is selected). adjacent partitions/provide plastic laminate fillers as necessary to enclose lockers. Locker Partition - Existing to Remain
Future Tenant's selected vendor are to confirm furniture new occupancy and equipment load (quantities NIC); test and balance HVAC for correct output where indicated @ Break #322; construct of 3/4" MDF clad in plastic laminate with salvaged match existing as necessary.
responsibility of General Contractor. Provide and install new PIU boxes where needed to achieve hardware; reuse salvaged stainless steel handicap accessible sink if in good condition with new Specification: Ideal Lockers 2000 Series, 12"W x 72"H (overall height), Custom Plastic Laminate,
tion drawing provided by vendor to meet Future Tenant's needs Partition - New Construction
separate zoning at each suite as necessary. lever-type fixtures. Base cabinets to have one (1) adjustable shelf within and one (1) drawer above; C12 - Provide and install two (2) new decorative pendant light fixtures centered over countertop on Full Height Doors: In lieu of reusing existing doors, provide and install new full height stain Finished 4" Base (to match exterior plam), Satin Chrome 1 14" Number Discs, Surface Mounted Padlock
the sole responsibility of the Future Tenant and/or future
Note: Mechanical Engineer to provide VAV box(es)/PIUs @ ALL conference and meeting rooms provide opening for Future Tenant provided dishwasher (NIC); upper cabinets to have two (2) ceiling tile/grid @ Collaborate#311. [Allowance: $350/fixture cost only] grade doors in hollow metal frame. Infill partition as necessary at removal of hollow metal door Hasp, Aluminum Clothes Hook (as needed), PVC Edging (to match exterior laminate), Flat Top.
ions prior to providing furnishing to ensure feasibility of product Door - Existing / New
throughout suite as required. Mechanical Engineer to determine appropriate number and adjustable shelves within and shelf for Future Tenant provided (2) two microwaves (NIC). Provide frame with sidelight unit. Verify existing/provide new passage set hardware; lockset hardware
specifications of VAV box(es)/PIUs to provide proper heating, ventilation, and cooling per new 2" backsplash and FTR within partition as required. Reuse salvaged appropriately sized electric C13 - Provide and install (3) three new pendant light fixtures suspended from structure and at all private offices, typical. A10 - Provide and install new thermostatically controlled fan @ Existing IT #324. Undercut door
or provide 2'x2' louver. Key - Floor Finish Transition
artition where indicated by symbol; floor to underside of ceiling, occupancy and equipment load per existing building system. Provide Design build drawings as water heater for sink/dishwasher if in good working condition; coordinate with Construction centered over new waterfall island commune table(s) if open ceiling alternate is selected @ Break
ions floor to slab where exposed ceilings occur. Top off existing required for MEP build out. Contractor is responsible for the distribution of design build drawings to Manager if a new water heater is required. Provide new hot and cold water lines as necessary to #322. (Total Qty:6) [Allowance: $350/fixture cost only] A1 - Modify interior partition (if full height doors are selected) to have new 2'-0" wide x full height
x 1/4" thick clear tempered glass sidelights in polished chrome with top and bottom metal channels A11 - Provide (3) three ceiling hung felt panels 4'-0" wide x 8'-0" high. Install velco applied C1 Key - Note
e where plenum is exposed. owner for review prior to any modifications. Coordinate all requirements w/Construction new plumbing location; include all necessary fittings, drain lines, connections and accessories as
Manager and Building Engineer. required. A backflow prevention device shall be installed to comply with all applicable parts of C14 - Confirm existing floor cores are in good working condition for Future Tenant's furniture at all Offices. Provide GWB ceiling header to slab and bracing to structure as necessary at all open panels using single statationary track hardware mounted to grid @ Open Office #308.
d repair all surfaces where demolition and/or new construction 2012 IPC Sections 608.3 and/or 608.16. (NIC); coordinate with Future Tenants furniture vendor for usability. ceiling areas. Specification: Filz Felt - Matrix; Contact: Alicia Denton 404.216.3967 Key Hatch #1 - New Exposed C
epare areas to receive new finishes. Power/Communications: Existing power/communication outlets to remain throughout, unless
noted otherwise. Provide new power/communication outlets to accommodate new partition layout. C4 - Provide and install approximately 11'-0" of new plastic laminate base cabinets where C15 - Provide and install FTR within partition for Future Tenant provided signage (NIC) @ A2 - Provide and install new 16'-0" wide (minimum equal panels) x floor to underside of ceiling, A12 - Provide and install (1) wall hung pin-up/tack boards 3'-2" wide x 8'-0" high @ Open
clear tempered glass panels in polished chrome top and bottom channels with clear silicone butt Office #302 and (2) two @ Open Office #317. Specification: Filz Felt - Akustika 10 Wall with Key Hatch #2 - New Exposed C
sting doors to remain throughout, unless noted otherwise. Each office/open office/work area/reception to have a minimum of two duplexes and one voice/data indicated @ Break #322; construct of 3/4" MDF clad in plastic laminate with salvaged Reception #300. Coordinate exact location and all requirements with
ify existing hardware is in good working order. Repair/provide outlet; common areas to have minimum building standard requirements, all future hardware. Base cabinets to have one (1) adjustable shelf within cabinets and two trash pull outs Construction Manager. joints @ Conference #303. Provide GWB ceiling header flush with ceiling grid/tile; brace to 6mm cork underlayment felt wrapped panel(s); install using provided z-clips. Contact: Alicia Denton
de new lockset hardware at all offices, typical. copiers/printers/refrigerators/dishwashers/microwaves to be on dedicated outlet and GFI's to be with surface mount receptacle openings as indicated on plan. Provide 2" backsplash and FTR within structure as necessary. 404.216.3967
Key Shade #1 - New Exposed C
provided at all wet areas, typical. Provide and install new/reuse existing 8'-0” H x 4'-0” W x partition as required. C16 - Install salvaged Men/Womens signage at Restrooms. Install in prior location.
) of entry/exit doors to remain @ Elevator Lobby. Contractor 3/4” TH fire-rated plywood phone board @ Existing IT #324. Mount phone board flush with A3 - In lieu of existing suspended ceiling tile/grid, expose ceiling areas indicated by Key Shade A13 - Provide exposed concrete where indicated by Key Shade #2; approximately 5'-0" wide
magnetic lock, closer and lockset hardware are in proper ceiling; paint to match wall on which it occurs. Coordinate with Construction Manager on C5 - Provide and install two new waterfall island commune tables; (1) one 10'-2" x 2'-6" x 2'-10" C17 - Provide and install vinyl composite tile @ Existing IT #324. Include carpet/concrete to #1. Fog structure and systems above in all open areas. Top off existing and new partitions to walkway. Strip and prepare floor as necessary for new penetrating concrete sealer. Provide (1) coat
structure above where plenum is exposed. Install salvaged suspended light fixtures; chain hung at of concrete penetrating sealer with 20% solids for low sheen finish. See Symbol Legend. Key Shade #2 - Exposed Concr
ecessary. exact location. high and (1) one 10'-2" x 2'-6" x 3'-6" high @ Break #322. Construct countertops and waterfall VCT transtion within bid.
base sides of 3/4" MDF with 2" fascia clad in plastic laminate. Waterfall side bases to extend to top exposed ceiling. Modify sprinkler heads as required by code. See Symbol Legend.
ng to remain throughout, unless noted otherwise. Confirm Life Safety: Verify existing/provide new building standard Life Safety devices throughout area of of counter to finished floor. Reinforce millwork full length with steel stretcher bar for support as C18 - Provide and install new luxury vinyl tile @ Break #322, floor finish transition indicated by A14 - In lieu of existing to remain; provide and install new finishes at Restrooms, with exception of
A4 - In lieu of existing suspended ceiling tile/grid, expose ceiling areas indicated by Key Hatch #2 wall tile. All existing plumbing, toilet partitions, and accessories to remain. Finish to include new Key Shade #3 - NIC
ructure above. demolition/construction, including emergency light fixtures, exit signage, fire horn/strobe devices required. dash as shown on plan. [LVT Allowance: $5.00 SF installed]. Include carpet/concrete to LVT
and fire extinguishers. Provide new as needed and/or required by code. transtion within bid. at walkways. Fog structure and systems above in all open areas. Top off existing and new partitions plastic laminate apron at sink, vinyl wallcovering throughout [Wallcovering Allowance:
w building standard occupancy switches throughout area of C6 - Provide and install approximately 4'-8" of new plastic laminate base and upper cabinets @ to structure above where plenum is exposed. Modify sprinkler heads as required by code. See $4.50 SF installed, and new ceramic tile flooring and base throughout [Tile Allowance:
installed, unless noted otherwise. Utilize existing j-box and Blinds: Contractor to clean all existing blinds at construction completion. Copy/Work #325, 9'-9" of new plastic laminate base and upper cabinets @ Copy/Print #320, Symbol Legend. $15.00 SF installed].
specification with Construction Manager prior to and 6'-0" wide of new plastic laminate base and upper cabinets @ Copy/Print #331. Construct
Carpet Tile: Provide and install new carpet tiles throughout including elevator lobby, unless A5 - In lieu of plastic laminate countertops, provide and install solid surface countertops A15 - Provide and install new decorative vinyl wallcovering at elevator lobby. Paint ceiling (2) two
countertops of 3/4" MDF clad in plastic laminate with salvaged upgraded cabinet hardware pulls.
otherwise noted. [Shaw Carpet Tile Allowance: $18.00/SY installed] throughout @ Break #322. [Allowance: $80.00/SF installed] coats flat finish. [Allowance: $4.50 SF material only].
Base cabinets to have one (1) adjustable shelves within and upper cabinets to have (2) adjustable
necessary where affected by demolition/construction. Reuse shelves within. Provide 2" backsplash and FTR within partition as required.
@ Private Offices and Huddle Rooms; provide new to match Paint: Provide and apply two (2) coats eggshell latex finish on all walls; allow for accent paint at A6 - Provide and install new wall mounted cable outlet (TV box), duplex outlet (TV box) and data A16 - Provide and install (36) suspended cylinder fixtures @ open ceiling walkways if Alternate
mmodate minimum (1) per 100 sq. ft and (1) per 15 sq. ft at 30% of total wall surface area; two (2) coats semi-gloss latex finish on all h.m. frames. C7 - Provide and install approximately 15'-0" x 2'-1" x 2'-8" high work surface of new plastic outlet (TV box) where indicated for Future Tenant provided flat screen TV (NIC). Coordinate Note # A4 is accepted. (Specification: Vantage Velocity #814VF - pendant mount) Contact: Heathy
ight fixtures at open office areas and areas where the ceiling is laminate @ Collaboration #311. Construct countertop of 3/4" MDF with 2" fascia clad in plastic exact location with Construction Manger taking wall mounting bracket into consideration Gowdy at Lighting Associates 678.457.8188.
essary. Clean, relamp, and reballast existing light fixtures as Rubber Base: Provide and install new 4" rubber base throughout. laminate. Provide (4) four 4" diameter steel support legs and FTR blocking within partition to brace prior to installation. Provide and install FRT blocking for TV (NIC) as necessary.
ecircuit existing lighting as necessary for new partition layout. as required for necessary structural support. A17 - [Deduct] Remove floor core receptacle(s) throughout Area of Construction; float/skim slab
Transition Strip: Provide Tarkett Johnsonite Slim Line Transition SLT-XX-L Color to Match Carpet A7 - Construct new 5'-5" wide x 4" thick x 3'-6" high GWB bump out for TV niche. Provide and as necessary to receive new finishes.

FOR LEASING INQUIRIES, PLEASE CONTACT:


to remain as is unless noted otherwise. Patch and repair grid @ all transitions, unless otherwise noted. Maximum transition 1/4" per ADA requirements. C8 - Provide and install waterlines/drainlines for Future Tenant provided (2) two refrigerators with install FRT blocking within partition for Future Tenant provided TV (NIC) @ Conference #301
or soiled tiles to match existing. ice makers (NIC), and dishwasher (NIC) @ Break #322. A backflow prevention device shall be and Lounge #332. Coordinate exact location and all requirements with
Construction Manager.
installed to comply with all applicable parts of 2012 IPC Sections 608.3 and/or 608.16.
nd installation is to be provided by licensed sprinkler contractor Construction Plan - Notes A8 - Provide and install approximately (2) two 14'-1" of custom upholstered banquette with plastic
ate and Local codes. Coordinate relocation of existing sprinkler C9 - Expose ceiling @ Reception #300, indicated by Key Hatch #1. Fog structure and
C1 - Relocate (5) five 3'-0" wide x 7'-0" interior doors/frames with passage set hardware where laminate base where indicated @ Reception #300. Provide appropriate padding, springs and
, including sprinkler head direction, with the base building fire systems above in all open areas. Top off existing and new partitions to structure above where
indicated. Hardware and door stain to match existing throughout, typical. Touch up stain finish as supports as required; provide 4" thick upholstered seat and 2'-6" high x 3" thick upholstered back.
ate with Construction Manager. plenum is exposed. Reuse cable hung suspended linear light fixtures to accommodate new layout;
necessary. Provide GWB ceiling header flush with ceiling grid/tile as required at open ceiling design. [Upholstery Allowance: $50/yard]
modify cable length as necessary. Modify sprinkler heads as required by code. See Symbol
Legend.
C2 - Relocate (1) one 3'-0" wide x 7'-0" interior door frame unit with sidelight to match existing

JEFF KEPPEN @ Existing Office #307. Lock set hardware and door stain to match existing private offices
throughout, typical. Touch up stain finish as necessary. Provide GWB ceiling header flush with KATHERINE LYNCH
C10 - Relocate (12) twelve recessed down light fixtures in addition to existing fixtures @
Conference #303. Provide (4) four three way switches, two at each door entry. Recircuit existing
CBRE, INC.
ceiling grid/tile as required.
lighting as necessary for new partition layout.
Senior Vice President First Vice President +1 404 504 7900
+1 404 504 7923 + 1 404 504 5971 cbre.com/atlanta
jeff.keppen@cbre.com katherine.lynch@cbre.com

© 2017 CBRE, Inc. This information has been obtained from sources believed reliable. We have not verified it and make no guarantee,
warranty or representation about it. Any projections, opinions, assumptions or estimates used are for example only and do not represent
the current or future performance of the property. You and your advisors should conduct a careful, independent investigation of the
property to determine to your satisfaction the suitability of the property for your needs. CBRE and the CBRE logo are service marks of
CBRE, Inc. and/or its affiliated or related companies in the United States and other countries. All other marks displayed on this document
are the property of their respective owners. PMStudio_October2017

Das könnte Ihnen auch gefallen