1. OBJECTIVE:
The scope of this work is to describe the method and sequence of activity required the
ground treatment by grouting of unit 2 soil strata (as per GAR) at CP1, CP2 and CP3.
The objective of this document is to describe the ground improvement process and
procedures of execution along with maintaining the quality of work.
This is a grouting technique into a soil stratum to improve its strength up to 250 kpa. The
drilling will be carried out in soil strata after pre-drilling of tunnel segments. Sodium silicate
and cement slurry will be injected through that grout hole.
STAGE-1
Figure-3: Cross section showing the process of grouting through pre-drill holes
The steel pipe will be pushed approximately 80 cm into the surrounding soil and
grouting will be executed.
After grouting, the pipe will be inserted deeper into the drilled hole (approximately
+100 cm/ each pipe) and grouting start again.
Figure.6 Sketch showing the stage 3 grouting procedure
After grouting mid of the cross passage the same sequence shell be followed from
another side