Sie sind auf Seite 1von 4

Ch 6

Renovation of Electro‐Mechanical equipments in a Hotel
ID ITEM Qty Unit

1 Cleaning boilers and testing - cap 250,000 Kcal 9.0 pc

2 Checking /testing/ all radiatots (heating eff, leaking point, …) 470.0 pc

3 Checking /testing/ startingl ,Chiller system -cap 40 ton 12.0 pc

4 Sanitary white ware fixtures, test, change if needed 670.0 pc

5 Washing machines /spare parts/ fixing leakage…cap 12 kg 32.0 pc

6 Checking all electric devices/ TVs/ sockets/lights/ internet connection 1,200.0 PC

1
Ch 6

Closing period is 2 weeks Maximum


Crews to work 9 hr/day
Crews to start work altogether
How many crews to call for??

Hotel crews $ /Skl No $ /S.Skl No $ /Lab No


Electrical crew of 1.0 2.0 3.0
mechanical crew ‐sanitary works only 1.0 3.0 4.0
The production is noted as:
Sanitary white ware fixtures, test, change if needed 1 pc I hr crew of 1
Washing machines /spare parts/ fixing leakage…cap 1 0.4 pc I hr crew of 1
Checking all electric devices/ TVs/ sockets/lights/ inte 1.5 pc I hr crew of 1

4 Sanitary white ware fixtures, test, change if needed 670 pc
5 Washing machines /spare parts/ fixing leakage…cap 1 32 pc
6 Checking all electric devices/ TVs/ sockets/lights/ inte 1200 pc

Contractor crews contractor rate $/pc

1 Cleaning boilers and testing - cap 250,000 Kc 9 pc 120 crew of 4

2 Checking /testing/ all radiatots (heating eff, lea 470 pc 15 crew of 2

3 Checking /testing/ startingl ,Chiller system -ca 12 pc 500 crew of 4

2
Ch 6

DURATION - Calculation Sheet


$ /Skl No $ /S.Skl No $ /Lab No

1 Cleaning boilers and testing - cap 250,000 Kcal 9.0 pc 50.0 2.0 35.0 1.0 25.0 1.0

2 Checking /testing/ all radiatots (heating eff, leakin 470.0 pc 50.0 1.0 35.0 0.0 25.0 1.0

3 Checking /testing/ startingl ,Chiller system -cap 4 12.0 pc 50.0 2.0 35.0 1.0 25.0 1.0

4 Sanitary white ware fixtures, test, change if need 670.0 pc 1.0

5 Washing machines /spare parts/ fixing leakage… 32.0 pc 1.0

6 Checking all electric devices/ TVs/ sockets/lights 1,200.0 pc 1.0

3
Ch 6

Day / 1 Day/
Lab No/crew Total cost AV.rate /hr Rate $/unit Hr/day Unit/1 hr Unit/ day Selc crew Lab hr Day Work
crew crews

4.0 160.0 5.0 90.0 9.0 0.06 0.50 1.0 162.0 18.0 4.5 4.5

2.0 75.0 4.7 12.0 9.0 0.39 3.52 5.0 1,203.2 133.7 66.8 13.4

4.0 160.0 5.0 400.0 9.0 0.01 0.11 2.0 960.0 106.7 26.7 13.3

1.0 0.0 0.0 1.0 9.0 1.00 9.00 6.0 670.0 74.4 74.4 12.4

1.0 0.0 0.0 1.0 9.0 0.40 3.60 1.0 80.0 8.9 8.9 8.9

1.0 0.0 0.0 1.0 9.0 1.50 13.50 7.0 800.0 88.9 88.9 12.7
3,875.2 430.6 270.2 65.2