The document discusses the results of a power system lab simulation. It notes that buses 1 and 7 were overloaded and bus 7's voltage was not at the standard 1 p.u. value. Figures 1-3 show circuit diagrams with and without a capacitor added. Adding a 200 MVA capacitor helped adjust the voltage on bus 6. The conclusion is that installing capacitor banks can help overcome overload conditions by allowing bus voltages to adjust.
The document discusses the results of a power system lab simulation. It notes that buses 1 and 7 were overloaded and bus 7's voltage was not at the standard 1 p.u. value. Figures 1-3 show circuit diagrams with and without a capacitor added. Adding a 200 MVA capacitor helped adjust the voltage on bus 6. The conclusion is that installing capacitor banks can help overcome overload conditions by allowing bus voltages to adjust.
The document discusses the results of a power system lab simulation. It notes that buses 1 and 7 were overloaded and bus 7's voltage was not at the standard 1 p.u. value. Figures 1-3 show circuit diagrams with and without a capacitor added. Adding a 200 MVA capacitor helped adjust the voltage on bus 6. The conclusion is that installing capacitor banks can help overcome overload conditions by allowing bus voltages to adjust.
Adeel Ahmad [COMPANY NAME] a)All values in p.u: They have converted and used in software.
b) Manual Calculation: c):Y-Bus:
d: Flow/Running Diagram:
Figure 1: Circuit Diagram
Figure 2: Running Circuit without Capacitor
Figure 3: Running Circuit with Capacitor
e): Busses which are overloaded:
Yes Bus 1 and Bus 7.
f) Bus whose Voltage is not p.u:
Bus 7 voltage is not 1.07 p.u which is greater than 1 p.u.
Busses Voltages:
g) Bus Voltages under 0.98 p.u:
No, Bus 2, 3,4,5,6 values are under 0.98 p.u.
h): No.6: Capacitor Bank Value Adjustment:
By adjusting the value of Capacitor 200 MVA p.u voltage can be adjusted. i)Conclusion: After performing this lab I can conclude that under overload conditions the buses voltages adjust their self to overcome this situation. By installing Capacitor bank the Overload condition can be overcome.