SERPRAM
*2 Simultaneous measurements US EPA-5 (PM) and US EPA-7E *105,9 UF + 19% IVA *EPA-5/ EPA-7E/ EPA-6C: 1 day *EPA-5/ EPA-7E/ EPA-6C: 1 engineer, 4 *EPA-5/ EPA-7E/ EPA-6C: 10
(Nox), US EPA-6C (SO2) *EPA-29: 2 days technicians hrs. (M/H)
*1 Metal-emission measurement US EPA-29 (NI, V and Hg) *179,7 UF + 19% IVA *previous technical visit to site: 1 *EPA-29: 1 engineer, 3 technicians *EPA-29: 10 hrs (M/H)
OR SUBTOTAL: 285,6 UF (+ 19%IVA) day
*1 Metal-emission measurement US EPA-29 (NI, V) *122,3 UF + 19% IVA
SUBTOTAL: 228,2 UF (+ 19% IVA)
TOTAL: 3 measurements TOTAL: 4 DAYS (TOTAL: 5 PEOPLE) TOTAL: 70 M/H
JHG
*PM, Heavy Metals (NI, V, )gas continuous emission (SO2, Nox, O2, 1 Gas Continuous Emission Supervisor EPA-6/ EPA-7 : 2 hrs
CO2) sampling 1 Probe Operator Gas Continuous EPA-29/ EPA-5:
*Continuous-emission measurement EPA-6, EPA-7 (SO2, Nox, O2, Emission
CO2) 1 Isokinetic Sampling Supervisor
*Metal-emission measurement EPA-29 (NI, V) and EPA-5 (PM) 1 Control Emission Unit Operator (MPT)
1 Probe Operator (MPT)
SGS
OPERATIONAL COSTS TOTAL PRICE ADDITIONAL COMMENTS
EQUIPMENT
* HORIBA, ENDA 1000 75 UF + IVA
* THERMO ENV. 43 C
* BECKMAN
* SERES
*Day/equipment: 35, 1 UF + 19 %IVA (Measurement costs+ operational costs) *Nox/ SO2: with All technical equipment
*Transportation (3 days of instrumental analyzers. supplied by the company
measurement) : 10,0 UF +19% IVA 228,2 UF + 19% IVA + 57,1 UF + 19% IVA = Range: 0-5000 (ppm)
Previous tech. visit: 12, 0 UF + 19% IVA 285,3 UF +(19% IVA) (Doesn't include Hg *Hg measurement is Payment: 50% when sampling
measurement) optional on site is completed
Subtotal: 57,1 UF (+19% IVA) 50% when measurement report
is delivered (15 days after
completion of sampling)