Parameters:
Apron length @ U/S, L1 = 0.00 m
Apron length @ D/S, L2 = 31.50 m
Total length of the floor, b = 45.90 m
Depth of U/S pile line, d = 5.50 m
= b /d = 8.35
2
= [1 + sqrt (1 + )] /2 = 4.70
CONCLUSION:
Based from the assumed material of foundation (boulders, gravels and sand) with a safe hydraulic gradient should be less than 1/3.5 to 1/3
(Lane's Safe Hydraulic Gradient for different types of Soils), the provided creep length is not enough to ensure the safety against piping. We
therefore conclude to provide an additional apron at the upstream section.
Tabulation of Corrected Pressure (%)
Upstream Pile Intermediate Pile Downstream Pile
øE1 = 100.00 % øE2 = 69.47 % øE3 = 28.74 %
øD1 = 78.85 % øD2 = 62.48 % øD3 = 21.15 %
øC1 = 72.43 % øC2 = 56.51 % øC3 = 0.00 % 2.87
2.11
Effective Upilift Head (m) Pressure Point @ TOE 0.00
Max Seepage Head = 14.45 m 10.00 6.95
Pressure @ Heel = 14.450 m øC2 = 56.51 % 7.89 6.25
Pressure @ Toe = 8.166 m 7.24 5.65