BLOWER)
Date 4.04.18
Supports Required
Slag Removal &
PreFabrication
Root 100% Dp
Final Weld Dp
Stud Bolts
Cleaning
Tie In
Painting
Gasket
Existing Executio
Blind
Valve
Tag No. Service Tie In Description Rating # Size Size Point Plant n / Team Remarks
Qty
40 bar (g) Super New Boiler Super heated steam O/L Supports
2 heated Steam tie in 600# 250NB 200NB 1 BOILER Imran Required C C C C C C C C C R
Blind to be boxed
15 bar (g) P- 170 15 bar(g) Saturated network
5 Saturated Steam tie in 300# 200NB 200NB 1 P170 Imran up in P-170 C C C C C C N/C N/C C R
Tapping
15 bar (g)
6 Saturated Steam New TFH Tie-In Point 300# 150NB 25NB 1 TFH Ganesan C C C C C C C C C C
Blind to be boxed
4 bar (g) 4 bar (g) Saturated Steam i/l from 6 TURBO
8A Saturated Steam bar for new 6 to 4 let down 150# 350NB 250NB 1 BLOWER Imran up in P-170 C C N/C N/C C R
Tapping
4 bar (g)
9A New Boiler 4 bar(g) steam tie in 150# 350NB 150NB 1 BOILER Imran C C C C C C C C C C
Saturated Steam
6 bar (g) 6 bar(g) Saturated network tie in for
10 Saturated Steam TFH 150# 100NB 25NB 1 TFH Ganesan C C C C C C C C C C
HP condensate hook(P144/P142
HP condensate
11 pump disch.) up of new boiler to 150# 80NB 80NB 1 BOILER Imran C C C C C C C C C C
hook network
LP condensate hook(P144/P142
12A LP Condensate pump disch.) up of new boiler to 150# 50NB 50NB 1 BOILER Imran C C C C C C C C C C
network
12B Cl3 P170 Lp flash drum 150# 80NB 50NB 1 P170 Ganesan C C C C C C C C C C
12C Cl5 P170 HP Flash Drum 150# 50NB 50NB 1 P170 Ganesan C C C C C C C C C C
5MW Turbine condensate
5MW Turbine
14A hook(P144/P142) up of new boiler 150# 100NB 80NB 1 BOILER Imran C C C C C C C C C C
condensate to network
New Turbo New Turbo blower Condensate
blower TURBO
14B pump dischrge to P-142 BFW tank 150# 80NB 80NB 1 Imran C C C C C C C C C C
Condensate pump with nozzle tapping BLOWER
dischrge
LP Drip Leg Drip Leg Condensate HOOK up of
15 150# 50NB 50NB 1 BOILER Imran C C C C C C C C C C
Condensate new boiler to network
16 DM Water New Boiler Utility Tie In 150# 100NB 80NB 1 BOILER Imran C C C C C C C C C C
17a Nitrogen New Boiler Utility Tie In 150# 40NB 25NB 1 BOILER Imran C C C C C C C C C C
17b Nitrogen TFH 150# 25NB 25NB 1 TFH Ganesan C C C C C C C C C C
New Boiler Utility Tie In TANK
18 Furnace oil TAPPING 150# 200NB 200NB 1 BOILER Imran C C C C C N/C C C C C
50/25 50/25
20A Furnace oil New Boiler Utility Tie In 150# 4 BOILER Imran C C C C C C C C C C
NB NB
TURBO
22A Process Air For New Turbo blower Process air 150# 80NB 25NB 1 BLOWER Imran C C C C C C C C C C
26 Raw Water New Boiler Utility Tie In 150# 300NB 25NB 1 BOILER Imran Not Taken
27 Instrument Air New Boiler Utility Tie In 150# 80NB 50NB 1 BOILER Imran C C C C C C C C C C
TURBO
28 Instrument Air New Turbo blower tie 150# 80NB 25NB 1 Imran C C C C C C C C C C
BLOWER
29A Portable Water New Boiler Utility Tie In 150# 80NB 25NB 1 BOILER Imran C C C C C C C C C C
TURBO
29B Portable Water New turbo blower 150# 80NB 25NB 1 Imran C C C C C C C C C C
BLOWER
29C Raw Water P170 Raw water 150# 50NB 25NB 1 P170 Imran Not Taken
New Boiler 60
bar(g) HP pump Existing 15 bar Desuperheater BFW
33B from New Boiler BFW pump 150# 40NB 40NB 2 BOILER Imran C C C C C C C C C C
discharge BFW
34 Instrument Air P-170 network extension 150# 80NB 80NB 1 P170 Ganesan C C C C C C C C C C
35 Nitrogen P-170 network extension 150# 40NB 40NB 1 P170 Imran C C C C C C C C C C
36 DM Water P-170 DM water extension. 150# 80NB 1 P170 Ganesan Not Taken
Diphyl Service Safety valve o/l hook Supports
37 Diphyl up/ Drain Line hook up 300# 80NB 80NB 1 TFH Ganesan Required C C C C C C C C C C
EA 409 diphyl i/l & o/l for P-170
39A Diphyl relocation layout 300# 150NB 150NB 1 P170 Ganesan C C C C C C C C C C
Blind Side Stud
Bolts to changed
from M20x110 to
M20x120
ORTHOXYLENE Supports
41 P-170 network extension 300# 50NB 50NB 1 P170 Ganesan C C C C C C C C C C
RETURN Required
TURBO
42 DM Water New Turbo Blower Condensate 150# 100NB 50NB 1 BLOWER Imran C C C C C C C C C C
TURBO
43 N2 Turbo Blower 150# 40NB 25NB 1 BLOWER Imran C C C C C C C C C C
TURBO
44 Raw Water Turbo Blower 150# 300NB 25NB 1 BLOWER Imran C C C C C C C C C C
TURBO
45 DM Water New ACC Fins Cleaning 150# 100NB 50NB 1 Imran C C C C C C C C C C
BLOWER
4 bar (g)
48 TFH 150# 200NB 50NB 1 TFH Ganesan C C C C C C C C C C
Saturated Steam
50 Instrument Air TFH 150# 50NB 50NB 1 TFH Ganesan C C C C C C C C C C
HP Dripleg Drip Leg Condensate for 40 bar SHT
51 300# 50NB 1 P170 Imran C C C C C C C C C C
Condensate coming near Substation
70
N/C- Not Completed
C- Completed
1 All Tie In Points Welding are completed as on 05.04.2018 R-Required
6 bar(g) Saturated
7B 6 barg extraction tie in to 6 bar network 150#
Steam
4 bar (g) Saturated 4 bar (g) Saturated Steam i/l from 6 bar for
8A 150#
Steam new 6 to 4 let down
6 bar(g) Saturated HP Pump suction tapping from BFW tank new
8B 150#
Steam nozzle tapping.
4 bar (g) Saturated
9A New Boiler 4 bar(g) steam tie in 150#
Steam
6 bar(g) Saturated P-170 6 bar steam network extension tie in 2
9B 150#
Steam nos.
6 bar(g) Saturated P-170 6 bar steam network extension tie in 2
9C 150#
Steam nos.
6 bar (g) Saturated
10 6 bar(g) Saturated network tie in for TFH 150#
Steam
HP condensate hook(P144/P142 pump disch.)
11 HP condensate hook 150#
up of new boiler to network
LP condensate hook(P144/P142 pump disch.)
12A LP Condensate 150#
up of new boiler to network
12B Cl3 P170 Lp flash drum 150#
47 HP Dripleg Condensate Drip leg Cond. For 40bar -sat, Sup, 15 bar- Sat 150#
4 bar (g) Saturated
48 TFH 150#
Steam
49 Waste water inlet to ETP Water inlet Tapping 150#
50 Instrument Air TFH 150#
Drip Leg Condensate for 40 bar SHT coming
51 HP Dripleg Condensate 300#
near Substation
JECT (INCLUDES NEW TFH/NEW BOILER/P-170 NETWORK HOOK UP /NEW TURBO BLOWER)
Rev 1
Tie In
Existing Size Size Point Plant Scaffolding Required Area
Qty
TURBO
250NB 200NB 1 Cl 9-10
BLOWER
TURBO
350NB 250 1 Cl 8-9
BLOWER
Dewater sump pit. Brazing to be
200NB 200NB 1 P170 modified
74
OWER)
1
STATUS TO
Valve Fitting CONSULT DRAWIN MAINTE
Remarks Available Available ANT G NANACE
ü ü ü ü ü
ü ü ü ü ü
Elbow
SCH 80
ü 1.no ü ü ü
missing
ü ü ü ü ü
ü ü ü ü ü
RT 10X8
ü 1.no ü ü ü
missing
ü ü ü ü ü
not
ü ü schown
ü ü ü ü
ü ü ü ü
ü ü ü
ü ü ü
Contact Barath
ü
Contact Barath ü
ü ü ü
wnrf
ü -300# flg- ü ü ü
150nb-
wnrf
ü -300# flg- ü ü ü