Gold Recovery System
The Macrotec Gold Recovery from Activated Carbon System has revolutionised the way gold is recovered
from fine activated carbon. The system has had global success, with units operating in South Africa,
Tanzania, Ghana, Mali and the USA, with new projects underway across Africa and Asia. The system utilises
a thermal process that burns off the carbon and captures the gold residue in the resultant fly ash, using
highly efficient ceramic filters. The entire process is fully automated to increase productivity of the plant.
High Recovery Rate: With a recovery rate of 93-95%, our system far exceeds other industrial
processes, helping mines increase their gold yield.
Continuous Operation: Our system operates on a continuous basis, recovering 60/90 kg per hour. This
translates into processing 25 to 30 ton carbon per month, allowing for start-up
times and maintenance.
Low Operating Cost: Since the Macrotec system is a thermal process, utilising the heat produced by
the fine carbon, it results in very low operating costs, allowing for recovery of
gold in ultra-low concentrations.
Reliability & Maintenance: Low maintenance and high reliability are the most critical features of all
Macrotec’s products. A simplified design with few moving parts translates into
less maintenance and longer running times.
Environmentally Friendly: With no chemicals used in the process, combustion at a high temperature,
and ceramic filters to remove particulate matter, the process achieves results
without compromising the environment.
Due to increased pressure on gold mining firms to increase their recovery yield, they have started to
explore recovering gold from these carbon fines. With small changes made to their process to capture all
possible carbon from escaping, they are able to easily increase gold recovery.
Our system provides a reliable and cost effective method to recover gold from fine carbon.
Return on Investment
Return on investment is usually between 8 and 12 months, depending on the gold concentration in the
carbon particles and daily operating hours, with the unit able to recover 93-95% of gold content.
Capacity is also impressive, with the C100 treating 25 to 30 tonnes and the C150, 35 to 40 tonnes a month
at full capacity, which is in line with the requirements of large mines.
With a fast ROI, low operating and maintenance costs, our system has become the gold standard for the
industry.
4984
4600
3075
FAN
5730
8513
12192
12192
Hopper
Weight: 800kg's Tons
Area: 1500mm x 900mm
Air Supply
Suggested Doorway
Electrical supply
Filter
10143
4120
Weight: 2 Ton
C100 Incinerator
Weight: 18.5 Tons
5730 Area: 1400mm x 1400mm
8580