20 A1070 Sub- Grade Preparation works 57 days Tue 4/24/18 Tue 6/26/18 Lab 6/26
Technician,Water,Highway
21 SHAIGARI TO SHAHPUR.4.1 195 days Wed 1/3/18 Thu 8/9/18 Engineer,Water
Labour,Excavator,Trector
Protection Work & BOX Trolly,Dumper,Site
CULVERT-BILL NO (4 &5) Engineer,Surveyor,Roller
Water
22 A1080 Structural Excavation 70 days Wed 1/3/18 Thu 3/22/18 Truck,Water,Highway 3/22
Site Engineer,Surveyor,Project manager,Supervisor,Skilled Labour,Excavator,Dumper,Buldozer 120 HP
23 A1090 Lean Concrete Works 62 days Tue 1/23/18 4/2
Mon 4/2/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
24 A1100 Stone Masonry Works 80 days Thu 3/22/18 6/19 Engineer,Cement,Water,Sand
Tue 6/19/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Scoffolder,Structure
25 A1110 Fitter layer of Grangular Material 42 days Sat 6/23/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
if required Engineer,Lab
26 A1120 Concrete Works Class-A 80 days Sun 4/1/18 Technician,Project
Fri 6/29/18 Surveyor,Site 6/29
Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Labour,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
27 A1130 Granular Backfill with approved 35 days Sun 7/1/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
Material Engineer,Lab
28 A1230 Grouted Rip Rap Works 32 days Thu 7/5/18 Technician,Project Engineer,Lab Technician,Project manager,Material Engineer,Water,Sand
Thu 8/9/18 Surveyor,Labour,Site 8/9
29 SHAIGARI TO SHAHPUR.4.5 Sub 107 days Wed 7/25/18 Wed 11/21/18
Base & Base Works
Page 1
CONSTRUCTION OF YAKMACH TO KHARAN ROAD PROJECT
SECTION-II (SHAHI GHARI TO SHAHPUR
FROM KM 50+000 TO 100+000 (LENGTH = 50.000 KM)
ID Text1 Task Name Duration Start Finish Half 1, Resource
2017 Names Half 2, 2017 Half 1, 2018 Half 2, 2018 Half 1, 2019 Half 2, 2019
J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N
32 SHAIGARI TO SHAHPUR.4.6 102 days Mon 9/24/18 Wed 1/16/19
Pavement Works
49 A1300 Sub-Grade Prepation works 57 days Tue 4/24/18 Tue 6/26/18 Roller,Water 6/26
Truck,Highway
50 SHAIGARI TO SHAHPUR.2.1 195 days Wed 1/3/18 Engineer,Water,Lab
Thu 8/9/18 Labour,Excavator,Trector
Potection Work & BOX Culvert Trolly,Dumper,Site
-BILL NO (4 & 5) Engineer,Surveyor,Roller
Water
51 A1310 Structural Excavation 70 days Wed 1/3/18 Truck,Water,Highway
Thu 3/22/18 Site 3/22
Engineer,Surveyor,Project manager,Supervisor,Skilled Labour,Excavator,Dumper,Buldozer 120 HP
52 A1320 Lean Concrete 62 days Tue 1/23/18 4/2
Mon 4/2/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
53 A1330 Stone Masonry Works 80 days Thu 3/22/18 6/19 Engineer,Cement,Water,Sand
Tue 6/19/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Scoffolder,Structure
54 A1340 Fitter layer of Grangular Material 42 days Sat 6/23/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
if required Engineer,Lab
55 A1350 Concrete Works Class-A 80 days Sun 4/1/18 Fri 6/29/18 Technician,Project 6/29
Surveyor,Site Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Labour,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
56 A1360 Granular Backfill with approved 35 days Sun 7/1/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
Material Engineer,Lab
57 A1370 Grouted Rip Rap Works 32 days Thu 7/5/18 Technician,Project Engineer,Lab Technician,Project manager,Material Engineer,Water,Sand
Thu 8/9/18 Surveyor,Labour,Site 8/9
58 SHAIGARI TO SHAHPUR.2.5 SUB 107 days Wed 7/25/18 Wed 11/21/18
BASE & BASE WORKS
75 A1490 Excavation (Suitable 80 days Wed 1/3/18 Mon 4/2/18 Site 4/2
/Unsuitable) Engineer,Surveyor,Project
76 A1500 Compation of Natural Ground 71 days Fri 3/2/18 manager,Supervisor,Skilled
Sun 5/20/18 Surveyor,Labour,Site 5/20
Engineer,Highway
77 A1510 Formation of Embankment From 71 days Sat 3/24/18 Mon 6/11/18 Engineer,Lab
Surveyor,Labour,Site 6/11
out sout source/Suitable Engineer,Excavator,Trector
Excavated Material Trolly,Dumper
78 A1520 Sub-Grade Prepration works 57 days Tue 4/24/18 Tue 6/26/18 Roller,Water 6/26
Truck,Highway
Engineer,Water,Lab
Task Project Summary Inactive Summary Manual Summary External Milestone
Project: YAKMACH KHARAN critical a Split External Tasks Manual Task Start-only Progress
Date: Mon 10/16/17
Milestone External Milestone Duration-only Finish-only Deadline
Summary Inactive Milestone Manual Summary Rollup External Tasks
Page 2
CONSTRUCTION OF YAKMACH TO KHARAN ROAD PROJECT
SECTION-II (SHAHI GHARI TO SHAHPUR
FROM KM 50+000 TO 100+000 (LENGTH = 50.000 KM)
ID Text1 Task Name Duration Start Finish Half 1, Resource
2017 Names Half 2, 2017 Half 1, 2018 Half 2, 2018 Half 1, 2019 Half 2, 2019
J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N
79 SHAIGARI TO SHAHPUR.3.1 195 days Wed 1/3/18 Thu 8/9/18 Labour,Excavator,Trector
Protection Work & BOX Trolly,Dumper,Site
Culvert-BILL N0 (4&5) Engineer,Surveyor,Roller
Water
80 A1530 Structural Excavation 70 days Wed 1/3/18 Truck,Water,Highway
Thu 3/22/18 Site 3/22
Engineer,Surveyor,Project manager,Supervisor,Skilled Labour,Excavator,Dumper,Buldozer 120 HP
81 A1540 Lean Concrete 62 days Tue 1/23/18 4/2
Mon 4/2/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
82 A1550 Stone Masonry Works 80 days Thu 3/22/18 6/19 Engineer,Cement,Water,Sand
Tue 6/19/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Scoffolder,Structure
83 A1560 Pavement Markiting & Fixing of 42 days Sat 6/23/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
Reflected Studs Engineer,Lab
Technician,Project
84 A1570 Concrete Works Class-A 80 days Sun 4/1/18 manager,Material
Fri 6/29/18 Surveyor,Site 6/29
Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Labour,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
85 A1580 Granular Backfill with approved 35 days Sun 7/1/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
Material Engineer,Lab
86 A1590 Grouted Rip Rap Works 32 days Thu 7/5/18 Thu 8/9/18 Technician,Project
Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Water,Sand 8/9
87 SHAIGARI TO SHAHPUR.3.5 Sub 107 days Wed 7/25/18 Wed 11/21/18
Base & Base Works
107 A1740 Sub-Grade Prepation works 57 days Tue 4/24/18 Tue 6/26/18 Roller,Water 6/26
Truck,Highway
108 SHAIGARI TO SHAHPUR.5.1 195 days Wed 1/3/18 Engineer,Water,Lab
Thu 8/9/18 Labour,Excavator,Trector
Protection Work & BOX Culvert - Trolly,Dumper,Site
BILL NO (4 & 5 ) Engineer,Surveyor,Roller
Water
109 A1750 Structural Excavation 70 days Wed 1/3/18 Thu 3/22/18 Truck,Water,Highway 3/22
Site Engineer,Surveyor,Project manager,Supervisor,Skilled Labour,Excavator,Dumper,Buldozer 120 HP
110 A1760 Lean Concrete Works 62 days Tue 1/23/18 4/2
Mon 4/2/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
111 A1770 Stone Masonry Works 80 days Thu 3/22/18 6/19 Engineer,Cement,Water,Sand
Tue 6/19/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Scoffolder,Structure
112 A1780 Fitter layer of Grangular Material 42 days Sat 6/23/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
if required Engineer,Lab
113 A1790 Concrete Works Class-A 80 days Sun 4/1/18 Technician,Project
Fri 6/29/18 Surveyor,Site 6/29
Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Labour,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
114 A1800 Granular Backfill with approved 35 days Sun 7/1/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
Material Engineer,Lab
115 A1810 Grouted Rip Rap Works 32 days Thu 7/5/18 Technician,Project Engineer,Lab Technician,Project manager,Material Engineer,Water,Sand
Thu 8/9/18 Surveyor,Labour,Site 8/9
116 SHAIGARI TO SHAHPUR.5.5 Sub 107 days Wed 7/25/18 Wed 11/21/18
Base & Base Works
Page 3
CONSTRUCTION OF YAKMACH TO KHARAN ROAD PROJECT
SECTION-II (SHAHI GHARI TO SHAHPUR
FROM KM 50+000 TO 100+000 (LENGTH = 50.000 KM)
ID Text1 Task Name Duration Start Finish Half 1, Resource
2017 Names Half 2, 2017 Half 1, 2018 Half 2, 2018 Half 1, 2019 Half 2, 2019
J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N
127 SHAIGARI TO SHAHPUR.5 KM 553 days Thu 10/19/17 Sun 6/30/19
(90+000 TO KM 100+000
128 SHAIGARI TO SHAHPUR.6.2 130 days Thu 10/19/17 Tue 3/13/18
Levelling & Grading
136 A1960 Sub-Grade Prepation works 57 days Tue 4/24/18 Tue 6/26/18 Roller,Water 6/26
Truck,Highway
137 SHAIGARI TO SHAHPUR.6.1 195 days Wed 1/3/18 Engineer,Water,Lab
Thu 8/9/18 Labour,Excavator,Trector
Protection Work & BOX Culvert - Trolly,Dumper,Site
BILL NO (4 & 5 ) Engineer,Surveyor,Roller
Water
138 A1970 Structural Excavation 70 days Wed 1/3/18 Truck,Water,Highway
Thu 3/22/18 Site 3/22
Engineer,Surveyor,Project manager,Supervisor,Skilled Labour,Excavator,Dumper,Buldozer 120 HP
139 A1980 Lean Concrete 62 days Tue 1/23/18 4/2
Mon 4/2/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
140 A1990 Stone Masonry Works 80 days Thu 3/22/18 6/19 Engineer,Cement,Water,Sand
Tue 6/19/18 Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Scoffolder,Structure
141 A2000 Fitter layer of Grangular Material 42 days Sat 6/23/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
if required Engineer,Lab
142 A2010 Concrete Works Class-A 80 days Sun 4/1/18 Fri 6/29/18 Technician,Project 6/29
Surveyor,Site Engineer,Lab Technician,Project manager,Material Engineer,Structure Engineer,Labour,Scoffolder,Steel Fixer,Transit Mixer,Concrete Pump,Concrete Batching Plant,Cement,Steel,Wat
143 A2020 Granular Backfill with approved 35 days Sun 7/1/18 Thu 8/9/18 Surveyor,Labour,Site 8/9
Material Engineer,Lab
144 A2030 Grouted Rip Rap Works 32 days Thu 7/5/18 Thu 8/9/18 Technician,Project
Surveyor,Labour,Site Engineer,Lab Technician,Project manager,Material Engineer,Water,Sand 8/9
145 SHAIGARI TO SHAHPUR.6.5 Sub 107 days Wed 7/25/18 Wed 11/21/18
Base & Base Works
157 A1000 Punch List Correction works 18 days Sat 8/31/19 Fri 9/20/19 Highway Engineer,Lab 9/20
Technician. Material
158 A1010 Handing over 8 days Sat 8/31/19 Engineer,Masons,Forman,Project
Mon 9/9/19 Project manager 9/9
Page 4