Beruflich Dokumente
Kultur Dokumente
“Education is the most powerful weapon which you can use to change the
world.”
To date, the school has a teaching force consisting of nine- regular Teachers,
headed by one School Principal and the following non-teaching staff: one
utility, and two security officers.
In fact, we were able to harvest some of the fruits of our toils. The workforce
and the student body comprise a strong and rich human resource which is
evident in the awards and recognition garnered by some teachers and students in
various academic contests and other events in the district level. But I do hope
we can join and represent the school in the next higher levels. We are also
working on producing competent graduates who will become assets in their
secondary schools and in the community. That students coming from Campetik
Elementary School will be equipped with relevant skills which will make them
become more useful in the community.
On the other hand, the school is also fortunate to have compassionate PTA who
are willing to support the school in every undertakings. One to mention is the
conduct of the fundraising activity to finance school projects. But, we do not
stop there. We will continue to work with you as we strive for a better Campetik
Elem. School.
The PTA officials also work hand in hand with the school especially in the
implementation of school programs and projects. But the participation of the
PTA in meetings and conferences both for general PTA meetings and the
Homeroom PTA gatherings is fluctuating. As partners, we expect that strong
participation of parents and other stakeholders in school is high and it must be
sustained. Parents involvement in meetings, general assembly, and during
monthly PINTAKASI is much expected. Get yourselves involved and be aware
of the schools daily operation.
It is a common knowledge that our school is easily flooded even with just slight
rain, how much more with heavy rains? To ensure that learning instruction is
sustained, we devised a minor solution and on a trial an error basis scheme, the
construction of the school drainage phase 1. The project was a success.
Classrooms are no longer easily flooded during slight and heavy rains except
when there is typhoon and tropical depression.
For school beautification, the vacant area just beside the office has been cleared
and remodelled. Construction of plant boxes and a little bit of landscaping has
been done to improve its view. The use of used tires added beauty and the
painting gave more color to the area. Painting of the other flower boxes, exterior
walls of the school building was also done last July 2018.
The school flag pole has been properly placed and installed in an area that
children are correctly positioned during flag ceremonies.
The school also considered the safety of our children situated at the 2 nd floor of
that building in going up and going down. That is why, the repair of the
staircase had been done together with the installation of hand rail. The hand rail
was also painted to preserve its life from rust including the railing of the second
floor.
Two steel Grills has also been installed at both sides of the lobby of the second
floor to safe guard our very active children from crossing to the other side, and
staying at the roof of the adjacent building.
The installation of roof cover for the staircase was also prioritized. This is to
ensure that our children are safe from any harm might be brought because of the
exposure to rain and sunlight. Children are convenient in moving up and down
even with or without rain. But we are still waiting for the manpower to do the
painting. The materials are available, but the manpower is lacking. The school
would be happy if there are volunteers who will do the job. Are there
volunteers?
In the aim to further enhance the academic journey of each student and to fully
implement of the K-12 Curriculum, textbooks were provided. However, it is
sad to note that there are some learning areas that are not given textbooks yet.
Next school year, the school has lined up several activities and programs, like
symposiums, trainings & lectures, personality development programs, in order
to further facilitate students.
However, much as the school has a lot to be proud of, there are also a few
aspects where the school needs to focus and improve. These include computer
facilities which are non-functional at all. With over 275 students, our TLE
laboratory and a mini library cannot accommodate them all.
The school stage is ready for various programs and school events. However, it
needs major renovation and require a bigger budget. The LGU through the
school SEF has pledged that they will finance for the renovation of the school
stage. We’re currently working on the approval of the project proposal.
For CY 2018, the school was entitled with 1 storey 2 classroom building. But
when the DPWH personnel validated the school site, our school did not warrant
because of the space we have. Necessary steps has been done to modify the said
building but we failed. However, due to persistent request, our school was
included in the list of school building entitlement for CY 2020, a 3 storey 9
classroom bulding. Many things were fixed and mended. Hopefully, everything
will turn out well specially during the site validation.
On the other hand, a number of students still escape from classes by jumping
over the fence or by fooling and giving many reasons for them to be allowed to
go out.”Waray kkami balon mam, ginpapauli ako ni nanay para kumuha ak
balon, mapalit hin para project, and etc. Hence, there is a great need to improve
the school fence, strengthen our security measures which will entail a monetary
requirement. For this year we are thankful that Honorable Amalia Sornito has
provided us with gate guards.
Today, marks another milestones of Campetik Elem. School, being the new
school administrator, I am honored to be so. There is no greater calling than to
serve you all.