Sie sind auf Seite 1von 3

FARMAN ULLAH KHAN

PHONE · 00923468298722 , 00923059128378


Email · engrfarman74@gmail.com
Nationality: Pakistani Religion: Islam

EDUCATIONAL QUALIFICATION: BSC ELECTRICAL ENGINEERING UET PESHAWAR 2012.


PEC REGISTRATION#ELECT/37975

OBJECTIVES: To work in a challenging and a hardworking environment. Looking forward to


progressive organization where my skills and experience can be utilized toward mutual persistent
growth.
EXPERIENCE I have about 6 years of sound experience in various
organizations.
JAN 2017 – TO-JAN 2019
DESIGN & ENGINEERING SYSTEM PVT LTD
DURATION#1: From JAN2017 TO SEP2017
➢ LEAD ENGINEER ELECTRICAL AT NEW ISLAMABAD INTERNATIONAL AIRPORT
PROJECT.
(EXTERNAL ELECTRIFICATION & TELECOME WORKS) INCLUDES
(HT WORKS, LT WORKS, 11 KV SUBSTATION WORK, UNDERGROUND HV & LV CABLE
LAYING,INSTALLING STRAIGHT THROUGH JOINTS RHYCHEM,POINEERS &HONG SHANG, RMU’S
WORK, FEEDER PILARS, KIOSK INSTALLATION, LTOD’S, GENERATOR, TRANSFORMER WORK, LIGHTING
POLES INSTALLATION & LIGHTING ARRESTER INSTALLATION. )
DURATION#2 : FROM SEP2017 TO 16JAN2019
➢ LEAD ENGINEER ELECTRICAL + ELV AT FAISALABAD INTERNATIONAL AIRPORT
PROJECT (EXPANSION & RENOVATION OF TERMINAL BUILDING AND
REHABILITATION OF EXISTING FOKKER APRON AND ALPHA TAXIWAY). INCLUDE
(HT WORKS, LT WORKS, 11KV SUBSTATION WORKS, UNDERGROUND HV & LV
CABLE LAYING, INSTALLING STRIGHT THROUGH JOINTS OF RHYCHEM & POINEER,
GENERATOR WORK, LIGHTING ARRESTER INSTALLATION, ELECTRICAL WIRING AND
FALSE CEILLING LIGHTS INSTALLATION, AFL LIGHTING WORKS, TELEPHONE WORKS, IP
PHONE, FIBER OPTIC CABLE WORK, IT WORKS,WIFI SYSTEM INSTALLATION, DATA
CENTER AND RESPECTIVE IT ROOMS MANAGEMENT,ACCESS CONTROL
SYTEM,FIREWALL SYSTEM AND SUPPORT SERVIVCES INSTALLATION, CAT6, CAT6A
CABLE LAYING AND TERMINATION, FIRE ALARM SYSTEM, PUBLIC ADDRESS SYSTEM
WORKS, CCTV SYSTEM WORKS(IP CAMRA’S), MASTER CLOCK SYSTEM,
FIDS SYSTEM WORKS(FLIGHT INFORMATION DISPLAY SYSTEM).
FROM NOV 2015 TO DEC 2016
NAWAB KHAN ENGINEERING & CONSTRUCTION COMPANY PVT LTD
NEW IT & EMERGING SCIENCES BLOCK at Fathima Jinnah women university Project
➢ INCLUDES electrical wiring, lights installation, switch gears installation and termination,
700KVA Transformer installation and termination.
FROM AUG 2014 TO NOV 2015
CHANG HONG RUBA ELECTRICAL COMPANY PVT LTD LAHORE.
PAKISTAN.
➢ QA/QC ENGINEER ELECTRICAL
1. Ensuring quality records and performs field inspection.
2. Ensuring the quality of all site materials to be assembled.
3. Developing and initiating standards for inspection and testing.
4. Design implement ,maintain and improve electrical instruments equipments and
systems for industrial purposes.
5. Inspect completed installation and observe operations to ensure conformance to
design and equipment specification and compliance with operational and safety
standards.
FROM MARCH 2O13 TO AUG 2014
MEC ENGINEERING COMPANY PVT
LTD
➢ ASISTANT ENGINEER ELECTRICAL
1.Operation and maintenance of
Electrical equipment and machinery
use at site.
FROM JULY 2012 TO MARCH 2O13
81MW POWER PLANT MALAKAND
PAKISTAN.
1. Voltage regulation in power house in different conditions (load or no-load).
2. Operation and maintenance of Excitation system of power house.
3. Installation and operation of SF6 breaker in switch yard.
4. Working Experience on 132 KV Switchyard.
PROFFESIONAL SKILLS
1.Study of drawings and execution of work.
2. Construction management and related services i.e work scheduling, monitoring and
controlling.
3.Conducting detailed design calculation and drawing of substation, switchyard, buildings
and ELV system , cable schedule and cable routing.
4. Maintain quality control procedures for installation of project.
5. Design , maintain, implement and improve project equipment.
6.Inspect completed portion of project to ensure confirmation with design standards.
7. Maintain and follow ISO standards.
8.Generating technical letters.
9.Installation and operation of all electrical system and equipment.
10.Provides technical advice to electrical staff as well as detailed engineering with safety factor in design.
11.Cable size calculation, its root selection, read and implement electrical plans on site done by electrical
design engineers, sometimes do necessary actions whether correct or improve the design.
LAGUAGE PROFECIENCY.
1.ENGLISH. 2.URDU. 3.PUNJABI. 4.PASHTO. 5.CHINES(Limited proficiency)
REFERENCES WILL BE FURNISH ON REQUEST.

Das könnte Ihnen auch gefallen