Beruflich Dokumente
Kultur Dokumente
Ref.Proced.
WORK MIZTON PROJECT SHORE APPROACH FOR THE OFFSHORE SEALINES INSTALLATION AND ONSHORE LINES INSTALLATION Report No.
CLIENT SAPURA / ENI CONTRACT Location of Reference Date:
Reference Standard / Acceptance Criteria: ISO 21809-3:2018 / ENI 20550 REV.2 LTE-ORF ORF-BSR BSR-ECO Sheet:
10
10
10
10
10
10
P-CD-10
GTS-PP-100-001
2019-02-20
1 of 1
cy 1 per 4 hr
Tr °C
Na
Na
anagement
ation date
8-09-17
8-08-24
y Detector
09-1 100%
Defect
25 kv
Format
Ref.Proced.
WORK MIZTON PROJECT SHORE APPROACH FOR THE OFFSHORE SEALINES INSTALLATION AND ONSHORE LINES INSTALLATION Report No.
CLIENT SAPURA / ENI CONTRACT Location of Reference Date:
Reference Standard / Acceptance Criteria: ISO 21809-3:2018 / ENI 20550 REV.2 LTE-ORF ORF-BSR BSR-ECO Sheet:
P-CD-10
GTS-PP-100-001
2019-02-21
1 of 1
ency 1 per 4 hr
Tr °C
Na
Na
Management
bration date
018-09-17
N / cm)
3LPP
9 Hrs
380 N / In @ 29.8°C
100% Cohesive
360 N / In @ 28.6°C
100% Cohesive
350 N / In @ 27.9°C
100% Cohesive
Format
Ref.Proced.
WORK MIZTON PROJECT SHORE APPROACH FOR THE OFFSHORE SEALINES INSTALLATION AND ONSHORE LINES INSTALLATION Report No.
CLIENT SAPURA / ENI CONTRACT Location of Reference Date:
Reference Standard / Acceptance Criteria: ISO 21809-3:2018 / ENI 20550 REV.2 LTE-ORF ORF-BSR BSR-ECO Sheet:
P-CD-10
SCAR-GUARD-001
2019-02-25
1 of 1
Management
bration date
Over Lap to 50 %
100%