Sie sind auf Seite 1von 1

PILE CAP

B B
Anchor Bolt will be as per approved
fabrication drawing of pole
75mm clear cover
from Spiral bar
concrete (cc) spacer
@ 1500mm c/c
with spiral bar.
C C
SECTIONAL ELEVATION OF PILE.
Revision Content Designed Approved Date
Employer Power Grid Company of Bangladesh Limited (PGCB)
Contractor
Project
Contract No. Date:
DESIGN OF PILE FOUNDATION FOR Soil
Title Category
2
Drawn Designed Checked Approved Date
Scale NTS Dwg. No.

Das könnte Ihnen auch gefallen