2 Clean Sand: what is the max % to be passed in no. 200 sieve? 10%
3 A geotechnical investigation as per SAES-A-113 is required for excavation depths greater than ------m
(6M)
4 General Fill Material shall consist of gravel, sand and/or marl. The maximum size of the fill
material shall be one-half the lift thickness or ------------mm), whichever is less. ( 75mm)
5 . The portion of Select Fill material passing the No. 40 sieve shall have a maximum liquid
limit of ----- and a maximum plasticity index of --------per ASTM D4318. ( 35 and 12)
7 Select sfill hall be used Within ------------- m of the bottom elevation of foundations, spread
footings, slabs-on-grade and pavements when fill is required to achieve final grade.( 0.6 m)
8 In no case shall compaction be allowed on slopes greater than ----- (V) to ------- (H)
.( 1V 5 H)
9 The moisture content of the material being compacted shall be within -------------, of the
optimum moisture content as determined by ASTM D1557. (+/- 3)
10 Tests shall be performed for Select Fill Material under all foundations, buildings and
process areas - one test every ----------- of each lift. (100 m2)
11 APCS-10 is not suitable for direct --------- and ---------- as per SAES-H-003 ( sunlight ,hydrocarbon)
14 What is the minimum strength of the concerete for S2 type exposure as per SAES Q-001
table 2 ( 32 MPa)
15 Minimum concrete cover in sulfur pits shall not be less than ---------- mm.( 75mm)
16 Saudi Aramco shall be notified before proceeding with repair if the defect is the following:
Depth is greater than ---------mm at the maximum point and surface area is greater than ------------
mm². (75 and 100,000)
17 The interval between concrete deliveries shall be such that no more than --------- minutes
interruption elapse during placement of a single foundation or slab, unless approved by
Saudi Aramco. (20)
18 Prime coat shall be tested prior to applications and every ------------- m².( 10,000mm2)
19 Asphalt shall be petroleum asphalt cement, penetration grade ---------, conforming to
Saudi Aramco Product Specification --------- (60-70, Product Specification A-970.)
21 Temperature of mixtures without sulfur shall be between ----°C and ---°C when it leaves
the plant and at least ------°C at the time of spreading and compaction at the site(.139°C
and 163°C /at least 139°C at site
22 The hot mix asphalt concrete shall be placed only when the ambient temperature is ------
or above, (4°C)
23 The nominal thickness of the compacted bituminous material shall not be more than ------
per layer.( 70 mm)
24 A minimum of five ------cores of randomly selected location shall be tested for each lot.
(5)
25 Saudi Aramco representative may reduce the required number of cores to three -----
cores per lot, for lots smaller than 1800 m².(3)
25 When the pavement construction involves two or more courses, successive courses
shall have an overlap of at least-------- mm.( 150)
26 Longitudinal construction joints shall fall within thirty -----centimeters of lane widths. (30)
27 Minimum 28 days compressive strength of cementaceous grout shall be ---MPA(34.5)
28 Cementitous grout shall be used rotating equipment if the RPM less or equal to------
Driver horsepower less than ------. And weight up to -------(3600, 500/373 kW, 2270 Kgs)
29 Total dissolved solids (TDS) for mixing and curing water shall not exceed ----(500 ppm.)
30 If the grout pour is -----or deeper, the grout manufacturer recommendations for installing
reinforcement rebars shall be followed.( 100 mm)
31 Expansion joints should be placed at approximately ------ intervals in the grout
foundation.( 1.2 m to 1.8 m)
32 A layered combination of non-shrink cement and epoxy grout may be used, as permitted
by SAES-Q-007 for large baseplates that have structural webs deeper than ----- mm.( 230)
37 Minimum strength of structural and non structural concrete ( 4000 and 2000)
38 Slump---- ( 150+/- 40) unit weight = 2400kg/m2 Air content = 2% Temp= 32 C
39 Total cylinder in trail mix =6 2 for-7d 2 for 28d for lab cured 2 for 28d for site
cured
40 Suphate content and chlorine content of curing and concrete mixing of water XXX
41 Concrete mix revolution up to site ( 300)
42- Concrete poring time from plant to site = 90 min.
42 Which Apce using for underground coating for concrete surface ( APCS-3 and 10)