III PRELIMINARIES 13

(c) General Matters (continued)


CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
12. Pneumoconiosis Levy 1. Payment of the levy 1. Payment will be made Item
legally demandable collectively for the whole
under the Contract by the Main
Pneumoconiosis and Contractor, but in both
Mesothelioma the Main Contract and
(Compensation) Sub-Contract
(Assessment of Levy) Preliminaries Bills it
Regulations should be stipulated that
the Sub-Contractors will
bear the levies applicable
to the Sub-Contract
works.
13. Setting Out 1. Setting out the Works Item
and provision of all
instruments and labour
required by the Architect
for checking this work
14. Foreman Contractor’s 1. General foreman Item
Site Management Team Construction manager
and his site management
and supervisory team’s
attendance on the Works
15. Protection of Public 1. Maintenance and Item
Property etc. protection of public
property, adjoining
properties, existing
slopes, roads, footpaths,
trees, shrubs and
property services of the
Public Utility Companies
and the making good of
or paying for the making
good of all damage
thereto
16. Sub-Letting 1. The conditions under Item
which the Contractor
may sub-let portions of
the Works.
17. Artists or Tradesmen 1. Permission for execution Item
not Sub-Contractors of work by Artists or
Persons or Specialist Tradesmen persons or
Contractors engaged Specialist Contractors
by the Employer who are not Nominated
Sub-Contractors and
who may be engaged by
the Employer.
(c) General Matters (continued)
CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
18. Injury to Persons and 1. Responsibility of the Item
Damage to Property Contractor for injury to
persons and damage to
property including public
or private roads

19. Insurances, etc. 1. Insurances against or Item


allowances to be made
Requirements in respect
of the following
insurances are given:
(a) Fire and extraneous
perils Contractors’ all
risks insurance of the
Works
(b) Injury to persons and
property Third party
liability insurance
(c) Workmen's
Employees’
compensation insurance
(d) Any other items of
insurance or guarantee
required by the
Conditions of Contract or
the Employer
2. Special requirements in
respect of minimum
acceptable limits of
liability and excesses are
stated.
3. Where insurances are to
be extended to cover
professional fees,
particulars are given.

14
III PRELIMINARIES 15

(c) General Matters (continued)


CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
20. Provisional and Prime 1. Provisional and Prime Prov'l 1. Where the cost of
Cost Sums Cost (P.C.) Sums and Sum cartage, unloading,
the method of adjustment storing and returning
------- packing material is to be
P.C. included in the sum, it is
Sum so stated.

21. Conditions of Payment 1. Conditions of payment Item


22. Surety or Bond 1. Any surety or bond Item
required by the Employer

23. Watching 1. Care of the Works Item


generally, employment of
watchmen and protective
lighting
24. Protection 1. Protection of the work Item
and materials from
weather
2. Casing or covering up
and protecting
25. Treasure, Trove, 1. Disposal of any treasure Item
Coins, etc. Antiquities trove, coins or objects of
antiquity
26. Variations and Method 1. Particulars relating to Item
of Measuring and variations and the orders
Valuing for and method of
measuring and valuing
the same
2. Particulars relating to
dayworks accounts
27. Samples 1. Submission of samples Item

28. Testing of Materials 1. Conditions relating to the Item


testing of materials
(c) General Matters (continued)
CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
29. Removal of Water 1. Keeping the site and all 1. Water levels, where Item C.1 applies. S.1 Dewatering
excavations thereon free known, are stated. requirements, where not
from storm and at the discretion of the
percolating water by Contractor.
pumping or otherwise,
including any necessary
temporary drainage and
disposal of water
2. Where springs or running Prov’l
water are likely to be Sum
encountered.
-------
Prov’l
numb
er of
pump
ing
hours

30. Water 1. Water for the Works, Item 1. If made available by the C.1 applies.
including that for Employer, details and
Nominated Sub- conditions are stated.
Contractors, Specialist
Contractors employed by
the Employer, statutory
undertakers and utility
companies and any
necessary temporary
plumbing and storage
31. Lighting and Power 1. Lighting and power for Item
the Works, including that
for Nominated Sub-
Contractors, Specialist
Contractors employed by
the Employer, statutory
undertakers and utility
companies and any
necessary temporary
wiring and meters

16
III PRELIMINARIES 17

(c) General Matters (continued)


CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
32. Attendance 1. General attendance of Item M.3 For general attendance
one trade upon another upon Nominated Sub-
2. General attendance upon Contractors; and upon
Nominated Sub- Artists and Tradesmen
Contractors Specialist Contractors
are given, including
3. General attendance upon particulars of any
and cutting away for and unloading, storing,
making good after Artists clearing away rubbish
or Tradesmen Specialist and the like, protecting,
Contractors engaged by cutting away for and
the Employer for work making good and other
not forming part of the facilities to be afforded
Contract by the Contractor.
4. Special attendances, 1. Special scaffolding Item M.4 Any other Main
details stated 2. Access Roads Contractor's work in
connection with
3. Hardstandings Nominated Sub-
4. Hoisting, lowering and Contractors, and upon
positioning of plant or Artists and Tradesmen
materials Specialist Contractors is
5. Special supply of power measured in detail or
covered by Provisional
Sums.
33. Hoardings, etc. 1. Provision of hoardings, 1. Providing and erecting Item 1. Any special requirements C.1 applies. S.2 Design details, where
fans, planked footways, 2. Taking over existing and are described and the not at the discretion of
guard rails, gantries, repairing as necessary conditions regarding the Contractor.
lighting and the like as advertising rights are
may be required 3. Maintaining, duration stated.
stated
4. Adapting, details stated
5. Clearing away and
making good all works
disturbed
(c) General Matters (continued)
CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
34. Works by Public 1. Works to be carried out
Authorities by Government
Departments, or Public
Utility Companies
statutory undertakers
and utility companies
which are dealt with by
means of Provisional
Sums, e.g.:
(a) Taking up and
relaying the paving of
public roads and
footpaths
(b) Forming permanent
crossings
(c) Connections with to
water, gas, electric mains
and the like
35. Temporary Roads 1. Temporary roads and 1. Providing and Item C.1 applies. S.2 applies.
crossings where required constructing
with all relevant 2. Taking over existing and
particulars repairing as necessary
3. Maintaining, duration
stated
4. Adapting, details stated
5. Clearing away and
making good all works
disturbed
36. Drying the Building 1. Provision of fuel and Item
attendance for drying the
building, if required
37. Removal of Rubbish 1. Removal of rubbish and Item
debris, clearing up and
cleaning
38. Defects after 1. Making good defects Item
Completion appearing within the
Defects Liability Period,
and the extent of such
period
39. Co-ordination of 1. Co-ordination of Item
Services services, one with the
other and with the Main
Contract works