Air pipe interface

(with self-locking fast connector)


Cooling Blower:suggest to place it
outside with rain proof shed Blower
400V power access box

(Please use the above types of circuit breakers)

Building requirement:
1.Flatness:1.5mm/m
2.Ground bearing:400kg/m 2
Control
Cabinet 3.Door width is greater than 1.5 meter.
4.Door height is greater than 2.5 meter.

Power supply for vibration 3 phase,5 lines(wire section area 16mm2),400V,150A air switch
Total power:75KVA

Air supply:0.6~0.8MPa(airflow:0.6L/min)
(Machine port:8mm air pipe,with self-locking fast connector)
PC system
Notice:Must be grounded independently,grounding resistance less than 4 ,grounding wire
section area 6mm2
If the power supply voltage changes greatly> 40
self-regulating device.

Occupied area: about 29m 2

LABTONE TEST EQUIPMENT CO.,LTD


Site Planning

Model EV240H1010
Drawer HYH Date 2018-11-30
Reviewer KIM Date 2018-11-30 Material Weight Quantity
Approver JIANG Date 2018-11-30 Scale
reserved hole

vibration isolation ditch


Prepared by user:
Floor Layer
Ground screw GB799-86 M24X500
Hex nut GB1229-91 M24
Brick layer
Flat washer GB95-86
Box type steel bar

Base layer

Cobblestone

Technical requirements:
1. As shown in the drawing, dig the pit, then put some cobblestones of
vibration isolation underlying material into the pit. (Proportion of coarse,
medium, thin: 1 : 2 : 3).
2. Pouring the base layer according to the drawing.
3.Filling the vibration isolation ditch with slag& sawdust and fine sand
(proportion 1.5 : 1 : 1).
4.
pouring.
5.Irrigate waterproof coating with thickness of 3-5 mm.
6.Flatten the top of the isolation ditch with a plank (or iron plate) of width 300
mm and thickness 50 mm.
7.The specific dimensions of the secondary pouring holes are determined by
the outline drawing.
8.The ground shall be measured with a gradienter to ensure the ground level
is under 1/1000.
9.Place the ground screws into the ground screw holes of the machine and
tighten it with hexagonal nuts. Fill cement in the reserved hole of the cement
foundation and tamping it, and then cement is applied around the foundation
to keep it level with the floor. Fill the gap between the foundation and the
vibration machine when filling pouring cement.
10.The drawing is for reference only.

LABTONE TEST EQUIPMENT CO.,LTD


FLOOR FOUNDATION

Model EV240H1010
Drawer HYH Date 2018-11-30
Reviewer KIM Date 2018-11-30 Material Weight Quantity
Approver JIANG Date 2018-11-30 Scale