Sie sind auf Seite 1von 4

April 30,2018/ Monday

Today was my first day of Work Immersion in Dinalupihan Water District (DWD).Ms. Arleera

asked me to recomputed the water bill by simply multiplying the unit cost and the quantity cost. After

that I sorted and arranged the files alphabetically then I put those files in white folder. Lastly, I also use

Xerox machine for photocopy.

May3,2018/Thursday

My groupmates and I was rearranged the files in order to easily get the files if it’s needed. It

was very hassle but then we did it and made to finished it. I use again the xerox machine for

photocopying the other files. After that I observe them while their working. The 2 nd day of my Work

Immersion was done peacefully.

May 4,2018/Friday

My last day of Work Immersion in Dinalupihan Water District (DWD).Madam Encee

give me a task to cut the receipt of water bill and arrange it from least to greatest number that

written on it.I abide the task and after that I use again the xerox machine for photocopy.I also

observe them while they are working .

May 5, 2018/Saturday

I was deployed to work at Bataan Peninsula Medical Center (BPMC). I was assigned in

Admitting/Information Area were I met the clerk there. I say “Good morning ma’am and Sir to

the people who passing by in our area. The first task is filing the patient’s record. Second is
arranging it alphabetically and we also sorted the files. I also give a try caling the health

insurance to get the approval number like DCC. Lastly I observe the staff while they’re working.

May 6, 2018/Sunday

Today was my second day in Bataan Peninsula Medical Center (BPMC). Asual we

always greet the people or even patient. In the morning, we categorized the files again according

to their surname and we remove the extra paper in the files. After that, we arrange it..We finished

it exactly 12:00pm .I also experience observing on how to do the hearing test for new born baby.

May 12,2018/Saturday

This was my third day on work immersion in BPMC. We always greet the people

“Good morning and Good afternoon.” We used to arranged again the files alphabetically. After

that I try to call again the health insurance agency to get the approval number .I also stamp the

files for serial number .

May 13,2018/Sunday
Today was my fourth day of work immersion in Bataan Peninsula Medical Center

(BPMC).My first task is sorting the files date by date then I arrange those files and put it inside

the box. I also call the health insurance to get the approval number of the patient .Lastly, I

observe them while their working

May 17, 2018/Thursday

Today was my last day of work immersion in BPMC. This time is I assign in

Ultrasound because the nurse there need an OJT. My first task there is separate the carbon paper

and put it inside the box. After that I refill the bottles of ultrasound gel. I also cut the paper
.Furthermore, I observe the doctor or sonologist doing an ultrasound. It’s very interesting. In the

other way I go back again to admitting because I finished all the task given to me in ultrasound

area. I arrange again the files and stapler it. I decided to have an overtime because I like it.

Figure 12: Work Immersion in Caritas

May 18, 2018/Friday


Taoday I was deployed in Caritas Health Shield .We don’t do anything we just observe

the staff while they’re working.

Figure 13: Work Immersion in Philippine National Police (PNP)


May 20,2018/Sunday
Today was my last day of advance work immersion. I designated at PNP. We

don’t do anything here. They don’t give us a task.We’re just observing them.

Das könnte Ihnen auch gefallen