PP-CI-CC-005
Attachment 1
Foundation Work Flow Diagram START
NO CHECK BY
CONTRACTOR
YES
EXCAVATION
SOIL COMPACTION
BELOW FOUNDATION
NO CHECK BY
CONTRACTOR (*)
YES
CONCRETE QUALITY
CHECK
NO CHECK BY
CONTRACTOR (*)
YES
CONCRETE PLACING
NO CHECK BY
CONTRACTOR
YES
FORMWORK REMOVAL
NO CHECK BY
CONTRACTOR
YES
GROUTING WORK
NO CHECK BY
CONTRACTOR
YES
(*) COMPANY INSPECTION POINT
FINISH
Foundation and Anchor Bolt Setting
PP-CI-CC-005
Attachment 2
SKETCH :
THE ABOVE EQUIPMENT HAS BEEN SET, LEVELED AND ALIGNED, AND CAN BE GROUTED INTO FINAL POSITION.
REQUEST GROUT TO BE PLACE BY: ___________________________________________________________________________
DATE : __________________________
GROUT PLACEMENT
(TO BE COMPLETED BY RESPONSIBLE CIVIL ENGINEER)
TYPE OF GROUT: QUANTITY:
PLACEMENT METHOD:
REMOVED, POCKET FILLED WITH DRY PACK DATE OF COMPLETION FINISHING & CURING:
SHIMS
LEFT IN PLACE, COVERED WITH GROUT
SKETCH: