Issues and Concerns 1.) Site Development Equipments or contractor to do the site development 2.) Powerhouse Installation of doors Punchlisting Can start Painting first week of April 2019 3.) Trusses Joint Survey with PEB Steel and PBDC /Gensteel Foundation design for temporary support. Presentation to owner. 4.) Laydown Area/ Staging Grass Cutting/Roller Area 5.) Materials Rebar- On going deliveries Cement – with balance for delivery. Phenolic- Critical/Stock on site (150 pcs)– with balance for delivery. 6.) MEPF Contractor Mechanical
7.) Slab on ground FDT
Soil Poison Gravel Walk behind from Mataas na Kahoy Can start first week of April or upon delivery of behind 8.) Chain Block For follow-up