TABLE OF CONTENTS

A.) Pouring Schedule


 3rd Floor Slab
 3rd Floor Inclined Column
 4th Floor Beams & Girder
 4th Floor Inclined Columns
 Media Room
 VIP Room

B.) Progress Photo


 Coliseum
 Powerhouse
 STP
 MEPFS

C.) Accomplishment Report

D.) MEPFS Equipment Status


Issues and Concerns
1.) Site Development  Equipments or contractor
to do the site development
2.) Powerhouse  Installation of doors
 Punchlisting
 Can start Painting first
week of April 2019
3.) Trusses  Joint Survey with PEB Steel
and PBDC /Gensteel
 Foundation design for
temporary support.
 Presentation to owner.
4.) Laydown Area/ Staging  Grass Cutting/Roller
Area
5.) Materials  Rebar- On going deliveries
 Cement – with balance for
delivery.
 Phenolic- Critical/Stock on
site (150 pcs)– with balance
for delivery.
6.) MEPF Contractor  Mechanical

7.) Slab on ground  FDT


 Soil Poison
 Gravel
 Walk behind from Mataas
na Kahoy
 Can start first week of April
or upon delivery of behind
8.) Chain Block  For follow-up

9.) Gas & Fuel (Petron)  For follow-up