Konsultan REPUBLIK INDONESIA

PT. Konsindotama Persadaloka DEPARTEMEN PEKERJAAN UMUMPembangunan Jalan Simp. Haru - Batas Kota Padang
DIREKTORAT JENDERAL BINA MARGA

Tanggal Test : 05 April 2008


Kontraktor Requested Of Cold Bin Material Jns Pekerjaan :
PT. L M K P From Capacity A. M. P Jns Material : Hot Mix AC - Base
Lokasi :

Batching Proportion With Capacity 800 kg

Percent Opening
No. Type Of Material
By Weight Gate
Cold Bin ( mm )
Of Mix ( % ) ( cm )

Cold Bin I Abu Batu ( 5 - 0 mm ) 37.84 5

Cold Bin II Medium ( 13 - 5 mm ) 28.38 10

Cold Bin III Split ( 19 - 13 mm ) 18.92 7

Cold Bin III Split ( 38 - 19 mm ) 9.46 13

Catatan :
Total Batch Weight Of Asphalt Mix = 800 kg/batch

Approved By, Checked By, Tested By,


Bina Marga Konsultan Kontraktor

Tgl Tgl Tgl


Konsultan REPUBLIK INDONESIA
PT. Konsindotama Persadaloka DEPARTEMEN PEKERJAA
DIREKTORAT JENDERAL BINA

Kontraktor Requested Of Cold Bin M


PT. L M K P From Capacity A. M.

Batching Proportion With Capacity 800 kg

No. Type Of Material

Cold Bin ( mm )

Cold Bin I Abu Batu ( 5 - 0 mm )

Cold Bin II Medium ( 13 - 5 mm )

Cold Bin III Split ( 19 - 13 mm )

Cold Bin III Split ( 38 - 19 mm )

Catatan :
Total Batch Weight Of Asphalt Mix = 800 kg/batch

Approved By, Checked By,


Bina Marga Konsultan

Tgl
PUBLIK INDONESIA
EN PEKERJAAN UMUMPembangunan Jalan Simp. Haru - Batas Kota Padang
AT JENDERAL BINA MARGA

Tanggal Test :
ed Of Cold Bin Material Jns Pekerjaan :
m Capacity A. M. P Jns Material :
Lokasi :

Percent Opening

By Weight Gate

Of Mix ( % ) ( cm )

37.88 15

28.41 13

18.94 9

9.47

t Mix = 800 kg/batch

Checked By, Tested By,


Konsultan Kontraktor

Tgl Tgl