SITA RAMA LIFT IRRIGATION PROJECT

DISTRIBUTARY PACKAGE No.-7


PALAVAGU CANAL

CALCULATION OF OT SILL LEVEL

Design of off take for 27 L @ Km. 6.550 On Palavagu Canal Of SRLIP.


I Design:
Gross command area = 458.000 Ac
Duty adopted = 100 A/c
Discharge required = 458.000 100 = 4.580 cusecs
Add 20% Losses 0.916
5.496 cusecs
Discharge of O.T channel = 0.156 Cumecs
Design of canal Section for various discharge conditions
Main canal Units O.T channel
Description Full 3/4 Suply Full

Discharge 16.73 12.55 cumecs 0.156


Bed width 8.00 8.00 m 0.80
Depth 2.20 1.900 m 0.45
Side slopes 1.50 1.50 1.50
Bed fall 8000 8000 5000
Rugosity coefficient 'n' 0.023 0.023 0.023
Wetted area A=(B+nD)D 24.86 20.62 sqm 0.664
Wetted perimeter P=(B+2*1.803*D) 15.93 14.85 m 2.423
R= A/P 1.56 1.39 m 0.274
R2/3 1.35 1.24 0.422
V =1/n*R2/3*S1/2 0.668 0.62 m/sec. 0.265
Designed Discharge A*V 16.619 12.75 cumecs 0.176
V0 = 0.39*D0.55 0.60 0.56 m/sec. 0.251
Critical velocity V/V0 = 1.11 1.11 1.05
B/D Ratio 3.64 4.21 1.778
Free board 0.75 0.75 m 0.30
CBL 265.353 265.353 m 266.653
FSL 267.553 267.253 m 267.103
TBL 268.303 m 267.403
G.L 271.648 271.648 m
II Sill Level of O.T
3/4 Supply Condition
Minimum Driving Head = 0.150 m
The sill levels are fixed considering 3/4 FSL condition in the parent canal

3/4 supply Level in Main Canal = 265.353 + 1.900


= 267.253 m
Rear full supply Level Of OT = 3/4 FSL parant canal - Minimum Driving Head
= 267.253 - 0.150
= 267.103 m
Canal bed Level Of OT = Rear FSL Of OT - FSD Of OT
267.103 - 0.45
= 266.653 m
Sill level = 266.653 m