This document calculates the off take sill level for an irrigation project. It provides the design details like command area, discharge requirements, canal dimensions, and bed levels. The sill level is calculated to be 266.653 m based on the 3/4 supply level in the main canal, minimum driving head, and freeboard in the off take channel.
This document calculates the off take sill level for an irrigation project. It provides the design details like command area, discharge requirements, canal dimensions, and bed levels. The sill level is calculated to be 266.653 m based on the 3/4 supply level in the main canal, minimum driving head, and freeboard in the off take channel.
This document calculates the off take sill level for an irrigation project. It provides the design details like command area, discharge requirements, canal dimensions, and bed levels. The sill level is calculated to be 266.653 m based on the 3/4 supply level in the main canal, minimum driving head, and freeboard in the off take channel.
Design of off take for 27 L @ Km. 6.550 On Palavagu Canal Of SRLIP.
I Design: Gross command area = 458.000 Ac Duty adopted = 100 A/c Discharge required = 458.000 100 = 4.580 cusecs Add 20% Losses 0.916 5.496 cusecs Discharge of O.T channel = 0.156 Cumecs Design of canal Section for various discharge conditions Main canal Units O.T channel Description Full 3/4 Suply Full
Discharge 16.73 12.55 cumecs 0.156
Bed width 8.00 8.00 m 0.80 Depth 2.20 1.900 m 0.45 Side slopes 1.50 1.50 1.50 Bed fall 8000 8000 5000 Rugosity coefficient 'n' 0.023 0.023 0.023 Wetted area A=(B+nD)D 24.86 20.62 sqm 0.664 Wetted perimeter P=(B+2*1.803*D) 15.93 14.85 m 2.423 R= A/P 1.56 1.39 m 0.274 R2/3 1.35 1.24 0.422 V =1/n*R2/3*S1/2 0.668 0.62 m/sec. 0.265 Designed Discharge A*V 16.619 12.75 cumecs 0.176 V0 = 0.39*D0.55 0.60 0.56 m/sec. 0.251 Critical velocity V/V0 = 1.11 1.11 1.05 B/D Ratio 3.64 4.21 1.778 Free board 0.75 0.75 m 0.30 CBL 265.353 265.353 m 266.653 FSL 267.553 267.253 m 267.103 TBL 268.303 m 267.403 G.L 271.648 271.648 m II Sill Level of O.T 3/4 Supply Condition Minimum Driving Head = 0.150 m The sill levels are fixed considering 3/4 FSL condition in the parent canal
3/4 supply Level in Main Canal = 265.353 + 1.900
= 267.253 m Rear full supply Level Of OT = 3/4 FSL parant canal - Minimum Driving Head = 267.253 - 0.150 = 267.103 m Canal bed Level Of OT = Rear FSL Of OT - FSD Of OT 267.103 - 0.45 = 266.653 m Sill level = 266.653 m