Sie sind auf Seite 1von 23
B008_RO APPLICA ALE FOR hokARON foe Reftrnen pur pre INSTALLATION DETAILS FOR SUPPORT SYSTEMS iso APPLCABLE. FoR | 2600 MW KODERAMA.& DURGAPUR TPS METAL CHANNEL BOLTABLE CABLE TRAY ee eer ra NAME] SIGN. [DATE INSTALLATION DETAILS FOR t ANN Mera aie oes hoe PROJECT 2x500MW MEJIA~B TPS osen [KG ” | ee Ii os 08! ‘CUSTOMER DRG. NO. ano fee” mono. | pre. No. PE-DG-270-507-E006 REV. No.| 0 [APO sxe. G3. 08.08.08] rr BHARAT HEAVY ELECTRICALS LIMITED PROJECT ENGINEERING MANAGEMENT NOIDA SHEET 1 OF 23 4S coe ae ee INDEX SHEET NO | INSTALLATION DESCRIPTION OF INSTALLATION DETAL DETAIL TYPE oF = THLE SHEET 02 = INDEX os = TWICAL SUPPORT SYSTEM ELEMENTS oF = TYPICAL SUPPORT SYSTEM ELEMENTS: o5 3B). S6D, SST. SNGLE_ CHANNEL SUPPORT INSTALLATION. TRAYS ON SINGLE SIDE, 88: TH_ENDS_ Fe LY TOP END FIX r S53, SSa, S55, SINGLE. CHANNEL SUPPORT INSTALLATION. TRAYS ON SINGLE SIDE, BS. ONLY BOTTOM END FIXED _/ BOTH ENDS FIXED. o7 DBT, OBZ, DBS] DOUBLE CHANNEL SUPPORT INSTALLATION, TRAYS ON BOTH SIDE, B84’ BOTH_ENDS FIXED. oe DS1. 052, O53] DOUBLE. CHANNEL SUPPORT INSTALLATION TRAYS ON SINGLE7BOTH SIDE, 08a. [ONL (TOP END FIXED. 08 085 O56, OST}OOUBLE CHANNEL SUPPORT INSTALLANON, TRAYS ON SINGLE/BOTH SIDE, 088 JONLY BOTTOM END FIXED 10 ‘OH TYPICAL TRAY SUPPORT ARRANGEMENT ALONG PIPERACK UPTO 3 TRAYS mn one [AGAL TRAY SUPPORT ARRANGEMENT ALONG PIPE: CK WORE THAR 12 ov FTYPICAL. VERTICALLY ORIENTED TRAY SUPPORT ARR: AGEMENT ALONG] PIPERACK TRAYS SUPPORTED FROM TOP 3 ove TyBICA VERTICALLY ORIENTED TAY SUPPORT” ARRANGEMENT ALONG —] PIPERACK TRAYS SUPPORTED FROM SIDE 14 ori, cia [TYPICAL DETAILS FOR CROSS TRAYS OVER TRESTLE 5 PT, PM2 | TYPICAL TRAY INSTALLATION AROUND PORTAL MEMBER ON PIPERACK 16 CRY, CRD NEL_ FRAWE WOR Upto. 3 Teas. OETA FOR ADDITONAL SUPPORT 10. RiseR COLUMN. 7 ers TYPICAL CHANNEL FRAMEWORK FOR CABLE TRAY RISER UPTO 3 TRAYS, DETAIL FOR ADDIMONAL SUPPORT TO RISER COLUMN 8 ora [PICAL CHANNEL FRAME WORK FOR CABLE TRAY RISER WORE THAT] 5, 19 BB]. B52, BES{SUPPORTING ARRANGEMENT BELOW IBEANS7 W. BOX/ WELDED BEAMS 20 BC}, BCo, BCS mi 8G}. REZ BCS |SUPPORTING ARRANGEMENT ALONG BOLER COL, ABOVE aWnTHIN' (-BEANS 2 TRI, TR [SUPPORTING ARRANGEMENT IN CABLE TRENCH Wz TRS, TRA /SUPPORTING ARRANGEMENT IN CABLE TRENCH 2 = (GENERAL NOTES TION 01 TAL CI ‘2xS00MW MESIA-B TPS Da. No. Al . PE-DG-270-507-E006 REV. 0 |SHEET 02 OF 23} a6 VERTICAL cupeort _(SC1 Chawner) Et TRAY Wott 1 ‘BOLTS (ia) 1 WITH WASHER, i i f CABLE TRAY PAN HEAD, “ ‘Z NO \ gece pute Mi2 SPRING NUT M6 NUT with LONG SPRING CANTILEVER ARM (CAI /CA2/CA3/Ca4) TYPIC |_ASSEMBLY_OF CHANNEL ‘SUP ‘ORTS AND CABLE TRAY ANGLE PIECE 40e40x6THK L HOLES, 4mm’ DA t HOLES, 14mm’ DA 2 HOLES: Fm OTA, BASE PLATE FOR DOUBLE CHANNEL (822) SECUON OF Sci {SINGLE CHANNEL) SECTION OF DC1 HANNI Gag (FOR 1S0W TRAY) (SEE NOFE x1) damm oth HOLES: CAI (FOR 600W TRAY) a] Ez (FoR som TRA {| e254 Soom trav) 3 HOLES 14 DIA CHA MP 2, HOLES ts"DA oF EE NOTE vil) 2XS00MW MEJIA-B TPS DRG. No, ‘PE-DG~270-507-B006

Das könnte Ihnen auch gefallen