Project: SADAF.
Company: HADI HAMAD AL HAMMA(SHUTDOWN)
Position: MECHANICAL INSPECTOR/WELDING INSPECTOR
Duration: (FEB TO MARCH)
Project: SASRIF
Company: HADI HAMAD AL HAMMA(SHUTDOWN)
Position: MECHANICAL INSPECTOR/WELDING INSPECTOR
Duration: (2ND JAN TO 28TH JAN)
CURRICULUM VITAE
Project: SipChemp.
Company: BISCO (SHUTDOWN)
Position: MECHANICAL INSPECTOR/WELDING INSPECTOR
Duration: (Nov TO DEC)
JOBS RESPONSIBILITIES
Supervisor in plant service for Scaffold erection to access tube bundle pulling work &
blinding & de-blinding work and remove pipe insulation for blinding work.
Line to be isolated, drain and purge the system ready to blinding.
Blinding work before pipe spools are removed.
Removal of channel head spools and shell side spools.
Removal of channel cover, channel head, shell cover and floating head.
Dis-assemble backing device & Pull out tube bundle and send it to cleaning yard at site.
Cleaning tube bundle by hydro jetting & Shell side internal cleaning at site.
Shell side visual inspection & repair tubes (if found damages).
Send tube bundle back to site & reinstate tube bundle.
Install back channel head, channel cover, backing device.
Perform tube side leak test and Shell Side for Hydro test.
Witness the Hydro testing and sign the reports.
Supervising all the hydro test activities for all thee equipment’s and lines
Install floating head, shell cover, conduct shell side leak test.
Reinstate channel outlet pipe spool.
Bolt Torqueing on shell & tube side flanges.
De-blind as per blind list and sign off in flange check list.
Reinstate piping insulation and Dismantle scaffold.
Housekeeping work around job site area.
Raising and closing of proactive, standard violations and internal NCR, s of their concerned areas,
Coordinate with site construction team on any quality issues,
Familiar with International codes such as ASME 31.3, 31.4,31.8, 16.5, Sec V & IX, API 510,570&
653 etc.,
Preparation of All documents related from start to close out the job including from Material
Receiving, fabrication, installation, coating, testing & As Built (As per Applicable Standards),
Checking of material specification as per IFC MTO & Isometrics,
Selection of Suitable welding Consumables as per WPS Specifications,
Checking of fit‐up and co‐ordinates of spool joints in erection work as per isometrics & Checking
of various supports fabrication and installation is as per standard support specifications,
Inspection of all welding activities prior, during and after, which include material check,
qualifications and calibrations of welding equipment’s,
Inspection & Preparing of daily welding reports and all related documents,
Witnessing of welder qualification test and WPQR, issuing of welder qualification cards,
Maintaining data base of welder qualification cards,
Closely Monitor the performance of welders, repair of welds, analyses the causes and initiate
preventive and corrective actions,
Monitoring weekly and monthly welder’s performance,
Conducting & coordinating of NDT (PT/MT/UT/ RT) on welded joints as per NDT plan & given
specifications,
Conducting tool box meetings for welders for safety as well as quality concepts,
Interpretation of radiographs as per codes & standards,
Monitoring & Review of Preheat/Post heat (PWHT) of piping joints,
CURRICULUM VITAE
Make sure that activities are done in accordance with standard codes of practice, drawings,
applicable job specifications, Quality control procedures (QCP), and Inspection and Test plan (ITP)
at the job site.
Strict follow-up of the implementation of approved ITP.
Assist in preparing Quality Procedures and Test Packages.
Prepare weld mapping of isometric drawings and dimension check of completed spools.
Reviewing piping isometrics drawing and details. Check all weld sizes, profile and locations.
Verify heat number, inspection during fabrication and erection such as pipe cut length, edge
preparation, fit-up, branch connections, flanged joints, valve connections, bending and forming,
hot adjustment, bolt, nuts, washer, gasket and tolerances cleaning requirements.
Inspection of Structural supports as per Isometric Drawings.
Clearing of punch/snag list and inspection release note.
Preparation and Client approval of Hydro test packages.
Witnessing of Hydro test of Piping, valves as required along with the client Inspector.
Co-ordinate with construction, testing group and QC department in the preparation of the
requirements of each test pack. Hydro testing and facilitate close out of any outstanding punch
items before and after Hydro test.
Visual Inspection and Hydrostatic/Pneumatic Test witnessing of valves at vendor shops.
Monitor welder performance, weekly repair rates, and lot and penalty control.
Monitor storage and handling of welding consumables like low hydrogen electrodes.
Attend RFIs as per the ITP in each stage of fabrication or installation.
Coordinate NDTs, PMIs, PWHTs, & Hardness tests and review the results as per required
standards.
Carrying out Inspection on Piping and Pipelines for orientation, bolt tightening, gasket
verification, spool verification etc. with relevant engineering drawings & specs
ORGANIZATION: TASNEE
DURATION: JUN;2017 TO AUG: 2017
CLIENT: TASNEE
PROJECT: PDH (MAJOR TURN AROUND)
POSITION: MECHANICAL QC
JOBS RESPONSIBILITIES
Supervisor in plant service for Scaffold erection to access tube bundle pulling work &
blinding & de-blinding work and remove pipe insulation for blinding work.
Line to be isolated, drain and purge the system ready to blinding.
Blinding work before pipe spools are removed.
Removal of channel head spools and shell side spools.
CURRICULUM VITAE
Removal of channel cover, channel head, shell cover and floating head.
Dis-assemble backing device & Pull out tube bundle and send it to cleaning yard at site.
Cleaning tube bundle by hydro jetting & Shell side internal cleaning at site.
Shell side visual inspection & repair tubes (if found damages).
Send tube bundle back to site & reinstate tube bundle.
Install back channel head, channel cover, backing device.
Perform tube side leak test and Shell Side for Hydro test.
Witness the Hydro testing and sign the reports.
Supervising all the hydro test activities for all thee equipment’s and lines
Install floating head, shell cover, conduct shell side leak test.
Reinstate channel outlet pipe spool.
Bolt Torqueing on shell & tube side flanges.
De-blind as per blind list and sign off in flange check list.
Reinstate piping insulation and Dismantle scaffold.
Housekeeping work around job site area.
RESPONSIBILITIES.
RESPONSIBILITIES.
Internship Training.
1. FACT (The Fertilisers And Chemicals Travancore Ltd.)-gone through Mechanical Workshop and had
a detailed study on Ammonia Complex Maintenance & Acid Maintenance.
2. APOLLO (Apollo Tyres Ltd.)-studied about the manufacturing process of different types of Tyres.
Key skills:
Primarily in the OIL& Gas Field Petrochemicals, Refinery and Power & Water Plant projects, Currently
working in Kingdom of Saudi Arabia Responsible to oversee & manage all aspects of QA/QC for the
multi discipline construction, Production, precommissioning, mechanical completion and ready for start
up of the plants.
Also responsible for defining and developing Strategies and plans to ensure compliances with Established
Codes, Standards, Working as QA/QC Engineer Reporting to manager of Company.
Review applicable standard and Specification , Subcontractor’s / Supplier’s Quality documentation
Including welding Procedure , NDE procedure and ITP’S in order to ensure the effective Quality
Management on site QC inspection and testing activities .
Knowledge of various international codes and standards - ASME Sec II, IX, VIII Div.1 ASME
B31.3.ASME B 16.5, and API570,API 510, API 578.
CURRICULUM VITAE
Supervising all QC Inspector for job responsibility and monitoring arranging stage wise inspection in order
to implement the Quality.
Coordinate with Consultant and Client in all Quality activities as required for project.
Supervise construction contractors during the execution of construction activities at the construction sites.
Supervise and approve construction activities & co-ordinate various aspects of project construction
including inspections, materials submission and work drawing from contractors, processing documentation
as required.
Ensures that the quality of material used in construction, and the quality of all equipment installed is in
accordance with project specifications.
Ability in man management & motivation & safety leader ship.
Review plan and drawing in accordance with specification, code and standard.
Monitor daily discipline activities and verifies compliance to project procedures specifications.
Preparation of Non Conformity Report (NCR) Corrective Action Required (CAR).
Monitoring the arrangement of RFI for client to witness the activities.
Coordinating with client for acceptance of activities.
Resolution of quality problems.
Liaison with the client on quality related matters.
Conduct weekly Look ahead Meeting with Top Management.
Monitoring Punch listing for completion of work.
Monitoring Test Pack related to the projects as per system.
Coordination with Foreman/ Subcontractor regards to their daily activities.
Ensure safety practices on site as well as observe and resolve safety problems.
Report specific activities in daily and weekly reports.
Inform Group leader about any technical problems that may arise at site to avoid delaying of working
schedule.
Interface with other departments: Engineering, QC, and Civil Construction.
Record equipment installation pumps, compressors, Air Dryers, Filters, heaters, tanks, Heat-exchangers
etc.
Attend meetings and advise Subcontractor the priorities to be taken into consideration.
Attend internal meeting with other Discipline (if required) for matters to be clarified.
Monitor work progress in accordance with their submitted work schedule.
Keep an evidence of the progress and report to the manager.
Coordinate piping fabrication activities for shut down activities.
Coordinate piping spools pressure tests.
Coordinate piping installation according to the refurbishment schedule.
Check the piping NDT status as per needs.
Coordinate the Hydro Test, Flushing, mechanical completion etc.
Check the painting and insulation status as per schedule & Specification.
Commissioning, start up and Hand over to the client according approved procedures.
Executing all activities in line with current health and safety standards and procedures, to ensure that all
safe working practices are documented with appropriate risk assessments.