PROJECT REPORT
RESIDENTIAL BUILDING
Submitted by:
Name: AJITH KUMAR P (11612378)
ANSHAD A S (11613844)
ASHIQUE(11613154)
Section: A1604
Course ARC 317
Course Name: BUILDING MANAGEMENT
LOVELY SCHOOL OF ARCHITECTURE AND DESIGN
LOVELY PROFESSIONAL UNIVERSITY
PHAGWARA
INTRODUCTION
This report outlines the design of the residential building located near Francis
Road, Calicut, Kerala. This report includes all sets of drawings (Site details, Set out
drawings, Pile layout, Plans, Elevations, Section, Joinery details, Electrical
PAGE 1
OBJECTIVES:-
Cost effective
Fulfilling all requirements
Time bound management
User satisfaction
CLIENT REQUIREMENTS:-
Kitchen
Work area
Drawing room
Sitting room
Upper Living
Prayer room
Laundry room
Store
PAGE 2
SITE DETAILS
PAGE 3
PROJECT LIFECYCLE
PROCUREMENT PHASE
Conceptual Design
Schematic Design
Design Development
Contract Documents
CONSTRUCTION PHASE
Sub-Structure
Super Structure
Services
Interior
CLOSURE PHASE
SUB-STRUCTURE
Excavation
Earth Work
Foundation
Columns
Basement
Staircase
SUPER STRUCTURE
Plinth
Ground Floor
Walls
Slab
First Floor
Staircase
Roof
Electrical layout
Sanitary layout
Joinery Details
FINISHING
Ceiling
Flooring
Walls
Furniture
Bathroom
Kitchen
LANDSCAPING
Plantation
PAGE 5
AREA CALCULATIONS
Build-Up Area: - Ground Floor (183.5 sq. m.), First Floor (113.34 sq. m.).
F.A.R = Total floor area on the floors / Plot area
F.A.R .= (183.5+113.3)/377= 0.78
GROUND COVERAGE= 48%
PAGE 6
Lobby with Open Sitting
Kitchen
Prayer Room
Dining
Work Area
Laundry
PAGE 8
COST ESTIMATION
A FOUNDATION
1 Earthwork & Excavation 350 Cum. 34 11,900
2 Cement 41 Bags 270 11,000
3 Sand 10 Cum 6500 65,000
4 Course Aggregate 8 Units 600 4,800
5 Bricks 8500 Bricks 6 51,000
6 Horizontal DPC 16 Sqmt. 136 2,200
7 Labour Cost 270 Man Days 500 1,35,000
B SUPER STRUCTURE
1 Cement 800 Bags 270 2,16,000
2 Sand 105 Cum. 6500 6,82,500
3 Coarse Aggregate 126 Cum. 600 75,600
4 MS Steel 8250 Cum. 48 3,96,000
5 Bricks 62500 Bricks 6 3,75,000
6 Labour Cost 900 Man Day 500 4,50,000
C FLOORING
1 Wooden 200 Sqmt. 4200 8,40,000
Labour Cost 87 Man Days 500 43,500
Miscellaneous Lump Sum 5,00,000
2 Tiles 100 Sqmt. 800 80,000
Labour Cost 43 Man Days 500 21,500
Miscellaneous Lump Sum 50,000
D WALL PLASTERING
1 Cement 97 Bags 270 26,200
2 Sand 21 Cum. 6500 1,36,500
3 Glazed Tiles - Kitchen 100 Sqmt. 400 40,000
4 Glazed Tiles - Bathroom 100 Sqmt. 400 40,000
5 Labour Cost 1462 Man 500 7,31,000
PAGE 9
Days
E WOOD WORK
*NOTE
Cement concrete 1:5:10 with stone ballast .
Cement Sand mortar 1:6 in foundation and plinth.
R.C.C work hand mixed 1:1.5:3 in slabs.
R.C.C work hand mixed 1:1.5:3 in beam and column.
R.C.C work hand mixed 1:1.5:3 in basement wall.
Add charges for interior work (Bed, Cupboard).
Add charges for sanitary work.
Brick Size 230x115x75 mm
Cement used ACC Cement
PAGE 10
ELECTRICAL DRAWING
PAGE 11
JOINERY
PAGE 12
LEARNING OUTCOMES:
Project management
SOURCES: