Submitted to:

Lovely Professional University

PROJECT REPORT
RESIDENTIAL BUILDING
Submitted by:
Name: AJITH KUMAR P (11612378)
ANSHAD A S (11613844)
ASHIQUE(11613154)
Section: A1604
Course ARC 317
Course Name: BUILDING MANAGEMENT
LOVELY SCHOOL OF ARCHITECTURE AND DESIGN
LOVELY PROFESSIONAL UNIVERSITY
PHAGWARA
INTRODUCTION

House is the basic concept of Architecture. Human relationship with a house is


what makes it a home. Since ages known, man created homes to fulfill his needs
and desires.

This report outlines the design of the residential building located near Francis
Road, Calicut, Kerala. This report includes all sets of drawings (Site details, Set out
drawings, Pile layout, Plans, Elevations, Section, Joinery details, Electrical

drawing and Furniture Layout).

Building – Residential Building

Full Address – Francis Road, Calicut, Kerala (673002)


Architect - Ar. S. V. Abdunnazir
Client – Mr. Asif Ali
Plot Area – 377 Sq. m
Estimate Cost – 66Lakhs

PAGE 1
OBJECTIVES:-
 Cost effective
 Fulfilling all requirements
 Time bound management
 User satisfaction

CLIENT REQUIREMENTS:-

 Master Bedroom with attached Dressing and Toilet

 2 Bedrooms with attached Toilet

 1 Guestroom with attached Dressing and Toilet

 Kitchen

 Work area

 Drawing room

 Lobby with Sitting and Dining

 Sitting room

 Upper Living

 Prayer room

 Laundry room

 Store

 2 Car - Parking Space

PAGE 2
SITE DETAILS

PAGE 3
PROJECT LIFECYCLE

PROCUREMENT PHASE

 Surveying and Leveling


 Depositing of Documentation
 All Legal Notice and Orders

PRE CONSTRUCTION PHASE

 Conceptual Design
 Schematic Design
 Design Development
 Contract Documents

CONSTRUCTION PHASE

 Sub-Structure
 Super Structure
 Services
 Interior

CLOSURE PHASE

 Provide Documentation and Drawing


 Releasing Resources
 Performance Assessment
PAGE 4
WORK BREAKDOWN STRUCTURE
INITIAL PHASE

 Surveying and Leveling


 Planning and Designing
 Changes in Design(Design Development)
 Structural Details

SUB-STRUCTURE

 Excavation
 Earth Work
 Foundation
 Columns
 Basement
 Staircase

SUPER STRUCTURE

 Plinth
 Ground Floor
 Walls
 Slab
 First Floor
 Staircase
 Roof

UTILITY AND SERVICES

 Electrical layout
 Sanitary layout
 Joinery Details

FINISHING

 Ceiling
 Flooring
 Walls
 Furniture
 Bathroom
 Kitchen

LANDSCAPING

 Plantation

PAGE 5
AREA CALCULATIONS
Build-Up Area: - Ground Floor (183.5 sq. m.), First Floor (113.34 sq. m.).
F.A.R = Total floor area on the floors / Plot area
F.A.R .= (183.5+113.3)/377= 0.78
GROUND COVERAGE= 48%

PLANS GROUND FLOOR PLAN

SPACES PROVIDED ON THE GROUND FLOOR


 Master Bedroom (attach Bathroom and Dressing)
 Bedroom (attach Bathroom and Dressing)
 Drawing Room

PAGE 6
 Lobby with Open Sitting
 Kitchen
 Prayer Room
 Dining
 Work Area
 Laundry

FIRST FLOOR PLAN

SPACES PROVIDED ON THE FIRST FLOOR


 Bedroom (attach Bathroom and Dressing)
 Home Theatre
 Lobby with Open Sitting
 Balcony
PAGE 7
ELEVATIONS

Roof Height: 6.90 m.


Elements used in the elevation: -
A) Steel Fabricated structure with glass covering on top for car porch
B) Projections around the window
C) Show Wall that can be decorated with stone cladding
D) Elevated slabs on top of roof
E) Continuous Grooves at equal intervals

PAGE 8
COST ESTIMATION

SR. NO. MATERIAL / DESCRIPTION QUANTITY PRICE TOTAL COST

A FOUNDATION
1 Earthwork & Excavation 350 Cum. 34 11,900
2 Cement 41 Bags 270 11,000
3 Sand 10 Cum 6500 65,000
4 Course Aggregate 8 Units 600 4,800
5 Bricks 8500 Bricks 6 51,000
6 Horizontal DPC 16 Sqmt. 136 2,200
7 Labour Cost 270 Man Days 500 1,35,000
B SUPER STRUCTURE
1 Cement 800 Bags 270 2,16,000
2 Sand 105 Cum. 6500 6,82,500
3 Coarse Aggregate 126 Cum. 600 75,600
4 MS Steel 8250 Cum. 48 3,96,000
5 Bricks 62500 Bricks 6 3,75,000
6 Labour Cost 900 Man Day 500 4,50,000
C FLOORING
1 Wooden 200 Sqmt. 4200 8,40,000
Labour Cost 87 Man Days 500 43,500
Miscellaneous Lump Sum 5,00,000
2 Tiles 100 Sqmt. 800 80,000
Labour Cost 43 Man Days 500 21,500
Miscellaneous Lump Sum 50,000
D WALL PLASTERING
1 Cement 97 Bags 270 26,200
2 Sand 21 Cum. 6500 1,36,500
3 Glazed Tiles - Kitchen 100 Sqmt. 400 40,000
4 Glazed Tiles - Bathroom 100 Sqmt. 400 40,000
5 Labour Cost 1462 Man 500 7,31,000
PAGE 9
Days
E WOOD WORK

1 Doors Hardwood Frames 250 mt 270 67,500


2 Doors Hardwood Shutters 60 Sqmt. 950 57,000
3 Window Hardwood Frames 110 mt. 270 29,700
4 Window Hardwood Shutters 40 Sqmt. 950 38,000
5 Iron Grilling With Labour 100 Sqmt. 200 20,000
F ELECTRICAL & PLUMBING

1 Electrical Lump Sum 2,50,000


2 Plumbing Lump Sum 3,00,000
G PAINT & POLISH

1 Paint Work Lump Sum 1,50,000


2 Polish Work Lump Sum 60,000
H INTERIOR WORK
1 Furniture Lump Sum 2,50,000
2 Sanitary Work Lump Sum 4,50,000
GRAND TOTAL RS. 66,88,000.00

*NOTE
 Cement concrete 1:5:10 with stone ballast .
 Cement Sand mortar 1:6 in foundation and plinth.
 R.C.C work hand mixed 1:1.5:3 in slabs.
 R.C.C work hand mixed 1:1.5:3 in beam and column.
 R.C.C work hand mixed 1:1.5:3 in basement wall.
 Add charges for interior work (Bed, Cupboard).
 Add charges for sanitary work.
 Brick Size 230x115x75 mm
 Cement used ACC Cement

PAGE 10
ELECTRICAL DRAWING

PAGE 11
JOINERY

PAGE 12
LEARNING OUTCOMES:

 Fulfilling the aim and objectives of a design

 Satisfaction of the client

 Understand design strategies

 Design process and planning procedures

 Project management

 Drafting and detailing

 Understanding materials and different techniques

 Professional- client relationship

SOURCES:

 Ar. SAJITH PUTRH


 De’ Signature ARCHITECTS