SUMMARY OF ASPHALT CORING THICKNESS

DESIGN STATION
W/ ARA E-5A 0 + 520 LS
W/ ARA E-5B 0 + 540 LS
W/O ARA 0 + 560 RS
W/O ARA 0 + 700 RS (2.0m from CL)
W/O ARA 0 + 850 LS (5m from CL)
W/O ARA 0 + 890 RS
W/ ARA 0 + 900 LS (17m from CL)
W/O ARA 0 + 950 LS
W/O ARA 1 + 000 RS (20m from CL)
W/O ARA 1 + 000 RS (2m from CL)
W/O ARA 1 + 080 RS
W/ ARA 1 + 730 LS
W/O ARA 2 + 160 LS
W/O ARA 2 + 180 LS
W/ ARA 2 + 460 LS
W/O ARA 2 + 490 RS
W/O ARA 2 + 530 RS
W/O ARA 2 + 590 RS
W/O ARA 2 + 680 RS
W/ ARA 2 + 690 LS
W/ ARA 2 + 760 LS
W/ ARA 2 + 810 LS (10m from CL)

W/O ARA 2 + 830 RS (RECORE)

W/O ARA 3 + 160 LS (SECOND LAYER)


W/ ARA 3 + 170 RS
W/ ARA 3 + 180 LS (11m from CL)
W/ ARA E-1 3 + 180 LS (45m from CL)
W/ ARA 3 + 200 LS (RECORE)

W/ ARA E-1 3 + 200 LS (45m from CL)


W/ ARA 3 + 240 LS
W/ ARA 3 + 250 RS
W/ ARA 3 + 270 LS
W/ ARA 3 + 300 LS

W/O ARA 3 + 330 LS (RECORE)

W/ ARA 3 + 340 LS
W/ ARA 3 + 350 LS
W/ ARA 3 + 370 LS
W/ ARA 3 + 390 LS
W/O ARA 3 + 400 RS (shoulder)
W/ ARA 3 + 410 LS
W/ ARA 3 + 430 LS
W/ ARA 3 + 450 LS

W/O ARA 3 + 460 RS (RECORE)

W/ ARA 3 + 480 RS
W/ ARA 3 + 500 LS
W/ ARA 3 + 520 LS
W/O ARA 3 + 520 LS
W/ ARA 3 + 540 LS
W/ ARA 3 + 560 LS
W/ ARA 3 + 580 RS
W/ ARA 3 + 600 LS
W/ ARA 3 + 620 RS

Overall Average thickness =


Prepared by:

Wesley Arpilleda
Materials Engineer 1

Note:
------ recore
------ less than 45mm
------ original core
BW ------ backward (5m)
FW ------ forward (5m)
CORING THICKNESS

THICKNESS (mm) DATE CORED


55 2/22/2019
52 2/22/2019
50 11/9/2018
48 11/9/2018
50 11/9/2018
50.65 11/12/2018
48 11/9/2018
50 11/9/2018
53.4 11/13/2018
45 11/9/2018
54.7 11/13/2018
61 1/11/2019
48 11/9/2018
60 11/9/2018
94 1/8/2019
45 01/31/2019
47.25 01/31/2019
70.25 01/31/2019
57 01/31/2019
57.75 01/31/2019
52.25 2/8/2019
50 2/19/2019
BW FW
2/27/2019
59 60
47 2/19/2019
52 2/22/2019
48 2/19/2019
50 2/21/2019
BW FW
3/2/2019
42 43
54 2/21/2019
49 2/19/2019
47 2/22/2019
52 2/21/2019
47 2/21/2019
BW FW
2/27/2019
44 46
48 2/21/2019
46 2/21/2019
57 2/21/2019
49 2/21/2019
39.25 1/30/2019
55 2/21/2019
54 2/21/2019
48 2/21/2019
BW FW
2/27/2019
47 44
45 2/21/2019
50 2/21/2019
50 2/21/2019
47.3 09/25/18
50 2/21/2019
63 2/22/2019
48 09/25/18
48 2/22/2019
55 2/22/2019

51.4145454545
Noted by:

George Enierga
Project Manager
0
SUMMARY OF ASPHALT CORING THICKNESS
DESIGN STATION THICKNESS (mm)
W/O ARA 0 + 560 RS 50
W/O ARA 0 + 700 RS (2.0m from CL) 48
W/O ARA 0 + 850 LS (5m from CL) 50
W/O ARA 0 + 890 RS 50.65
W/O ARA 0 + 900 LS (17m from CL) 48
W/O ARA 0 + 950 LS 50
W/O ARA 1 + 000 RS (20m from CL) 53.4
W/O ARA 1 + 000 RS (2m from CL) 45
W/O ARA 1 + 080 RS 54.7
W/O ARA 2 + 160 LS 48
W/O ARA 2 + 180 LS 60
W/O ARA 2 + 490 RS 45
W/O ARA 2 + 530 RS 47.25
W/O ARA 2 + 590 RS 70.25
W/O ARA 2 + 680 RS 57
BW FW
W/O ARA 2 + 830 RS (RECORE)
59 60
W/O ARA 3 + 160 LS (SECOND LAYER) 47
BW FW
W/O ARA 3 + 330 LS (RECORE)
44 46
W/O ARA 3 + 400 RS (shoulder) 39.25
BW FW
W/O ARA 3 + 460 RS (RECORE)
47 44
W/O ARA 3 + 520 LS 47.3
CKNESS
DATE CORED
11/9/2018 1
11/9/2018 2
11/9/2018 3
11/12/2018 4
11/9/2018 5
11/9/2018 6
11/13/2018 7
11/9/2018 8
11/13/2018 9
11/9/2018 10
11/9/2018 11
01/31/2019 12
01/31/2019 13
01/31/2019 14
01/31/2019 15
16
2/27/2019
17
2/19/2019 18
19
2/27/2019
20
1/30/2019 21
22
2/27/2019
23
09/25/18 24
REPAIR AND OVERLAY OF RUNWAY 06/24
DESIGN STATION THICKNESS (mm)

1 W/ ARA E5 / 0 + 520 LS 55

2 W/ ARA E5 / 0 + 540 LS 52

3 W/ ARA 3 + 170 RS 52

4 W/ ARA 3 + 250 RS 47

5 W/ ARA 3 + 560 LS 63

6 W/ ARA 3 + 600 LS 48

7 W/ ARA 3 + 620 RS 55

8 W/ ARA E1/ 3 + 180 LS 50

9 W/ ARA E1 / 3 + 200 LS 54

10 W/ ARA 3 + 270 LS 52

11 W/ ARA 3 + 300 LS 47

12 W/ ARA 3 + 340 LS 48

13 W/ ARA 3 + 350 LS 46

14 W/ ARA 3 + 370 LS 57

15 W/ ARA 3 + 390 LS 49

16 W/ ARA 3 + 410 LS 55

17 W/ ARA 3 + 430 LS 54

18 W/ ARA 3 + 450 LS 48

19 W/ ARA 3 + 500 LS 50

20 W/ ARA 3 + 520 LS 50

21 W/ ARA 3 + 540 LS 50
Y 06/24
DATE CORED
2/22/2019
2/22/2019
2/22/2019
2/22/2019
2/22/2019
2/22/2019
2/22/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
2/21/2019
W/O ARA 0 + 560 RS 50 11/9/2018

W/O ARA 0 + 700 RS 48 11/9/2018

W/O ARA 0 + 850 LS 50 11/9/2018

W/O ARA 0 + 900 LS 48 11/9/2018

W/O ARA 0 + 950 LS 50 11/9/2018

W/O ARA 1 + 000 RS 45 11/9/2018

W/O ARA 2 + 160 LS 48 11/9/2018

W/O ARA 2 + 180 LS 60 11/9/2018

W/O ARA 2 + 490 RS 45 01/31/2019

W/O ARA 2 + 530 RS 47.25 01/31/2019

W/O ARA 2 + 590 RS 70.25 01/31/2019

W/O ARA 2 + 680 RS 57 01/31/2019

W/O ARA 1 + 000 RS 53.4 11/13/2018

W/O ARA 1 + 080 RS 54.7 11/13/2018

BW FW
W/O ARA 2 + 830 RS (RECORE) 2/27/2019
59 60

BW FW
W/O ARA 3 + 330 LS (RECORE) 2/27/2019
45 46

BW FW
W/O ARA 3 + 460 RS (RECORE) 2/27/2019
47 45