TANG PILING SDN BHD

PILING RECORD FORM

Proposed Piling Works for Mixed Development "Jesselton Residence", Kota Kinabalu, Sabah

Client: VINCI Construction Grands Projets Sdn. Bhd


Consultant: ZONE / BLOCK:
LOCATION: DATE:
PILE No:
Length:
Pile size: 415mm X 260mm H-Pile Operator:
Hammer Type: Hydraulic Hammer Welder:
Ram Weight: 7.00 - ton Recorder:
Drop Heigth: 600 mm

Penetration (m) No of blow Penetration (m) No of blow Penetration (m) No of blow


REMARKS
0.30 11.70 23.10 34.50 38.40
0.60 12.00 23.40 34.80 38.70
0.90 12.30 23.70 35.10 39.00
1.20 12.60 24.00 35.40 39.30
1.50 12.90 24.30 35.70 39.60
1.80 13.20 24.60 36.00 39.90
2.10 13.50 24.90 36.30 40.20
2.40 13.80 25.20 36.60 40.50
2.70 14.10 25.50 36.90 40.80
3.00 14.40 25.80 37.20 41.10
3.30 14.70 26.10 37.50 41.40
3.60 15.00 26.40 37.80 41.70
3.90 15.30 26.70 38.10 42.00
4.20 15.60 27.00 TOTAL PENETRATION:
4.50 15.90 27.30
4.80 16.20 27.60
5.10 16.50 27.90 SET: (mm)
5.40 16.80 28.20
5.70 17.10 28.50
6.00 17.40 28.80 SKETCH:
6.30 17.70 29.10
6.60 18.00 29.40
6.90 18.30 29.70
7.20 18.60 30.00
7.50 18.90 30.30
7.80 19.20 30.60
8.10 19.50 30.90
8.40 19.80 31.20
8.70 20.10 31.50
9.00 20.40 31.80
9.30 20.70 32.10
9.60 21.00 32.40 REMARKS:
9.90 21.30 32.70
10.20 21.60 33.00
10.50 21.90 33.30
10.80 22.20 33.60
11.10 22.50 33.90
11.40 22.80 34.20
Performed by: VINCI Construction Grands Projets Sdn. Bhd C&S Consultant's Representative

TANG PILING SDN BHD Name: Name:


Date: Date: Date: