Date 18-12-18 REF

Inspection Report of Double Wall Tank
Contractor Haroon Engineering Company
Third Party  Global NDT and Engineering Services Karachi
Client Total Parco Pakistan Ltd
Following is the Detailed Inspection Report of Double Wall Tank.
Raw Material Inspection (Thickness)
Sr. No. Description Actual Reading Required Dimension
1 Inner Shell 8.01 mm 8 mm
2 Inner Dish 8.01 mm 8 mm
3 Outer Shell 4 mm 4 mm
4 Outer Dish 5 mm 5 mm
Tank Dimensions Inspection
Sr. No. Description Actual Reading Required Dimension
1 Inner Tank Length 7548 mm 7545 mm
2 Inner Tank (O.D) 2740 mm 2736 mm
3 Outer Tank Length 8155 mm 8148 mm
4 Outer Tank (O.D) 2750 mm 2744 mm
Pressure/Pneumetic Test Report
Sr. No. Description Test Pressure Holding Time Leakage
1 Internal Tank 0.5 Bar 48 Hrs No
2 Intermediate 0.28 Bar 24 Hrs No
Space

Paint/GRP
Sr. No. Descrription Painting Sand Blasting
1
Internal Tank (Outer Surface) Smoke Grey Epoxy S.A 2.5

2 Outer Tank (Internal Surface) Smoke Grey Epoxy S.A 2.5

3 Outer Tank (Outer Surface) N/A S.A 2.5


Incharge Production Incharge QC Third Party Inspector
HEC/TPPL/IR/19-10

nk

Difference
0.01 mm
0.01 mm
0.00 mm
0.00 mm

Difference
3 mm
4 mm
7 mm
6 mm

Leakage Test Result
No Pass
No Pass

GRP Coating

N/A

N/A

02 layers of 3 mm (1.5 mm each)


Third Party Inspector