Beruflich Dokumente
Kultur Dokumente
ESD
V-407
V-404
V-403
T-501
F-402
P-607/608
EQUIPMENT
AMINE CONTACTOR
REFLUX ACCUMULATOR
TREATED GAS SCRUBBER
XI-608
XI-607
LT-407
LT-407
LT-404
LT-404
LT-403
LT-403
LT-501
LT-501
FT-407
DEVICE
LT-402A
LT-402A
LT-402B
LT-402B
PT-404A
PT-404A
PT-404B
LSLL-407
LSLL-404
PDIT-501
LSLL-501
PDIT-402
PDIT-402
LSHH-407
LSHH-404
LSHH-403
LSHH-501
LSHH-402A
LSHH-402B
XA-608
XA-607
ALARM
FAL-407
LAL-407
LAL-404
LAL-403
LAL-501
LAH-407
LAH-404
LAH-403
LAH-501
LALL-407
LALL-404
LALL-501
LAL-402A
PAL-404A
LAL-402B
LAH-402A
LAH-402B
LAHH-407
LAHH-404
LAHH-403
LAHH-501
PAH-404A
PDAH-501
PDAH-402
LAHH-402A
LAHH-402B
PDAHH-402
PAHH-404B
ESD-PLANT
Gas Plant
Job No. US-107474
Cause and Effect Matrix
Sterling Oil Exploration Energy Prod. Co. Nigeria
DESCRIPTION/ANNUCIATE
003
003
003
003
003
003
002
002
002
002
001
001
001
001
001
001
001
001
001
001
001
001
001
001
003
002
002
002
001
001
N/A
P&ID
SEC
SEC
N/A
25%
60%
80%
25%
60%
80%
timer
seam
seam
seam
seam
seam
seam
seam
5 psid
7 GPM
bottom
bottom
bottom
bottom
bottom
bottom
bottom
10 psid
65 psig
140 psig
120 psig
SET POINT
XI NOT EQ XS + 10
XI NOT EQ XS + 10
6" from the bottom
10'-0" from bottom
10'-6" from bottom
I/O
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
END DEVICE P&ID DESCRIPTION/ACTION
LGC
LGC
TYPE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DO XS-111A 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL PUMP
X
DO XS-111B 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL COOLER
X
Page 2 of 15
X
A-302
E-203
T-502
A-301
P-604/605
P-601/602
NOTES:
EQUIPMENT
AMINE COOLER
AMINE REBOILER
AMINE STILL/WITH SURGE
AMINE BOOSTER PUMP (NOTE: 3)
NOTE: 2
XI-605
XI-604
XI-602
XI-601
LT-502
LT-502
TE-302
TE-302
TE-203
TE-203
FT-601
FT-601
TE-601
TE-601
TE-601
VT-602
VT-602
VT-601
VT-601
TIC-301
TIC-301
XI-302A
XI-301A
XI-301C
XI-302B
XI-301B
DEVICE
TE-203A
TE-203A
PT-601C
PT-601C
PDIT-502
LSLL-502
PSLL-602
PSLL-601
LSHH-502
PSHH-602
PSHH-601
VSHH-302A
VSHH-301A
VSHH-301C
VSHH-302B
VSHH-301B
KY-203A TIMER
TAL-302
TAL-203
LAL-502
TAL-301
FAL-601
TAL-601
XA-301C
TAH-302
TAH-203
LAH-502
TAH-301
TAH-601
XA-302A
XA-301A
XA-302B
XA-301B
VAH-602
VAH-601
FALL-601
LALL-502
PALL-602
PALL-601
TAH-203A
LAHH-502
TAHH-601
VAHH-602
VAHH-601
PAHH-602
PAHH-601
PDAH-502
PALL-601C
TAHH-203A
VAHH-301C
VAHH-302A
VAHH-301A
VAHH-302B
VAHH-301B
PAHH-601C
KYHH-203A
Gas Plant
Job No. US-107474
Cause and Effect Matrix
Sterling Oil Exploration Energy Prod. Co. Nigeria
EQUAL TO 10 MINUTES
DESCRIPTION/ANNUCIATE
1. P-601/602 Run/Start Permissive: P-604 or P-605 must be in service for P-601/602 to run/start. (P-601/602 are one operating, one spare. P-604/605 are one operating, one spare.)
TI-203A > OR EQUAL TO 275 F AND P-601/602 AMINE CIRCULATION PUMP NOT OPERATING > OR
005
007
007
005
004
003
003
006
003
003
003
007
007
007
007
006
006
006
006
006
006
006
006
004
004
004
004
004
004
004
003
003
003
003
006
003
003
003
003
003
003
003
003
P&ID
SEC
SEC
SEC
SEC
SEC
SEC
SEC
SEC
SEC
90 F
90 F
95 F
timer
6.3 G
6.3 G
6.3 G
6.3 G
6.3 G
seam
seam
seam
seam
140 F
400 F
415 F
235 F
265 F
140 F
140 F
5 psid
0.5 ips
0.5 ips
10 psig
10 psig
minutes
seconds
seconds
325 psig
115 GPM
200 GPM
1600 psig
1600 psig
1600 psig
0.6 ips + 3
0.6 ips + 3
275 F / 10
SET POINT
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
END DEVICE P&ID DESCRIPTION/ACTION
TE
TE
TE
TE
TE
TE
TE
TE
TE
LGC
LGC
LGC
LGC
LGC
LGC
LGC
LGC
LGC
LGC
TYPE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DO P-607 003 SHUTDOWN P-607, AMINE STILL REFLUX PUMP
X
DO P-608 003 SHUTDOWN P-608, AMINE STILL REFLUX PUMP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DO LCV-404 005 DEENERGIZE LXY-404, CLOSE LCV-404
X
X
X
X
X
X
X
X
DO A-302 007 SHUTDOWN A-302, AMINE STILL REFLUX CONDENSER FAN A
X
X
DO A-302 007 SHUTDOWN A-302, AMINE STILL REFLUX CONDENSER FAN B
DO XS-111A 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL PUMP
DO XS-111B 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL COOLER
3. P-604/605 Run Permissive: (1) P-604/605 to immediately shutdown if P-601/602 shutdown. (2) Include a 10 second shutdown delay in the P-604/605 start-up sequence to allow P-601/602 to be started. (3) Include a manual override on P-604/605 run permissive & FALL-601 for (P-604/605 shutdown only) to be used if the P-604/605 start-up recycle valve (#608) is open. (4) Include an alarm stating "maual override is astivated - verify that the start-up recycle valve (#608) is open".
DO A-322 023 SHUTDOWN A-322, DETHANIZED PRODUCT COOLER FAN A
Page 3 of 15
DO H-227 027 SHUTDOWN H-227, SEAL GAS HEATER
F-412
E-201
V-701
H-701
P-701 A/B
NOTES:
EQUIPMENT
INLET SEPARATION
HOT OIL EXPANSION TANK
NOTE: 6
NOTE: 5
PANEL
PANEL
FT-402
TE-701
TE-701
XI-701A
XI-701B
DEVICE
PDI-410
PDI-410
FT-701A
FT-701A
PT-410B
PT-410B
FT-701B
ZSC-410
ZSO-410
LSH-701
LIT-412A
LIT-412A
LIT-412B
LIT-412B
PDIT-412
PDIT-412
PSHH-701
LSLL-701-1
LSHH-412A
LSHH-412B
HEATER CONTROL
HEATER CONTROL
XA-701
ALARM
TAL-701
ZAC-410
TAH-701
LAH-701
XA-701A
XA-701B
ZAO-410
FAH-402
LAL-412A
FAL-701A
LAL-412B
LAH-412A
FAH-701A
LAH-412B
TSHH-701
PAH-410B
PDAH-412
PDAH-410
PAHH-701
LALL-701-1
LAHH-412A
LAHH-412B
PDAHH-412
PDAHH-410
PAHH-410B
FALL-701B-1
5. PDAHH-410 used as XV-410 permissive to prevent opening of valve with high differential across valve.
Gas Plant
Job No. US-107474
Cause and Effect Matrix
Sterling Oil Exploration Energy Prod. Co. Nigeria
6. PDAHH-412 includes a 15 second timer before initiating action. DP set @ maximum allowable for change-out. NGGC-336 PL-20 elements burst pressure is 25 PSID
HIGH FLOW H-701 HOT OIL HEATER OUTLET
HIGH LEVEL V-701 HOT OIL EXPANSION TANK
HIGH FLOW E-201 FEED GAS/TREATED GAS EXCHANGER - SHELL SIDE INLET
015
015
015
015
015
015
015
015
014
014
014
014
014
014
008
007
007
007
007
007
007
007
007
007
007
007
P&ID
SEC
SEC
SEC
75%
85%
25%
75%
85%
15%
80%
25%
700 F
300 F
400 F
15 psid
20 psid
15 psid
40 psig
20 psid
950 psig
565 GPM
650 GPM
1045 psig
1050 GPM
SET POINT
45 seconds
45 seconds
130 mmscfd
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
I/O
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
DI
DI
DI
DI
DI
DI
DI
DI
DI
END DEVICE P&ID DESCRIPTION/ACTION
TE
TE
LGC
LGC
TYPE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
N/A STOP DEHY TIMER
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DO P-601 003 SHUTDOWN P-601, AMINE CIRCULATION PUMP
X
X
X
X
X
DO P-602 003 SHUTDOWN P-602, AMINE CIRCULATION PUMP
X
X
X
X
X
DO FCV-601 003 DEENERGIZE FXY-601, CLOSE FCV-601
X
X
X
X
X
DO P-604 005 SHUTDOWN P-604, AMINE BOOSTER PUMP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X DO XS-111A 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL PUMP
X
X
X
X
DO XS-111B 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL COOLER
X
X
X
X
X
Page 4 of 15
DO H-227 027 SHUTDOWN H-227, SEAL GAS HEATER
E-211
V-418
A-311
C-111
F-416/417
V-413/414/415
NOTES:
EQUIPMENT
NOTE: 11
NOTE: 10
TE-211
TE-211
FT-111
FT-111
FT-111
TE-417
TE-417
TE-416
PT-416
FT-416
FT-416
XI-111A
XI-311A
ME-416
ME-416
XI-111B
XI-311B
DEVICE
TE-111A
TE-111A
TE-111A
TE-311A
TE-311A
TE-211D
TE-415D
TE-415D
TE-311B
PSS-111
PSLL-111
ZSC-211A
PDT-416A
PDT-416A
LSHH-418
ZSO-211A
ZSC-211B
ZSO-211B
VSHH-311A
VSHH-311B
XA-111
ALARM
TAL-211
FAL-111
LAL-418
TAL-311
FAL-416
TAH-211
PSL-111
LAH-418
TAH-311
TAH-417
TAH-416
XA-111A
XA-311A
XA-111B
XA-311B
FAH-111
PAH-416
FAH-416
FALL-111
MAH-416
TAL-111A
PALL-111
TAL-415D
ZAC-211A
ZAO-211A
TAH-111A
ZAC-211B
TAH-211D
LAHH-418
TAHH-311
TAH-415D
TAHH-417
ZAO-211B
MAHH-416
TAHH-111A
VAHH-311A
VAHH-311B
PDAH-416A
PDAHH-416A
Gas Plant
Job No. US-107474
Cause and Effect Matrix
Sterling Oil Exploration Energy Prod. Co. Nigeria
9. If regeneration gas is routed to alternate location closing of FCV-111 will need to be evaluated to prevent depressuring system (Solenoid need to be added).
DESCRIPTION/ANNUCIATE
7. PDAHH-416A includes a 15 second timer before initiating action. DP set @ maximum allowable for change-out. PSFG-336 M1C-00EB Element collapse DP is 35 PSID
LOW LEVEL V-418 REGENERATION GAS SCRUBBER
HIGH LEVEL V-418 REGENERATION GAS SCRUBBER
START FAULT A-311 REGENERATION GAS COOLER FAN A
LOW LOW CASE-LUBE PRESSURE C-111 REGENERATION GAS COMPRESSOR LUBE OIL
LOW TEMPERATURE V-413/414/415 REGENERATION GAS OUTLET - END OF HEATING STEP
HIGH TEMPERATURE V-413/414/415 REGENERATION GAS OUTLET - END OF COOLING STEP
LOW PRE-LUBE PRESSURE PERMISSIVE C-111 REGENERATION GAS COMPRESSOR LUBE OIL
017
017
017
017
017
017
017
017
017
017
017
017
017
017
017
017
017
017
017
017
017
016
016
016
016
015
015
015
015
017
017
017
017
015
015
017
015
015
017
017
P&ID
SEC
SEC
SEC
SEC
SEC
50 F
90 F
-95 F
seam
seam
seam
6.3 G
6.3 G
400 F
150 F
425 F
450 F
530 F
180 F
190 F
150 F
135 F
140 F
135 F
140 F
-110 F
20 psid
15 psid
950 psig
9 mmscfd
13 mmscfd
SET POINT
45 seconds
45 seconds
45 seconds
45 seconds
20 sec timer
110 mmscfd
135 mmscfd
6.5 mmscfd w /
5 psig decrease
18" from bottom
33" from bottom
39" from bottom
10 psig decrease
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
XI NOT EQ XS + 10
I/O
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
DI
DI
DI
DI
DI
DI
DI
DI
DI
END DEVICE P&ID DESCRIPTION/ACTION
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
LGC
LGC
LGC
LGC
LGC
TYPE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X DO XS-111A 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL PUMP
X
X
X
X
X
X
X
X
DO XS-111B 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL COOLER
X
X
X
X
X
X
X
X
Page 5 of 15
DO H-227 027 SHUTDOWN H-227, SEAL GAS HEATER
E-225
V-421
EX/C-121
E-223/224
E-221/222
NOTES:
AND
AND
EQUIPMENT
COLD SEPARATOR
REFLUX CONDENSER
GAS/GAS EXCHANGER
TE-121
TE-225
TE-225
PT-421
TE-421
TE-421
FT-222
DEVICE
TE-421A
TE-222A
TE-223A
TE-221A
TE-221A
TE-121C
TE-121C
TE-225D
PT-121E
TE-223B
TE-223B
TE-223B
PDIT-223
PDIT-223
PDIT-221
LSHH-421
PDIT-121A
PDIT-121A
PDIT-222A
PDIT-222C
PDIT-222C
PDIT-121B
PDIT-121B
PDIT-222B
EXP/COMP PANEL
12. First entry is for recovery mode alarm. Second entry is for rejection mode alarm.
10. PSL-111: Lube oil pressure permissive set at 12 psig increasing (used for start-up)
XA-121
ALARM
TAL-225
TAL-421
LAL-421
FAL-222
TAH-225
TAH-421
LAH-421
PAH-421
TAL-222A
TAL-221A
TAL-223B
TAH-121C
TAH-223B
TAH-223A
TAHH-121
LAHH-421
PAH-121E
PDAH-221
TALL-421A
TALL-221A
PDAL-222B
TAHH-121C
TAHH-225D
PDAH-121A
PDAH-223A
TAHH-223B
PDAH-222A
PDAH-222C
PDAH-121B
PDAHH-222C
PDAHH-121A
PDAHH-223A
PDAHH-121B
Gas Plant
Job No. US-107474
11. FALL-111: Includes a 10 second start-up timer to allow compressor to built-up flowrate above minimum shutdown rate.
Cause and Effect Matrix
Sterling Oil Exploration Energy Prod. Co. Nigeria
DESCRIPTION/ANNUCIATE
021
020
020
020
021
021
021
021
021
021
021
021
020
020
020
020
020
019
019
019
019
019
018
018
018
018
020
019
019
018
018
018
018
018
P&ID
0F
0F
0F
SEC
25%
70%
85%
40 F
-45 F
-35 F
-15 F
180 F
195 F
150 F
225 F
140 F
150 F
140 F
5 psid
5 psid
5 psid
-170 F
15 psid
15 psid
15 psid
20 psid
10 psid
15 psid
15 psid
20 psid
325 psig
SET POINT
20 mmscfd
90 F / 185 F
950 / 1035 psig
XI NOT EQ XS + 10
I/O
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
DI
DI
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TE
TYPE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DO XS-111A 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL PUMP
DO XS-111B 017 SHUTDOWN C-111, REGEN GAS COMPRESSOR LUBE OIL COOLER
Page 6 of 15
DO H-227 027 SHUTDOWN H-227, SEAL GAS HEATER