2 Working at height S- Fall of material from height. S-Damage to other material, 3 4 12(M) 1.No storage of material on working platform. Yes 2 2 4(L) Engineer / Supervisor
(scaffolding) fracture ,injuries. 2.Area underneath should be barricaded..
3.Prior tool box talk to the workmen.
S- Fall of person from height. S-Laceration bruises, fracture,injuries 3 4 12(M) 1.Ensure use of PPE's like Safety shoes,. Yes 2 2 4(L) Engineer / Supervisor
safety helmet.
2.Use of double lanyard safety belt.
S- Use of electricity S-Electrocution 4 2 8(M) 1.All the power cable shall be routed through . Yes 2 2 4(L) Engineer / Supervisor
30mA RCCB
2.Inspection of drilling machine prior to use .
3.No cable joints with out cable connector.
4.Daily inspection of cables and cable joints
by site safety stewards and electricians.
S-Flying particles S-Eye injury 4 2 8(M) 1.Usage of safety goggles shall be ensured. Yes 2 2 4(L) Engineer / Supervisor
5 <Frequent> - Common or repeating occurrences 5 <Catastrophic> - Multiple fatality; > 20 - 25 Very High NOT Acceptable / Stop