CHECKLIST FOR REBAR (COLUMNS, NECK COLUMNS AND PLINTH WALL)


WIR No. Location: Date:
Checked by
Const.Team QC Team Consultant
SN Items to be checked Remarks

N/A

N/A

N/A
Yes

Yes

Yes
No

No

No
QA/QC Requirements

1 Ensure that Method Statement, Materials and Drawings are approved and
available.

2 Verify and Check Setting-out ( Double check concrete Member dimension


as per the Approved Drawing)

3 Ensure that Starter bars are cleaned and overlapped satisfactory

Check the Reinforcement fixed as per the followings:


a. Number of Reinforcement
b. Diameter of Reinforcement
4 c. Stirup numbers and spacing
d. Tying of Rebars & Alignment of Reinforcement
e. Overlap of Reinforcement ( 50 D or 60 D)
f. Cleaness of Reinforcement from Rust , oil, debries etc

5 Ensure that Coupler/Pullout bars installed in required level as per the


drawings ( If required)

6 Ensure sufficient spacer blocks are provided for cover.

7 Ensure completion of MEP Works (MEP Conduits/ Sleeves/ Fixtures/ Box


out/ Earth Wire) and approved.

8 Ensure that all rubbish removed and air blasted.

For Final Approval


Contractor Representative Consultant Representative

Designation: Name Signature: Date Name:

FORMAN Signature:

SE/PE Date:

QA/QC Engineer

TGC/QAQC/CHK/CVL/COL/01 A REV-00 Page 1 of 1