1. ISO 9000 1. Guidelines for Page 76-78
auditing the quality Objective questions:
2. ISO 9001 2. Guide to implement
quality systems 14. When was the ISO/IEC 12207 published
3. ISO 9004 3. Describes quality
models i) 1993
4. ISO 10011 4. Introduction and j) 1994
guide to use other ISO 9000 standards k) 1995
- 10 -
CSQA Raw Question Bank
l) 1996 leadership.
d.Provide funds for training.
Ans. 1995 e.All of the above
15. What are the two types of reviews defined in (answer -e)
ISO/IEC 12207
6.What are the changes can possible if
Ans. Joint technical review management commitment is present in the
Joint management review organisation?(subjective)
1.Give an overview of ISO/IEC 12207 quality 8.As the lowest group to accept the
model process,middle management is the srongest
2. What are the different points of view link in the most quality management effort.
regarding software development as defined in (true/false).
ISO/IEC 12207 quality model (answer(false).
Page 90-92
Page 90 -92
- 11 -
CSQA Raw Question Bank
- 12 -
CSQA Raw Question Bank
3.What are the important Task Force 18. --------------------- is rated as the number one
Organisation principles skill for a QA ananlyst
- 13 -
CSQA Raw Question Bank
Page 120-122
1. Which of the following is discriminating
listening
Page 123-125
a) Directed at selecting specifice pieces of
information, not the entire communication. Objective questions:
b) Complete message with minimal distortion
c) To put youself in the speakers situation 1. Quality promotes turning problems into
d) To analyse what the speaker has said. opportunities (True / False)
e) None of the above.
2. Customer will give up if complaints are not
2. Which of the following is Therapeutic resolved within
listening
(a) 4 Days
a) Complete message with minimal distortion
b) Directed at selecting specifice pieces of (b) 4 Months
information, not the entire communication.
c) To put youself in the speakers situation (c) 4 Seconds
d) To analyse what the speaker has said.
e) None of the above. (d) 4 Minutes
4. Which one below is not an attribute of 4. Writing a successful report requires a clear
executive management understanding of both _________________
and _____________
a) purposeful
b) Compentent 5. A good report has no more than
c) Analytical ___________ and _______________
d) Decisive
e) Meaningful 6. QA report is designed to
Subjective questions:
- 14 -
CSQA Raw Question Bank
j) Optimization
k) Product quality
l) Process deployment and compliance Page 142-144
m) All of the above
- 15 -
CSQA Raw Question Bank
1. Auditing
8. List any five responsibilities 2. Individual engineering
of a Quality Manager. 3. SPC
4. All the above.
Ans. Refer to page 143 last 6. Which of the below tool help people to
determine whether a process is in control or not:
paragraph for responsibilites.
There are more than five listed. a. Run Chart
b. Control Chart
c. Pareto Chart
9. What is a check list. Why d. U Chart
is it used? 7. Which are following tools belong to Quality
Tool Box:
Ans. Refer to page 145
a. Brainstorming
b. Affinity Diagram
10. What is a quality tool box? c. X-mR chart
d. Pareto Chart
List any five tools most commonly
used in IT. 8. Briefly define the larger quality functions
organised under a quality Manager.
- 16 -
CSQA Raw Question Bank
5. List few plans, a quality manager can use for What is the main identity of a World-class
driving and continually maturing the quality organization
environment Yield high customer satisfaction at minimum
• Stay abreast with new quality cost.
practices
• Study the change in criteria
for winning the MBNQA
- 17 -
CSQA Raw Question Bank
What are the major activities in the ‘Final’ d) All the above
phase of quality management
maturation ? 4) Flow Charts should reference the following:
• Workers are assigned a) Process owners, suppliers and
responsibilities for process definition, Customers
measurement and improvement b) Key deliverables
• Role of QA analysts changes c) Decision points
to performing Quality consulting to d) Interfaces
management and employees in e) Task and Task Sequences
promoting and implementing quality f) Policies, Standards, procedures and
initiatives Tools
g) All of the above
What are the two major drivers that change the
role of the QA analyst Benchmarking
• Management Philosophy used
in the IT group 1) The process of measuring how well a
• Personal belief system of company’s products, services and practices
managers measure against others is known as
benchmarking.
11. In the ‘Initial’ phase of quality function
maturation, what type of management exist? 2) Benchmarking can be done against partners
Authoritarian who could be
- 18 -
CSQA Raw Question Bank
- 19 -
CSQA Raw Question Bank
Answer: a
2. Which of the following
use Scatterplots 8. Data precision is not
a. Defect level highly required for
vs.Skills a. Line chart
b. Cost vs time b. Control chart
c. change response c. Bar chart
d. Defect level vs d. pie chart
Complexity Answer: d
e. All of the above
Answer - a,b,d 9. Which of the following
chart represents data in
3. The following are not percentage
types of scatter plots a. stem and leaf chart
a. Positive b. Bar chart
b. Negative c. Pie chart
c. Zero d. Line chart
d. Non zero Answer: c
Answer - d
10. Stem and leaf chart is
4. Which of the following a variation of
are graphical presentation a. Line chart
tools. b. Pie chart
a. Table c. Bar chart
b. Pie chart d. Control chart
c. Scatter plot e. None of the above
d. Bar chart Answer: c
e. None of the above
Answer - a,b,d 11. It is practical to use
stem and leaf charts when
5. Which of the following absolute no of values is
charts show direction of a. High(More than
events 100)
a. Bar chart b. Low (Usually 100
b. Run chart or less)
c. Line chart c. Zero
d. Table d. None of the above
Answer: c Answer: b
- 20 -
CSQA Raw Question Bank
2. Validation is a
(a) Static Analysis
(b) Dynamic Analysis
(c) None of the above
3. Testing performed by
organizations other than
the developer is
(a) Unit testing
(b) Integration testing
(c) System testing
(d) Acceptance testing
(e) Independent testing
- 21 -
CSQA Raw Question Bank
determining the
8. “Data driven testing may be correspondence between a
called as program and its
(a) White Box testing specifications
(b) Black Box testing True / False
(c) Regression testing
(d) Independent testing 15. Verification techniques are
(a) Program testing
9. “Incremental testing” means (b) Static analysis
(f) White Box testing (c) Dynamic analysis
(g) Black Box testing (d) B & c only
(h)Top-down testing (e) All of the above
(i) Regression testing
(j) Independent testing
- 22 -
CSQA Raw Question Bank
• Thread test
technique
16. What is the difference • Regression
between verification and testing
validation?
• Verification:
The process of
confirming that
interim deliverables
have been developed
according to their
inputs, process Page 234-236
specifications, and Pages 234 - 236
standards.
Questions : Subjective Type
• Validation: The 1.What are the considerations to be
end product meets taken into account for developing
requirements and testing tactics.
expectations under 2.Write down Characteristics and Test
defined operating Tactics for Different Project Types.
conditions. The end 3.How many software system types
product is typically an are there? Mention those different
executable code software system types.
- 23 -
CSQA Raw Question Bank
- 24 -
CSQA Raw Question Bank
a) preventive costs
Page 260-262 b) appraisal costs
c) failure costs
d) none of the above
7) Standard states,
- 25 -
CSQA Raw Question Bank
19) The long range objective for process 1. A _________ is created in this step.
improvement is to 2. What kind of information is present
in the process improvement plan ?
a) eliminate the need for quality 3. Does the process improvement plan
assurance activities need approval ? If yes, who approves it
b) eliminate the need for quality control
?
activities
c) both a and b
Analyse results
d) none of the above
1. Does the process improvement plan
get reviewed ?
2. When and who reviews this plan ?
3. What are the tools used to analyse
Page 269-270 the results ?
Compare results
IDENTIFY AND IMPROVE THE
PROCESS 1. What are the various tools that help
to compare results ?
Assess the Process 2. With what are the results compared
against ?
1. Why should the measurement 3. What can be deduced from the
system, used to assess the process, be comparison reports ?
evaluated ?
Change process or redo steps 4-8
- 26 -
CSQA Raw Question Bank
1. When can the change Ratio data has absolute zero and
recommended in the process meaningful ratios can be
improvement plan be implemented ? calculated.
11) For what are the measurement
dashboards or key indicators used
for?
Measurement dashboards or key
indicators are used to monitor
progress and to initiate change.
12)Before approving for use, what are
the tests that the measures and
Page 274-276 metrics has to undergo?
Question Bank for pages 274-276: - 1) Reliability – Refers to the
consistency of measurement
Knowledge Domain 8 – Quantitative 2) Validity – indicates the degree
Methods. to which a measure actually
measures
Part 1 – Measurement Concepts. 3) Ease of Use and Simplicity
4) Timeliness – Refers whether
the information can be reported
Objective Questions: - in sufficient time to impact the
decisions needed to manage
1) Measure is the basic building block effectively
for measurement program. 5) Calibration - indicates the
2) Metrics is a derived unit of modification of a measurement
measurement so it becomes more valid
3) What are the two types of
measurement? 13)How to know a measurement is
Objective and Subjective good?
Measurement The measures and the resulting
4) Objective measurement uses hard metrics should be
data that can be obtained by 1) simple and precisely
counting, weighing etc. definable
5) Subjective measurement is 2) Objective
normally observed or perceived 3) Easily Obtainable at
6) What is Nominal data? reasonable cost
Nominal data cannot be subjected 4) Valid, measuring what they
to arithmetic operations of any are intended to measure
type and the values cannot be 5) Robust, being relatively
ranked in any natural order. insensitive to intuitively
7) What is Ordinal data? small changes in the
Ordinal data can be ranked, but process or product
differences or ratios between
values are not meaningful.
8) What is interval data?
Interval data can be ranked and
can exhibit meaningful differences
Page 280-282
between values
1) Give 2 examples of metrics for complexity
9) Give an example for interval data?
measurement s?
T.J. McCabe’s complexity metric is
a) Cyclomatic complexity
an example for interval data. b) Knots
10)What is Ratio Data?
2) Explain cyclomatic complexity
- 27 -
CSQA Raw Question Bank
a) Given any computer program, draw its time to failure (MTTF) and mean time
control flow graph, G, where each node between failures (MTBF).
corresponds to a block of sequential
code and each edge corresponds to a 8) How is maintainability measured?
branch or decision point in the program. a) Bill Curtis and others investigated the
The Cyclomatic complexity of such a ability of Halstead’s effort metric E, and
graph can be computed by a simple v (G) to predict the psychological
formula from graph theory, as V (G)=e- complexity of s/w maintenance tasks.
n+2, where e is the number of edges, Assuming such predictions could be
and n is the no. of nodes in the graph. made accurately, complexity metrics
could then be profitably used to reduce
3) Explain Knots the cost of s/w maintenance. A carefully
a) This is calculated by drawing the detailed experiment indicated that s/w
program control flow graph with a node complexity metrics could effectively
for every statement or block of explain or predict the maintainability of
sequential statements. A knot is defined s/w in a distributed computer system.
as a necessary crossing of directional
lines in the graph. The same 9) How can a process be measured?
phenomenon can be observed by a) A process can be measured by either of
drawing transfer-of-control lines from the following
statement to statement in a program i) Attributes of the process, such as
listing. (1) overall development time,
(2) type of methodology used, or
4) A knot is A knot is defined as a necessary (3) the average level of experience
crossing of directional lines in the graph. of the development staff.
ii) Accumulating product measures
5) The quality characteristics for software that into a metric so that meaningful
have received considerable attention are information about the process can
correctness, reliability and maintenance. be provided. These could be
(1) Function points peer person
6) Give the main and alternative measures for month to measure productivity
measuring correctness (2) LOC per person month to
measure productivity
a) Main – Defect counts (number of (3) Number of failures per month
defects in a product) to measure effectiveness of
b) Alternatives – computer operations
i) Number of design changes (4) Number of helpdesk calls per
ii) Number of errors detected by code KLOC to measure
inspectors effectiveness of system design
iii) Number of errors detected in method
program tests
iv) Number of code changes required 10) Give the standard s/w process metrics
currently available:
7) How is reliability measured? a) Number of deliverables completed on
a) It would be useful to know the time
probability of s/w failure, or the rate at b) Estimated costs Vs actual costs
which s/w errors will occur. But this c) Budgeted costs Vs actual costs
can only be estimated from data d) Time spent fixing errors
collected in s/w defects as a function of e) Wait time
time. If certain assumptions are made, f) Number of contract modifications
this data can be used to model and g) Number of proposals submitted Vs
compute s/w reliability metrics. These proposals won
metrics attempt to indicate and predict h) Percentage of time spent performing
the probability of failure during a value added tasks
particular time interval, or the mean
- 28 -
CSQA Raw Question Bank
- 29 -
CSQA Raw Question Bank
3. Risk management is an
independent auditing process.
True/False
Subjective question.
4. Risk should be the sole
responsibility of project 1. Your IT organisation need to
manager. True/False integrate new technology. As a QA
analyst what are the roles and
5. Within many software responsibilities you need to
development organizations risk perform to ensure that the
management remains ad hoc integration is effective without
and _____________. compromising quality.
a. Customer 1. True
b. Management 2. True
c. Development team 3. False
d. All of the above 4. False
e. None of the above 5. Incomplete
6. True
8. Mitigating the risk by 7. d
a. Minimizing the 8. d
probability of occurrence
- 30 -
CSQA Raw Question Bank
Ans: True
Page 298-300
Quiz on Knowledge Domain – 8: Quantitative 6. What is risk?
Methods
Ans: Risk is the opportunity for something to
go wrong.
1. A measurement program is defined as
the ----------------------------------------
7. How do we Manage and control
Ans: Entire set of activities that occur around process?
quantitative data.
Ans:
Measure Size by metric/measure
2. Mature organization use quantitative LOC, Boxes, procedures, and units of output
data to determine to answer
how much we have made/left to
a. Requirements are complete make
b. To prevent problems
c. Budget Measure Status by, metric/measure
d. Schedule and project status Earned value, amount of scheduled
e. a&b work, % of each
f. c&d activity completed.
g. All of the above
Measure Effort (hours spent for each
Ans: e phase of SDLC) to answer how much
effort has been
3. Immature organization use quantitative expended
data to determine
Measure Schedule (calender times of
a. Requirements are complete activity completed)
b. To prevent problems
c. Budget
d. Schedule and project status 8. How do we manage control and
e. a&b product?
f. c&d
g. All of the above Ans: Measure Quality by no.of defects,
Mean time to failure (MTTF) Mean time
Ans: f to repair
(MTTR)
Measure Performance by
4. What are four major uses of technical performance, measures
Measurement? specified by customer
Ans: 1.Manage and control the process and management.
2. Manage and control the product
(review and testing)
3. Improve the process 9. How do we improve the process?
(quantitative data gathered during Ans: Identify the current performance, find
process execution can how cost-efficient is the process. By
identify the weaknesses and measuring Time and effort.
therefore opportunities for improvement)
4. Manage the risks 10. How do we manage risks?
5. Same software development process Ans: Identify the risks, its frequency,
may be followed to produce two different probability of risks occurring and impact of
applications each risk if it occurs derive risk
True /False management plan.
- 31 -
CSQA Raw Question Bank
Ans: 1.build the measurement base c. Select a measure or metric for each
2.Manage towards results result. Should be only 3 to 5 but not
3. Manage by process greater than 7
4. Management by fact
d. Consider tradeoff between the
12. What are the key points in first phase? results. For example consider the
desired result Complete on time
Ans: Define the objectives for the might affect Easy-to-read
measurement program documentation.
- 32 -
CSQA Raw Question Bank
Objective-Paper-1
a. Stubs
b. Manual simulation
1. To ensure effectiveness of checklists, c. Instrumentation
checklists should have only yes and no d. Coverage metrics
responses. e. All of the above
f. None of the above
a. True
b. False 8. Configuration management is not the
process of
2. Quality is an attribute of
a. Controlling the release of items
a. a product through the life cycle
b. a service b. Evaluating & scheduling changes
c. a process to configurable items
d. all of the above c. Recording & reporting the status of
e. none of the above config. items
d. Verifying the completeness of
3. The characters of a service level are configurable items
- 33 -
CSQA Raw Question Bank
a. QC activity a. Measure
b. QA activity b. Define
c. Change
19. Which is the most important practical & d. Improve
economical way of meeting customers
needs.
a. Reviews
b. Testing
- 34 -
CSQA Raw Question Bank
a. RWI
b. Causal Analysis
c. SPC
d. Defect Prevention
a. True
b. False
a. Standard
b. Requirement
c. Expected result
d. Value
e. All of the above
f. None of the above
a. Standards
b. Quality attributes
c. Quality control
d. Procedures
e. Rework
- 35 -
CSQA Raw Question Bank
b. System size
34. Given the following costs: c. Total run time
Requirements analysis - $ 1000 d. MTBF
Rework - $ 700
Code review - $ 500 41. The Quality manager will find it difficult to
Review of User Documents - $ effectiviely implement the QAI Quality
600 Improvement Process, unless his
Continuing Edn. Progrms. - $ 800 organisation is willing to accept the Quality
Design - $ 400 principles as a
a. the organisation’s policy
The cost of Quality is b. a challenge
a. $1400 c. the corporate vision
b. $1900 d. the organisation’s goal
c. $2400 e. a management philosophy
d. $2600 f. all of the above
e. $4000
42. Pareto chart provides corrective action for
35. Verification ensures that the executable high-frequency causes of problems
system performs as specified a. True
a. True b. False
b. False
43. Function Points
36. When viewing product /service Quality from a. provide a measure of the system size
the customer’s view, a feature added by the b. can be used to compare different kinds
producer, that was not included in the of application systems
product specifications / requirements would c. together with past data can be used to
be called: estimate future effort
a. an enhancement d. all of the above
b. a defect e. none of the above
c. an unspecified need identified by the
builder of the product / service 44. Restructuring or modifying existing
d. a correction software system to take advantage of newer
e. none of the above hardware and software technologies or to
introduce efficiencies, or to improve
37. Prevention is a more effective means of maintainability is called
improving Quality than appraisal a. enhancements to the software
a. True b. perfective maintenance
b. False c. re-engineering of the software
d. none of the above
38. There are --------- no. of function types
a. 2 45. Who is normally responsible for initiating
b. 3 the suggestion-day program?
c. 4 a. DP manager
d. 5 b. Group moderator
e. 6 c. Any one of the above
d. None of the above
39. The purpose of constructive criticism is to
improve 46. The fundamental mistakes that impede an
a. productivity individual from becoming a leader are:
b. profitability a. Isolation
c. the HR climate b. Inability to reward
d. creativity c. Lack of business perspective
d. All of the above
40. The usual denominator in a reliability metric
is 47. “Training will be imparted to all employees”
a. Development time . This statement is a
- 36 -
CSQA Raw Question Bank
a. Vision
b. Goal
c. Principle
d. Value
- 37 -
CSQA Raw Question Bank
3. Malcolm Baldridge award was named by a 10. “Testing will exercise 90% of the code”. Is
public law after Malcolm Baldridge who it a
was the secretary of Defense a) Vision
TRUE/FALSE b) Standard
c) Policy
4. Modifying existing standards to better match d) Goal
the need of a project or environment is e) Value
f) Non of the above
a) Definition
b) Standard for a standard 11. “The organization will foster an atmosphere
c) Tailoring of creativity”. Is it a …
d) Customization a) Vision
e) None of the above b) Mission
c) Policy
5. Malcolm Baldridge National Quality Award d) Goal
has the following eligibility categories e) Value
f) None of the above
a) Approach
b) Deployment 12. The following is problem identification tool
c) Results a) Flow Chart
d) All of the above b) Histogram
e) Manufacturing, Service and small c) Scatter Diagram
businesses d) Force Field Analysis
f) None of the above e) None of the above
6. Quality experience indicates that about 40 13. The following is a problem analysis tool
percent of all defects are directly attributable a) Pareto Chart
to incorrect or ineffective processes b) Histogram
TRUE/FALSE c) Force Field Analysis
d) All of the above
7. The process of helping the progress of some e) None of the above
event or activity is
14. When you need to identify and explore and
a) Negotiation display the possible causes of a specific
b) Conflict Resolution problem or condition, you use,
c) Facilitation a) Control Charts
d) Influencing b) Histogram
e) None of the above c) Scatter Diagram
d) Ishikawa Diagram
8. The ability to apply beliefs, standards, e) None of the above
guidelines, policies, procedures and values
- 38 -
CSQA Raw Question Bank
- 39 -
CSQA Raw Question Bank
- 40 -
CSQA Raw Question Bank
- 41 -
CSQA Raw Question Bank
41. The process of securing future processing 49. Internal System Controls are used to ensure
capability with proper data for future a) Data integrity
contingencies by duplicating systems b) Process Integrity
procedures and data is c) Financial Integrity
a) providing a Help Desk d) All of the above
b) Database Design e) None of the above
c) Artificial Intelligence
d) System Backup 50. As the IT Director, you buy a new
e) All of the above productivity improvement tool, train the
f) None of the above users, do the set up, provide support,
helpdesk and even give access to your
42. The activities performed to increase the personal phone. However, after 6 months
functionality of a current production system you find that no one is using the tool. What
to better service the changing business needs went wrong? (write only the most important
is reason)
a) Development
b) Maintenance ________________________
c) Reengineering
d) Enhancement
e) None of the above
43. To tap ideas from an entire group we may
use
a) Nominal Group technique
b) Check sheets
c) Pareto chart
d) Brainstorming
e) None of the above
- 42 -
CSQA Raw Question Bank
56. Malcolm Baldridge National Quality Award 64. The process of helping the progress of some
has the following dimensions event or activity is
g) Approach (a) Negotiation
h) Deployment (b) Conflict Resolution
i) Results (c) Facilitation
j) All of the above (d) Influencing
k) Manufacturing, Service and small (e) None of the above
businesses
l) None of the above 65. Developing and asking questions for the
purpose of collecting oral data to be used in an
57. Six sigma quality, when expressed as defects analysis or evaluation is
per million parts represents: (a) Effective listening
a) 6667 defects per million (b) Interviewing
b) 3444 defects per million parts (c) Negotiation
c) 687 defects per million parts (d) None of the above
d) 233 defects per million parts
e) 3.4 defects per million parts 66. An example of deployment of a quality
f) None of the above approach is
(a) The degree to which the approach
58. The following is not a category in MBNQA embodies effective
criteria evaluation/improvement cycles
a) Leadership (b) The appropriate and effective
b) HR Focus application to all product and service
c) Quality Management characteristics
d) Information and Analysis
- 43 -
CSQA Raw Question Bank
(c) The effectiveness of the use of tools, 75. The statement of an enterprise's commitment
techniques and methods to quality is its
(d) The contribution of outcomes and g) Vision
effects to quality improvement h) Mission
(e) The significance of improvement to i) Quality Policy
the company's business j) Goal
k) Value
67. “Kanban” means creating a visible record and l) None of the above
is a “pull” system
a) True b)False 76. The following is problem identification tool
f) Flow Chart
68. The concept of continuous improvement as g) Histogram
applied to quality means h) Scatter Diagram
a) Employees will continue to get better i) Force Field Analysis
b) Processes will be improved by a lot of j) None of the above
small improvements
c) Processes will be improved through a few 77. The following is a problem analysis tool
large improvements f) Pareto Chart
d) Improved technology will be added to the g) Histogram
process, such as acquiring case tools h) Force Field Analysis
e) The functionality of the product will be i) All of the above
enhanced j) None of the above
69. The purpose of cost-of -quality computations 78. When you need to identify and explore and
is to show how much is being spent for the display the possible causes of a specific
quality control and quality assurance program problem or condition, you use,
a) True b) False f) Control Charts
70. Management must g) Histogram
a) Mange By Objective (MBO) h) Scatter Diagram
b) Manage By Power (MBP) i) Ishikawa Diagram
c) Manage By Objection (MBO) j) None of the above
d) Manage By People (MBP)
e) All of the above 79. Quality Assurance personnel must not be
f) None of the above involved in changing work products
a) True b) False
71. Customer satisfaction is a
a) Tactical measurement 80. The term “benchmarking” means
b) Strategic measurement e) Comparing with past data from your
c) Operational measurement organization
d) All of the above f) Comparing with the results of a market
survey
72. Abilities of a person relate to g) Comparing with the results of a customer
a) Image of the person survey
b) How he listens and does not generalize h) None of the above
c) Performing job tasks using skills
d) Organizes thoughts before speaking 81. Employee awareness training courses are
e) All of the above based on the fact that understanding precedes
behavior change
73. Conformity behavior can be used to a) True b) False
a) Conform people to a group
b) Make everyone face the door in a lift 82. The reason(s) that one person hears what
c) Change behavior another person says is:
d) Find a leader for the group f) People are too impatient to listen
e) None of the above g) People are preparing what they will
say next rather than listening
74. Awareness training should not last over two h) External stimuli breaks the train of
hours thought in listening
g) True b) False i) All of the above
j) None of the above
- 44 -
CSQA Raw Question Bank
b) a Contract
83. Function Point is not a measure of c) a Service Level Agreement
f) Effort d) None of the above
g) complexity
h) usability 92. A quality assurance analyst can estimate the
i) all of the above frequency or severity of events using
j) size a) Judgmental Sampling
k) None of the above b) Statistical Sampling
c) All of the above
84. Cost of Quality includes d) None of the above
f) Preventive costs
g) Corrective costs 93. The ultimate responsibility for good internal
h) Appraisal costs control rests with the
i) All of the above a) QA group b) Design team c)
j) None of the above Management d) Audit Group
- 45 -
CSQA Raw Question Bank
- 46 -
CSQA Raw Question Bank
- 47 -
CSQA Raw Question Bank
- 48 -
CSQA Raw Question Bank
- 49 -
CSQA Raw Question Bank
- 50 -
CSQA Raw Question Bank
c) performance
39 Pareto chart helps in identifying the few d) operation ease
significant problems from many trivial
problems. 46 Function point analysis involves:
- 51 -
CSQA Raw Question Bank
a) efficiently
b) effectively
c) economically
d) all of the above
e) none of the above
- 52 -
CSQA Raw Question Bank
Pareto chart does not provide corrective action for high-frequency causes of problems
Cost of quality is sometimes called cost of ----------------------------------------------
A. Failure
B. Prevention
C. Rework
D. Non-conformance Given the following costs:
Requirements
Defects are typically less expensive to correct in the maintenance analysis
phase than - $ 1000
in requirements phase. Rework - $ 700
- $ 500 Review of User Documents - $ 600
A. True Continuing Edn. Progrms. - $ 800 Design - $ 400
B. False System Testing - $ 500
A. To improve quality
B. To remove causes of failure
C. To help people to do a better job with less effort
D. All of the above
E. None of the above
Quality is an attribute of: An activity that verifies compliance with policies and procedures and ensures that resources a
A. a product
B. a service an inspection
C. a process
D. all of the above
E. none of the above an assessment
Code auditors
The first stage in the software life cycle where test data is generated is: are useful to programmers as a means of self checking their routines prior to tur
for integration testing. These tools are also of value to software product assurance personnel d
A. Planning stage integration testing, prior to formal validation testing and again prior to customer delivery.
B. Requirement
C. Analysis
D. Design
E. Construction
- 53 -
CSQA Raw Question Bank
A formal review of a software item involves: According to Dr. Deming and other quality experts, the root cause of most of the defects is ba
Test coverage analyser monitor the execution of a program during program testing in order to
measure the completeness of a set of program tests and adequacy
Total Quality
of test Management
data. involves ----------------------- in an organisation.
A. Prevention
B. Rework for rectification
- 54 -
CSQA Raw Question Bank
A useful tool to visualise, clarify, link, identify and classify possible causes of a problem is
-----------------------------------. The objective of risk analysis is to help management strike an economic balance between the
of risks and the cost of protective measures.
A. Histogram
B. Pareto Analysis
C. Control Chart
D. Histogram
E. None of the above Verification that current changes have not adversely affected previous functionality is
-----------------------------------.
Quality does not happen unless management wants it to happen.
System Testing
A. True Acceptance Testing
B. False Regression Testing
Performance Testing
Extent to which a system can be expected to perform its intended function with required precision is
-----------------------------. The management of company X had decided to go in for reengineering of the application syst
The company aims to have benefit worth $100,000 per year from the second year from now. T
A. Reliability company X believes in a 20% interest per annum as a reasonable return on investment. What i
B. Correctness present of value of money?
C. Efficiency
Methods for determining the current performance, accuracy or efficiency of a product for the
purpose of measuring current performance or measuring future or past variances from current
performance is ----------------------------------.
A. Performance Testing The intent of quality control check list should be to improve the quality of the product being
B. Statistical Process Control controlled by investigative means
C. Benchmarking
D. Quality Control
- 55 -
CSQA Raw Question Bank
Pareto diagrams are simple bar graphs that focus attention on the factors that are not most
significant to a problem.
A. True
B. False
A. Walkthroughs
B. Inspections
C. Audits
D. Check point reviews
E. None of the above
A product development has taken 30 person months for analysis, 35 person months for design, 50
person months for construction, and 40 person months for testing.
15 person months were spent on reviews, walkthroughs, inspections and project management. Total
number of lines produced was 85000.
The initial estimate for the project was 20 person years for developing 100,000 lines of code.
A. 0
B. 5
C. 70
D. 15,000
- 56 -
CSQA Raw Question Bank
- 57 -
CSQA Raw Question Bank
ii. Mature understanding by all the 19. The most common reason for the presence
employees of a large number of bugs in a software
iii. Commitment from Management product is,
iv. Quality Policy i. Incompetence of the developer
ii. Incompetence of the tester
14. Which, of the four given below, is not one iii. Bad requirements
of DR Edward Deming’s 14 Quality iv. Wrong use of tools and techniques
Principles ?
i. Give adequate training 20. Which of the CMM levels implies a defined
ii. Have a number of numerical goals set process,
iii. Work as one team. (Sink differences) i. Level One
iv. Senior Management ii. Level Two
must push all other points iii. Level Three
constantly and consistently iv. Level Four
15. According to Dr. Ishikawa, the term v. Level Five
‘Strive for Zero Defects’ helps the staff
to achieve it.
TRUE/FALSE
- 58 -
CSQA Raw Question Bank
- 59 -
CSQA Raw Question Bank
- 60 -
CSQA Raw Question Bank
project/product compared to
15. “SPC” or Statistical Process Control, is a previous state
i. Using statistical iii. A measure of the
tools, techniques and present position of your
methodologies, to monitor project/product compared
projects against a future (estimated)
ii. Controlling a process, state
using statistical techniques. iv. A measure of your
iii. Using statistical product compared to an
techniques and tools, to existing industry standard.
identify the reasons for
occurrence of defects and
prevent them from occurring
again
iv. None of the above
19. “Benchmarking” is
i. A measure of the
current position of your
project/product
ii. Measure of the
present position of your
- 61 -
CSQA Raw Question Bank
- 62 -
CSQA Raw Question Bank
Objective-Paper-8 b) Level 2
c) Level 3
1. TQM means quality of management d) Level 4
rather than management of quality e) Level 5
True/False
- 63 -
CSQA Raw Question Bank
- 64 -
CSQA Raw Question Bank
- 65 -
CSQA Raw Question Bank
- 66 -
CSQA Raw Question Bank
- 67 -
CSQA Raw Question Bank
- 68 -
CSQA Raw Question Bank
- 69 -
CSQA Raw Question Bank
- 70 -
CSQA Raw Question Bank
F. Top Management
- 71 -
CSQA Raw Question Bank
14. Function Point is not a measure 19. You can improve the Quality of a
of process by
l) Effort v. Making large improvements, in a
m) Complexity few areas
n) Usability vi. Making small improvements, in
o) All of the above many areas
p) Size vii. Implementing tools, techniques
q) None of the above and methodologies
viii. Spreading awareness about
15. Normal variance in the operation Quality
of processes is due to
f) Assignable causes 20. In Statistics, ‘Mean’, ‘Median’
g) Random causes and ‘Mode’ are measures of
h) Common causes v. Central Tendency
i) Uncommon causes vi. Variance
j) None of the above vii. Deviation (Standard Deviation)
viii. Dispersion
- 72 -
CSQA Raw Question Bank
D A
C
B
a. Histogram
b. Pie Chart
c. Bar Chart
d. Check Sheet
- 73 -
CSQA Raw Question Bank
- 74 -
CSQA Raw Question Bank
d. all of the above 38. Quality Assurance would determine the need
e. none of the above for
A) Acquire or help install system development
31. Process once installed ____________ would Methodologies.
measure them find weaknesses in the B) estimation processes
____________ and then __________ those C) system maintenance process
weaknesses and to _____________, D) All the above
____________ process.
39. Quality control relates to/concerned with a
32. It is possible to have _____________ without specific product or service (TRUE/FALSE)
QA.
40. Quality Assurance would measure the
33. Define QA and QC. process to find weakness in the processed then
correct those weakness to continually improve
34. Group the following as QA or QC: the process. (T/F)
a. It relates to specific product or service 41. Quality control verifies whether specific
b. It requires whether specific attributes are in or attribute(s) are in or not in a specific product or
in, a specific product. service.(T/F)
c. It identifies defects for the primary purpose
correcting defects. 42. Quality Assurance evaluates whether or not
d. It is the responsibility of the worker quality control is working for the primary
e. It helps establish processes purpose of determining whether or not there is a
f. it sets up measurement programs to evaluate weakness in the process (T/F)
processes
g. it identifies weaknesses in process and 43. Quality assurance is always called quality
improves the control over quality control because it evaluates
h. it is a management responsibility frequently whether quality control is working (T/F)
performed by a staff function
i. ______ evaluates whether or not _______ is 44. Quality Assurance is concerned with all of
working the primary purpose of determining the products that will ever be produced by a
whether or not t process. ( T/F)
is a weakness in the process
j. it is concerned with specific product. 45. Quality assurance personnel should not ever
k. it is concerned with all of the products that perform quality control unless doing ti to
will validate quality
be produced by a process control is working. (T/F)
l. it some times called __________ over _______
because it evaluates whether ___________ is 46. Define Quality Assurance:
working
m. __________ personnel should not ever 47. Define Quality Control:
perform ______
unless doing it to validate ___________is 48. What does quality mean?
working.
49 . Between quality control and quality
35 - A Differentiating quality control from assurance, quality control is the most important.
quality assurance T/F
36. Quality Control is an activity which verifies 50. Quality is an attribute of the product or a
whether or not the product produced meets service. T/F
standards (TRUE/FALSE)
51. Quality is achieved through
37. Quality Assurance is an activity which ________________
establishes and evaluates the processes which
produce the products ( T/F) 52. What is quality control?
- 75 -
CSQA Raw Question Bank
- 76 -
CSQA Raw Question Bank
1.Develop information system policies, 89. Non conformance must be detected as early
procedures and as possible
standards. measured. T/F
2.Acquire and implement tools and
methodologies. 90. High defect prone products and processes are
3.Market/create awareness programs/concepts. identified
4.Measure quality. testing the product after all processes are over. T/
5.Defect analysis. F
6.Statistical process control.
91. 80% Of all defects are attributable to
80. Quality means meeting requirements, incorrect ineffective processes. T/
meeting customer needs and a defect free
product 92. _____________ is responsible for processes
(a) Customers view point (b) Producers view and must accept the responsibility for
point nonconformance at least to 80% attributable to
(c) a and b the processes.
- 77 -
CSQA Raw Question Bank
96. The topics of standards and nonconformance 106. Consistency of execution is taken to mean
should discussed in every meeting to improve the existence of defined and
quality. T/F
a suitably recorded processes with clear
delineation of responsibilities
97. Quality is a ______________ Responsibility. b consistently executing operations
1. Staff c other factors
2. Line
3. Both 107. Evaluations for quality assurance of
products and services depend upon
98. Everyone should be involved in quality
improvement programs. T/F a. How responsibilities are distributed or
99. Types of measurement of performance are - organized or
1.strategic, statical, operational b. Whether or not the company has a quality
2.Strategic, tactical, operational organization or officer
c. None of the above
100. Match:
1. Strategic - a. Operational management 108. Quality results category examines the
2. Tactical - b. Executive management company's quality improvement and quality
3. Operational - c. Middle management levels by themselves and in relation to those of
16. Quality assurance is a ____________ competitors. (T/F)
function. (line/staff)
109. The number and types of measures for
101. Quality Assurance Dept should not have quality results depend upon factors such as
independent reporting line to senior management
and they should report to middle management a the company's size
for better performance (T/F). b types of products and services
c competitive environment
102. Generally the strength of QA dept should be d all the above
______________ percent of size of organization.
110. Quality results evaluations consider whether
a) 1 to 2 or not the measures are sufficient to support
b) 3 to 6 overall improvement and to establish clear
c) 10 to 20 quality levels and comparisons. (T/F)
d) 70 to 80
111. Methods used to determine whether or not
103.. Evaluations of planning are based upon the the process is under control and is helpful in
thoroughness and effectiveness of processes identifying root cause of process problems which
including the information used. (T/F) are causing defects:-
A) Prioritisation matrix
104. Evaluations for strategic quality planning B) statistical process control
do not depend upon C) pareto chart
D) control charts
a. How planning activities are organized
b. Whether or not the company has a planning
department or officer 112. The method by which product correct is
c. a & b determined and action is
initiated when non-conformance is detected is:
105. Quality assurance of products and services A) Quality assurance
evaluations take into account consistency of B) Quality control
execution of quality operations that incorporate a C) Auditing
D) None of the above
- 78 -
CSQA Raw Question Bank
- 79 -
CSQA Raw Question Bank
- 80 -
CSQA Raw Question Bank
140 An activity that verifies compliance with A) Knowledge of standards for the professional
policies and procedures and ensures that practice of internal auditing
resources are conserved is B) To perform statistical process control
A) an inspection C) To acquire and implement tools
B) an audit
C) a review 148. QAI believes that the main role of auditing
D) an assessment is to
141. Which is rated the number one skill A) Find and implement solutions for the
required for the quality assurance analyst? problems
A) Reading B) measure quality
B) Oral C) market the awareness of quality concepts
C) Writing D) identify and report problems
D) Arithmetic
149. As a Quality Assurance professional, which
of the following skills do you feel is the most
142. Quality Assurance Manager is responsible important for your profession
for Quality Assurance activity
A) True A) Communication, written and oral
B) False B) Measurement
C) Tools, techniques and methodologies
143. Quality assurance is D) Combination of any of the above two
A) A management responsibility E) None of the above
B) Worker's responsibility
150. Your manager asks you to come up with a
144. The five generally accepted criteria namely standard. The order in which you will
code of ethics, statement of responsibilities, accomplish it is
Program of continuing education, Common body A) Standard, Process and then, Policy
of knowledge and Certification program are B) Policy, Standard and then, Process
recognized for C) Process, Standard and then, Policy
D) Policy, Process and then, Standard
A) A Profession
B) An internal audit 151. According to Dr. Ishikawa, the term ‘Strive
C) Quality assurance for Zero Defects’ helps the staff to achieve it.
D) All of the above A) TRUE
E) None of the above B) FALSE
145. The difference between Internal auditing 152. You are a Quality Assurance professional.
and Quality Assurance center heavily around You have been asked to address a problem,
A) Statement of responsibilities where the customer is reporting a lot of bugs.
B) Common body of knowledge You will
C) Code of ethics A) Initiate more Reviews, Walk-through and
D) A and B Inspections
E) A and C B) Attach the number of bugs reported on a
F) A, B and C product to the concerned developers
performance appraisal
146. Internal auditing can get involved in C) Recommend that more time be spent on
A) Developing procedures system testing
B) Standards D) Do a root cause analysis of the bugs and try
C) A and B to prevent them from occurring again
D) Evaluating the interaction of group
companies 153. An example of deployment of a quality
approach is:
147. Skills to be possessed by internal auditor A) The degree to which the approach embodies
but need not by a quality analyst are effective evaluation cycles
- 81 -
CSQA Raw Question Bank
1. Histogram
2. Scatter diagram
3. Stratification
4. Check sheet
5. Run Chart
- 82 -