New Floor Timeline Template

PROJECT NAME PROJECT MANAGER

WBS TASK NAME START DATE FINISH DATE

1 Proposal and Documentation


2 Design (Seating design for cubicals)
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10.
6 Site Preparation
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10.
7 Foundation/Framing
8 Roof/Exterior Finishes
9 Plumbing/Electrical/HVAC
10 Insulation/Drywall
11 Interior Finishes
12 Painting
13 Flooring/Carpet
14 Fixtures/Appliances
15 Landscaping/Design( As per building format)
16 Final Details/Closure
16.1
16.2
16.3
16.4
16.5
16.6
16.7
16.8
16.9
16.10.
17 Miscellaneous
17.1
17.2
17.3
17.4
17.5
17.6
17.7
17.8
17.9
17.10.
MANAGER START DATE
4/8/2019

DURATION 4/8/2019 4/15/2019 4/22/2019 4/29/2019


PERCENTAGE COMPLETE
IN DAYS M T W R F M T W R F M T W R F M

1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%

1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%

1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
1 0%
4/29/2019 5/6/2019 5/13/2019 5/20/2019 5/27/2019 6/3/2019
T W R F M T W R F M T W R F M T W R F M T W R F M T W
6/3/2019 6/10/2019 6/17/2019 6/24/2019 7/1/2019 7/8/2019
R F M T W R F M T W R F M T W R F M T W R F M T W R F
7/15/2019 7/22/2019 7/29/2019 8/5/2019 8/12/2019 8/19/2019
M T W R F M T W R F M T W R F M T W R F M T W R F M T
8/19/2019 8/26/2019 9/2/2019 9/9/2019 9/16/2019 9/23/2019
W R F M T W R F M T W R F M T W R F M T W R F M T W R
9/23/2019 9/30/2019 10/7/2019 10/14/2019
F M T W R F M T W R F M T W R F