Production Plant
Annual Demand
Cost (per Capacity (in
Plant 1,000 lbs) 1,000 lbs)
(in 1,000 lbs) From/To Mexico Canada Venezuela
Mexico $95.01 2200 300 Mexico 0 $11.40 $7.00
Canada $97.35 370 260 Canada $11.00 0 $9.00
Venezuela $116.34 450 1600 Venezuela $7.00 $10.00 0
Frankfurt $76.69 4700 2000 Frankfurt $10.00 $11.50 $12.50
Gary $102.93 1850 2640 Gary $10.00 $6.00 $11.00
Sunchem $153.80 500 1190 Sunchem $14.00 $13.00 $12.50
100.7 7990 Import Duty 0.00% 0.00% 50.00%
Optimized Costs
Mexico Canada Venezuela Frankfurt Gary Sunchem
Mexico $285.03 $0.00 $0.00 $0.00 $354.50 $0.00
Canada $0.00 $253.11 $0.00 $0.00 $118.80 $0.00
Venezuela $0.00 $0.00 $523.53 $0.00 $0.00 $0.00
Frankfurt $0.00 $0.00 $1,538.53 $1,533.80 $330.64 $1,135.13
Gary $0.00 $0.00 $0.00 $0.00 $1,904.21 $0.00
Sunchem $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total= $7,977.28
Plant Capacity Idle
22 15.8
3.7 0
4.5 0
47 0
18.5 0
5 5