Objectives:

0 - Set-up Asset Number to comply with Global Taxonomy as per Global Asset Number (G.A.N) (e.g KR2-TRH04-ENG-TBO)
1 - Measure Asset useage various asset levels (Asset/Component and Sub-Compnonent)
2 - Schedule Asset (Component/Sub-Components) based on usage and last change-out (Actual End Date)
3 - Suppress Asset Activities across different asset levels (Parent/Child)
4 - Track COST at different asset levels (Parent/Child) based on incedences of Asset Activities (No. of times activities are performed)
5 - Minimise the no. of Schedules per Operating Asset (i.e TRUCK - Parent Asset) to three (3) as listed below:
- 1 x BASE DATE Schedule (for Calendar based activities such as Daily Inspections and 3 Monthly AFFF Inspections)
- 1 x BASE METER Schedule (for activities to be planned on specific meter intervals such as 250 hr PM Service, 500 hr PM Service etc)
- 1 x ACTUAL END DATE Schedule (for activities to change out components and sub-components at specific meter intervals such as Engine, Turbocharger and Injectors etc)

We would prefer to set-up Asset Numbers with 3 or 4 levels (as per Senario 1) and comply with Taxonomy Document (G.A.N and Appendix 8)

However, this creates problems with regards to Activity Association, Activity Suppressions and Asset Meters when scheduling.

We have provided examples (Senarios) to explain/demonstate our understanding, preference and the perceived implications and ramifications.

Can you please review the attached worksheets and confirm which senario best meets system requirements.
Objectives:
4 - Track COST at different asset levels (Parent/Child) based on incedences of Asset Activities (No. of times activities are performed)

We would prefer to set-up Asset Numbers with 3 or 4 levels (as per Senario 1) and comply with Taxonomy Document (G.A.N and Appendix 8)
However, this creates problems with regards to Activity Association, Activity Suppressions and Asset Meters when scheduling.
We have provided examples (Senarios) to explain/demonstate our understanding, preference and the perceived implications and ramifications.
Can you please review the attached worksheets and confirm which senario best meets system requirements.

Senario Parent Asset Number


1 Asset Group Asset Number Asset Description G.A.N.

CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04


CATAD55ENG KR2-TRH04-ENG KR2-TRH04-ENG ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04-ENG
CATAD55ENG KR2-TRH04-ENG KR2-TRH04-ENG-INJ INJECTOR ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04-ENG-INJ
CATAD55ENG KR2-TRH04-ENG KR2-TRH04-ENG-TBO TURBO ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04-ENG-TBOL
CATAD55ENG KR2-TRH04-ENG-COOL KR2-TRH04-ENG-COOL-PPW PUMP WATER ENGINE SYSTEM COOLING SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04-ENG-COOL-PPW

Senario Parent Asset Number


2 Asset Group Asset Number Asset Description G.A.N.

CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04


CATAD55ENG KR2-TRH04 KR2-TRH04-ENG ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04-ENG
CATAD55ENG KR2-TRH04 KR2-TRH04-INJ INJECTOR ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04-ENG-INJ
CATAD55ENG KR2-TRH04 KR2-TRH04-TBO TURBO ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04-ENG-TBOL
CATAD55ENG KR2-TRH04 KR2-TRH04-PPW PUMP WATER ENGINE SYSTEM COOLING SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 KR2-2123-TRH04-ENG-COOL-PPW
Objectives:
3 - Suppress Asset Activities across different asset levels (Parent/Child)
4 - Track COST at different asset levels (Parent/Child) based on incedences of Asset Activities (No. of times activities are performed)

Question: Can activity "CATAD55KR.006" suppress its' child activity "CATAD55KR.007/8/9" as per Senario 1 (This is our preference, but does not comply with extract from Manual listed below) ?
OR
Do we make the sub-components such as TURBO the same level as ENG to allow for suppression "to asset activities in the same asset level" whilst maintaining activity association to the correct asset as per Senario 2?
OR
Do we HAVE to associate activities to the ENG only to allow for suppression "to asset activities in the same asset level" as per Senario 3?
IF Senario 3 - Does this mean that we will have NO activities associated with the Turbo (i.e KR2-TRH004-ENG-TBO) ?

Senario Parent Asset Number Activity


1 Asset Group Asset Number Asset Description Suppression Activity Description
Number
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.001 Daily Inspection
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.002 CATAD55KR.003 250 HOUR SERVICE
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.003 CATAD55KR.004 500 HOUR SERVICE
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.004 CATAD55KR.005 1000 HOUR SERVICE
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.005 2000 HOUR SERVICE
* Cannot Supress
CATAD55ENG KR2-TRH04-ENG KR2-TRH04-ENG ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.006 See Note REPLACE ENGINE
CATAD55ENG KR2-TRH04-ENG KR2-TRH04-ENG-INJ INJECTOR ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.007 CATAD55KR.006 REPLACE TURBO
CATAD55ENG KR2-TRH04-ENG KR2-TRH04-ENG-TBO TURBO ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.008 CATAD55KR.006 REPLACE FUEL INJECTORS
CATAD55ENG KR2-TRH04-ENG-COOL KR2-TRH04-ENG-COOL-PPW PUMP WATER ENGINE SYSTEM COOLING SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.009 CATAD55KR.006 REPLACE WATER PUMP

Senario Activity
2 Asset Group Parent Asset Number Asset Number Asset Description Suppression Activity Description
Number
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.001 Daily Inspection
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.002 CATAD55KR.003 250 HOUR SERVICE
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.003 CATAD55KR.004 500 HOUR SERVICE
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.004 CATAD55KR.005 1000 HOUR SERVICE
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.005 2000 HOUR SERVICE
CATAD55ENG KR2-TRH04 KR2-TRH04-ENG ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.006 REPLACE ENGINE
CATAD55ENG KR2-TRH04 KR2-TRH04-INJ INJECTOR ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.007 CATAD55KR.006 REPLACE TURBO
CATAD55ENG KR2-TRH04 KR2-TRH04-TBO TURBO ENGINE SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.008 CATAD55KR.006 REPLACE FUEL INJECTORS
CATAD55ENG KR2-TRH04 KR2-TRH04-PPW PUMP WATER ENGINE SYSTEM COOLING SYSTEM TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.009 CATAD55KR.006 REPLACE WATER PUMP

Senario Parent Asset Number Activity


3 Asset Group Asset Number Asset Description Suppression Activity Description
Number
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.001 Daily Inspection
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.002 CATAD55KR.003 250 HOUR SERVICE
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.003 CATAD55KR.004 500 HOUR SERVICE
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.004 CATAD55KR.005 1000 HOUR SERVICE
CATAD55 KR2-TRH04 KR2-TRH04 TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.005 2000 HOUR SERVICE
CATAD55ENG KR2-TRH04 KR2-TRH04-ENG TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.006 REPLACE ENGINE
CATAD55ENG KR2-TRH04 KR2-TRH04-ENG TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.007 CATAD55KR.006 REPLACE TURBO
CATAD55ENG KR2-TRH04 KR2-TRH04-ENG TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.008 CATAD55KR.006 REPLACE FUEL INJECTORS
CATAD55ENG KR2-TRH04 KR2-TRH04-ENG TRUCK HAULAGE ARTICULATED CATAD55 TRH04 CATAD55KR.009 CATAD55KR.006 REPLACE WATER PUMP

* Reference: Maintenance Planner 2 - page 100


Objectives:
1 - Measure Asset useage various asset levels (Asset/Component and Sub-Compnonent)
2 - Schedule Asset (Component/Sub-Components) based on usage and last change-out (Actual End Date)
5 - Minimise the no. of Schedules per Operating Asset (i.e TRUCK - Parent Asset) to three (3) as listed below:
- 1 x BASE METER Schedule (for activities to be planned on specific meter intervals such as 250 hr PM Service, 500 hr PM Service etc)
- 1 x ACTUAL END DATE Schedule (for activities to change out components and sub-components at specific meter intervals such as Engine, Turbocharger and Injectors etc)

Question: If we want to meter TURBO we MUST have Asset Number (e.g Senario 1 = KR2-TRH004-ENG-TBO ; or Senario 2 = KR2-TRH004-TBO)
We can use either Senario 1 and Senario 2

*How does ORACLE use the meter when scheduling - when do we select "Y" in "Used In Scheduling"

Senario *Used In
1 Source Meter Meter Meter Description Asset Number
Scheduling
KR2-TRH04.M001 KR2-TRH04.M001 SMU CATAD55B TRH004 Y KR2-TRH004
KR2-TRH04.M001 KR2-TRH04.M002 SMU CATAD55B TRH004 ENG Y KR2-TRH004-ENG
KR2-TRH04.M002 KR2-TRH04.M003 SMU CATAD55B TRH004 TBO Y KR2-TRH004-ENG-TBO
KR2-TRH04.M002 KR2-TRH04.M004 SMU CATAD55B TRH004 INJ Y KR2-TRH004-ENG-INJ
KR2-TRH04.M002 KR2-TRH04.M005 SMU CATAD55B TRH004 PPW Y KR2-TRH004-ENG-COOL-WPUMP

Senario *Used In
2 Source Meter Meter Meter Description Asset Number
Scheduling
KR2-TRH04.M001 KR2-TRH04.M001 SMU CATAD55B TRH004 Y KR2-TRH04
KR2-TRH04.M001 KR2-TRH04.M002 SMU CATAD55B TRH004 ENG Y KR2-TRH04-ENG
KR2-TRH04.M002 KR2-TRH04.M003 SMU CATAD55B TRH004 TBO Y KR2-TRH04-INJ
KR2-TRH04.M002 KR2-TRH04.M004 SMU CATAD55B TRH004 INJ Y KR2-TRH04-TBO
KR2-TRH04.M002 KR2-TRH04.M005 SMU CATAD55B TRH004 PPW Y KR2-TRH04-PPW

Reference: Maintenance Planner 2 - Page 35


Objectives:
5 - Minimise the no. of Schedules per Operating Asset (i.e TRUCK - Parent Asset) to three (3) as listed below:
- 1 x BASE DATE Schedule (for Calendar based activities such as Daily Inspections and 3 Monthly AFFF Inspections)

We use BASE DATE for calendar based activities such as Daily Inspection (every 1 Day) and Fire Suppression System Inspections (evey 90 days);
Senario Activities are to be associated with the KR2-TRH004;
Question:
1 Use Meter KR2-TRH004.M001; and
Use one schedule KR2-TRH004.S001

Senario Used In Activity Interval Date Base Interval


1 Source Meter Meter Meter Description Asset Number Suppression Activity Description Schedule Name Schedule Name Asset Number PM Usage
Scheduling Number Multiple
KR2-TRH04.M001 KR2-TRH04.M001 SMU CATAD55B TRH004 Y KR2-TRH004 CATAD55KR.001 1 DAILY INSPECTION KR2-TRH04.S001 KR2-TRH04.S001 KR2-TRH004 BASE DATE 1
KR2-TRH004 CATAD55KR.010 90 AFFF SYSTEM INSPECTION KR2-TRH04.S001

Reference: Maintenance Planner 2 - Page 105


Objectives:
5 - Minimise the no. of Schedules per Operating Asset (i.e TRUCK - Parent Asset) to three (3) as listed below:
- 1 x BASE METER Schedule (for activities to be planned on specific meter intervals such as 250 hr PM Service, 500 hr PM Service etc)

We use BASE METER for activities such as PM Services that need to be done on a specific hour interval;
Activities are to be associated with the KR2-TRH004;
Senario Use Meter KR2-TRH004.M001; and
Question: 1 Use one schedule KR2-TRH004.S002

PLEASE NOTE: Senario 1 only works when asset levels are the same (as per example 250/500/100/2000 HOUR SERVICES); otherwise NO Suppression across asset levels

Base Meter Meter Name Meter


Senario Used In Activity
1 Source Meter Meter Meter Description Asset Number Suppression Activity Description Schedule Name Schedule Name Asset Number PM Usage Base
Scheduling Number
Interval
KR2-TRH04.M001 KR2-TRH04.M001 SMU CATAD55B TRH004 Y KR2-TRH004 KR2-TRH04.S002 KR2-TRH004 BASE METER KR2-TRH04.M001 SMU CATAD55B TRH04 250
KR2-TRH004 CATAD55KR.002 CATAD55KR.003 1 250 HOUR SERVICE KR2-TRH04.S002
KR2-TRH004 CATAD55KR.003 CATAD55KR.004 2 500 HOUR SERVICE KR2-TRH04.S002
KR2-TRH004 CATAD55KR.004 CATAD55KR.005 4 1000 HOUR SERVICE KR2-TRH04.S002
KR2-TRH004 CATAD55KR.005 8 2000 HOUR SERVICE KR2-TRH04.S002

Reference: Maintenance Planner 2 - Page 116


Objectives:
1 - Measure Asset useage various asset levels (Asset/Component and Sub-Compnonent)
2 - Schedule Asset (Component/Sub-Components) based on usage and last change-out (Actual End Date)
3 - Suppress Asset Activities across different asset levels (Parent/Child)
4 - Track COST at different asset levels (Parent/Child) based on incedences of Asset Activities (No. of times activities are performed)
5 - Minimise the no. of Schedules per Operating Asset (i.e TRUCK - Parent Asset) to three (3) as listed below:
- 1 x ACTUAL END DATE Schedule (for activities to change out components and sub-components at specific meter intervals such as Engine, Turbocharger and Injectors etc)

We use ACTUAL END DATE for activities such as ENGINE changeout that need to be done at specific hour interval;
Senario Activities are to be associated with the various asset levels (e.g KR2-TRH004-ENG-TBO)
Question: 1 Can we use the Source Meter KR2-TRH004.M001 as "Base Meter" for the schedule; and
Use one schedule KR2-TRH004.S003 for the whole truck

- IF we use parent meter ("Source Meter") for the "Base Meter" within the Schedule, will the Child Meters ("Meter")still be used for Scheduling (i.e in the case when the Component/Sub-Component has been changed out - outside schedule/interval multiple)
- How does ORACLE use meters for scheduling; and When do we select "Y" for "Used In Schedule"

Base Meter Meter Name Meter


Senario Used In Activity Interval
1 Source Meter Meter Meter Description Asset Number Suppression Activity Description Schedule Name Schedule Name Asset Number PM Usage Base
Scheduling Number Multiple
Interval
KR2-TRH04.M001 KR2-TRH04.M001 SMU CATAD55B TRH004 Y KR2-TRH004 KR2-TRH04.S003 KR2-TRH004 ACTUAL END DATE KR2-TRH04.M001 SMU CATAD55B TRH04 250
KR2-TRH04.M001 KR2-TRH04.M002 SMU CATAD55B TRH004 ENG Y KR2-TRH004-ENG CATAD55KR.006 40 REPLACE ENGINE KR2-TRH04.S003
KR2-TRH04.M002 KR2-TRH04.M003 SMU CATAD55B TRH004 TBO Y KR2-TRH004-ENG-TBO CATAD55KR.007 CATAD55KR.006 20 REPLACE TURBO KR2-TRH04.S003
KR2-TRH04.M002 KR2-TRH04.M004 SMU CATAD55B TRH004 INJ Y KR2-TRH004-ENG-INJ CATAD55KR.008 CATAD55KR.006 20 REPLACE FUEL INJECTORS KR2-TRH04.S003
KR2-TRH04.M002 KR2-TRH04.M005 SMU CATAD55B TRH004 PPW Y KR2-TRH004-ENG-COOL-WPUMP CATAD55KR.009 CATAD55KR.006 20 REPLACE WATER PUMP KR2-TRH04.S003

We use ACTUAL END DATE for activities such as ENGINE changeout that need to be done at specific hour interval;
Senario Activities are to be associated with the various asset levels (e.g KR2-TRH004-TBO)
Question: 2 PLEASE NOTE: Senario 2 has INJ and ENG at same asset level to allow for suppressions;
Can we use use the Source Meter KR2-TRH004.M001 as "Base Meter"; and
Use one schedule KR2-TRH004.S003

- IF we use parent meter ("Source Meter") for the "Base Meter" within the Schedule, will the Child Meters ("Meter")still be used for Scheduling (i.e in the case when the Component/Sub-Component has been changed out - outside schedule/interval multiple)
- How does ORACLE use meters for scheduling; and When do we select "Y" for "Used In Schedule"

Base Meter Meter Name Meter


Senario Used In Activity Interval
2 Source Meter Meter Meter Description Asset Number Suppression Activity Description Schedule Name Schedule Name Asset Number PM Usage Base
Scheduling Number Multiple
Interval
KR2-TRH04.M001 KR2-TRH04.M001 SMU CATAD55B TRH004 Y KR2-TRH04 KR2-TRH04.S003 KR2-TRH004 ACTUAL END DATE KR2-TRH04.M001 SMU CATAD55B TRH04 250
KR2-TRH04.M001 KR2-TRH04.M002 SMU CATAD55B TRH004 ENG Y KR2-TRH04-ENG CATAD55KR.006 40 REPLACE ENGINE KR2-TRH04.S003
KR2-TRH04.M002 KR2-TRH04.M003 SMU CATAD55B TRH004 TBO Y KR2-TRH04-INJ CATAD55KR.007 CATAD55KR.006 20 REPLACE TURBO KR2-TRH04.S003
KR2-TRH04.M002 KR2-TRH04.M004 SMU CATAD55B TRH004 INJ Y KR2-TRH04-TBO CATAD55KR.008 CATAD55KR.006 20 REPLACE FUEL INJECTORS KR2-TRH04.S003
KR2-TRH04.M002 KR2-TRH04.M005 SMU CATAD55B TRH004 PPW Y KR2-TRH04-PPW CATAD55KR.009 CATAD55KR.006 20 REPLACE WATER PUMP KR2-TRH04.S003
We use ACTUAL END DATE for activities such as ENGINE changeout that need to be done at specific hour interval;
Senario Activities are to be associated with one asset level (e.g KR2-TRH004-ENG)
Question: 3 PLEASE NOTE: Senario 3 does not have asset numbers for INJ, just associates all activities with the ENG to allow for suppressions;
Can we use use the Source Meter KR2-TRH004.M001 as "Base Meter"; and
Use one schedule KR2-TRH004.S003

- IF we use Parent (Source Meter) for Schedule, will the Child Meters still be used for Scheduling (i.e in the case when the Component/Sub-Component has been changed out -
outside schedule/interval multiple)
- How does ORACLE use meters for scheduling; and When do we select "Y" for "Used In Schedule"

Base Meter Meter Name Meter


Senario Used In Activity Interval
3 Source Meter Meter Meter Description Asset Number Suppression Activity Description Schedule Name Schedule Name Asset Number PM Usage Base
Scheduling Number Multiple
Interval
KR2-TRH04.M001 KR2-TRH04.M001 SMU CATAD55B TRH004 Y KR2-TRH04 KR2-TRH04.S003 KR2-TRH004 ACTUAL END DATE KR2-TRH04.M001 SMU CATAD55B TRH04 250
KR2-TRH04.M001 KR2-TRH04.M002 SMU CATAD55B TRH004 ENG Y KR2-TRH04-ENG CATAD55KR.006 40 REPLACE ENGINE KR2-TRH04.S003
KR2-TRH04.M002 KR2-TRH04.M003 SMU CATAD55B TRH004 TBO Y KR2-TRH04-ENG CATAD55KR.007 CATAD55KR.006 20 REPLACE TURBO KR2-TRH04.S003
KR2-TRH04.M002 KR2-TRH04.M004 SMU CATAD55B TRH004 INJ Y KR2-TRH04-ENG CATAD55KR.008 CATAD55KR.006 20 REPLACE FUEL INJECTORS KR2-TRH04.S003
KR2-TRH04.M002 KR2-TRH04.M005 SMU CATAD55B TRH004 PPW Y KR2-TRH04-ENG CATAD55KR.009 CATAD55KR.006 20 REPLACE WATER PUMP KR2-TRH04.S003

We use ACTUAL END DATE for activities such as ENGINE changeout that need to be done at specific hour interval;
Senario Activities are to be associated with the various asset levels (e.g KR2-TRH004-ENG-TBO)
Question: 1.1 Can we use use the Source Meter KR2-TRH004.M001 as "Base Meter"; and
Use one schedule KR2-TRH004.S003
- IF we cannot use Parent (Source Meter) for Schedule, will we need to do schedule for each meter (Children)
- How does ORACLE use meters for scheduling; and When do we select "Y" for "Used In Schedule"

Base Meter Meter Name Meter


Senario Used In Activity Interval
1.1 Source Meter Meter Meter Description Asset Number Suppression Activity Description Schedule Name Schedule Name Asset Number PM Usage Base
Scheduling Number Multiple
Interval
KR2-TRH04.M001 KR2-TRH04.M002 SMU CATAD55B TRH004 ENG Y KR2-TRH004-ENG CATAD55KR.006 40 REPLACE ENGINE KR2-TRH04.S003 KR2-TRH04.S003 KR2-TRH004-ENG ACTUAL END DATE KR2-TRH04.M002 SMU CATAD55B TRH04 250
KR2-TRH04.M002 KR2-TRH04.M003 SMU CATAD55B TRH004 TBO Y KR2-TRH004-ENG-TBO CATAD55KR.007 CATAD55KR.006 20 REPLACE TURBO KR2-TRH04.S004 KR2-TRH04.S004 KR2-TRH004-ENG-TBO ACTUAL END DATE KR2-TRH04.M003 SMU CATAD55B TRH04 250
KR2-TRH04.M002 KR2-TRH04.M004 SMU CATAD55B TRH004 INJ Y KR2-TRH004-ENG-INJ CATAD55KR.008 CATAD55KR.006 20 REPLACE FUEL INJECTORS KR2-TRH04.S005 KR2-TRH04.S005 KR2-TRH004-ENG-INJ ACTUAL END DATE KR2-TRH04.M004 SMU CATAD55B TRH04 250
KR2-TRH04.M002 KR2-TRH04.M005 SMU CATAD55B TRH004 PPW Y KR2-TRH004-ENG-COOL-WPUMP CATAD55KR.009 CATAD55KR.006 20 REPLACE WATER PUMP KR2-TRH04.S006 KR2-TRH04.S006 KR2-TRH004-ENG-COOL-WPUMP ACTUAL END DATE KR2-TRH04.M005 SMU CATAD55B TRH04 250

We use ACTUAL END DATE for activities such as ENGINE changeout that need to be done at specific hour interval;
Activities are to be associated with the various asset levels (e.g KR2-TRH004-TBO)
Senario PLEASE NOTE: Senario 2 has INJ and ENG at same asset level to allow for suppressions;
Question: 2.1 Can we use use the Source Meter KR2-TRH004.M001 as "Base Meter"; and
Use one schedule KR2-TRH004.S003

- IF we use Parent (Source Meter) for Schedule, will the Child Meters still be used for Scheduling (i.e in the case when the Component/Sub-Component has been changed out -
outside schedule/interval multiple)
- How does ORACLE use meters for scheduling; and When do we select "Y" for "Used In Schedule"

Base Meter Meter Name Meter


Senario Used In Activity Interval
2.1 Source Meter Meter Meter Description Asset Number Suppression Activity Description Schedule Name Schedule Name Asset Number PM Usage Base
Scheduling Number Multiple
Interval
KR2-TRH04.M001 KR2-TRH04.M002 SMU CATAD55B TRH004 ENG Y KR2-TRH04-ENG CATAD55KR.006 40 REPLACE ENGINE KR2-TRH04.S003 KR2-TRH04.S003 KR2-TRH04-ENG ACTUAL END DATE KR2-TRH04.M002 SMU CATAD55B TRH04 250
KR2-TRH04.M002 KR2-TRH04.M003 SMU CATAD55B TRH004 TBO Y KR2-TRH04-INJ CATAD55KR.007 CATAD55KR.006 20 REPLACE TURBO KR2-TRH04.S004 KR2-TRH04.S004 KR2-TRH04-INJ ACTUAL END DATE KR2-TRH04.M003 SMU CATAD55B TRH04 250
KR2-TRH04.M002 KR2-TRH04.M004 SMU CATAD55B TRH004 INJ Y KR2-TRH04-TBO CATAD55KR.008 CATAD55KR.006 20 REPLACE FUEL INJECTORS KR2-TRH04.S005 KR2-TRH04.S005 KR2-TRH04-TBO ACTUAL END DATE KR2-TRH04.M004 SMU CATAD55B TRH04 250
KR2-TRH04.M002 KR2-TRH04.M005 SMU CATAD55B TRH004 PPW Y KR2-TRH04-PPW CATAD55KR.009 CATAD55KR.006 20 REPLACE WATER PUMP KR2-TRH04.S006 KR2-TRH04.S006 KR2-TRH04-PPW ACTUAL END DATE KR2-TRH04.M005 SMU CATAD55B TRH04 250

Reference: Maintenance Planner 2 - Page 123