Sie sind auf Seite 1von 6

VAISHALI AUTO INDUSTRIES

Daily( JH ) Check Sheet


CLIA ( Cleaning, Lubrication, Inspection & Adjustment)
Machine Code :- Month/Year :-
Machine Name:- band shaw machine Dept. :- Production
SR. Area Date
no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
clean the machine
1
मशशिन शक्लिशननिंग .
Blade Tension
2
ब्ललेड टलेन् सन चलेक करले.
Greasing all Points of Lubrication
3
जरुरर जगह पले शग्रिशसनिंग ग् करले.

No abnormal sounds in machine.

4
शकशस शभि प्रककार कका अब्ननोमर्मल आवकाज नशह हनोशन हह .

Nut and Bolt to be Tighting before start


the machine if required.
5
सशभि जरुरर बनोल्त ओर नट टकाईट करर.

Time Taken CLIA checking { in minutes}

Operator Sign :-

Supervisor Sign :-

Remark :-

Work done = P , Work postpone = P , Holiday = H


FORMAT NO.: FM/MNT/02 Rev:00 Date:1/1/2019
VAISHALI AUTO INDUSTRIES
Daily( JH ) Check Sheet
CLIA ( Cleaning, Lubrication, Inspection & Adjustment)
Machine Code :- Month/Year :-
Machine Name:- Induction Machine Dept. :- Production
SR. Area Date
no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
clean the machine
1
मशशिन शक्लिशननिंग .
check the water leakage in the panel.
2
पलेन ल मर पकाननी कका लनीकले ज चलेक करले. |
check the D.M Water pressure and Temp.
3
D.M टरक मर पकाननी कका प्रलेस र चलेक करले |

Ensure outler temp. 35° From Dm Water


circulation system.
4
DM वकाटर टरक कका टलेम् परलेच र 35° ससुश नशशचत करर |

Maintain water levelof 50 Ltr in DM tank


5
डनीएम टटैंक मर जल स्तर 50 लनीटर बनकाए रखर |

Time Taken CLIA checking { in minutes}

Operator Sign :-

Supervisor Sign :-

Remark :-

Work done = P , Work postpone = P , Holiday = H


FORMAT NO.: FM/MNT/02 Rev:00 Date:1/1/2019
VAISHALI AUTO INDUSTRIES
Daily( JH ) Check Sheet
CLIA ( Cleaning, Lubrication, Inspection & Adjustment)
Machine Code :- Month/Year :-
Machine Name:- Screw Press Machine Dept. :- Production
SR. Area Date
no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
clean the machine
1
मशशिन शक्लिशननिंग .
Lubrication on slide.
2
स्लकाइड पले ओइल सले लसुश ब्रिकले सन करले.
Greasing all Points of Lubrication
3
जरुरर जगह पले शग्रिशसनिंग ग् करले.

No abnormal sounds in machine.

4
शकशस शभि प्रककार कका अब्ननोमर्मल आवकाज नशह हनोशन हह .

सशभि जरुरर बनोल्त ओर नट टकाईट करर.


5 Nut and Bolt to be Tighting before start
the machine if required.

Time Taken CLIA checking { in minutes}

Operator Sign :-

Supervisor Sign :-

Remark :-

Work done = P , Work postpone = P , Holiday = H


FORMAT NO.: FM/MNT/02 Rev:00 Date:1/1/2019
VAISHALI AUTO INDUSTRIES
Daily( JH ) Check Sheet
CLIA ( Cleaning, Lubrication, Inspection & Adjustment)
Machine Code :- Month/Year :-
Machine Name:- Triming Press Machine Dept. :- Production
SR. Area Date
no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
clean the machine
1
मशशिन शक्लिशननिंग .
Lubrication on slide.
2
स्लकाइड पले ओइल सले लसुश ब्रिकले सन करले.
Greasing all Points of Lubrication
3
जरुरर जगह पले शग्रिशसनिंग ग् करले.

No abnormal sounds in machine.

4
शकशस शभि प्रककार कका अब्ननोमर्मल आवकाज नशह हनोशन हह .

सशभि जरुरर बनोल्त ओर नट टकाईट करर.


5 Nut and Bolt to be Tighting before start
the machine if required.

Time Taken CLIA checking { in minutes}

Operator Sign :-

Supervisor Sign :-

Remark :-

Work done = P , Work postpone = P , Holiday = H


FORMAT NO.: FM/MNT/02 Rev:00 Date:1/1/2019
VAISHALI AUTO INDUSTRIES
Daily( JH ) Check Sheet
CLIA ( Cleaning, Lubrication, Inspection & Adjustment)
Machine Code :- Month/Year :-
Machine Name:- Normalizing machine Dept. :- Production
SR. Area Date
no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
clean the machine
1
मशशिन शक्लिशननिंग |
ALL MOTOR SHAFTS
2
सभिनी मनोटर शिकाफ्ट
ALL FURNACE DOORS
3
सभिनी फनर्नेस कले दरवकाजले

No abnormal sounds in machine.

4
शकशस शभि प्रककार कका अब्ननोमर्मल आवकाज नशह हनोशन हह |

सशभि जरुरर बनोल्त ओर नट टकाईट करर |


5 Nut and Bolt to be Tighting before start
the machine if required.

Time Taken CLIA checking { in minutes}

Operator Sign :-

Supervisor Sign :-

Remark :-

Work done = P , Work postpone = P , Holiday = H


FORMAT NO.: FM/MNT/02 Rev:00 Date:1/1/2019
VAISHALI AUTO INDUSTRIES
Daily( JH ) Check Sheet
CLIA ( Cleaning, Lubrication, Inspection & Adjustment)
Machine Code :- Month/Year :-
Machine Name:- Shot blasting machine Dept. :- Production
SR. Area Date
no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

clean the machine


1
मशशिन शक्लिशननिंग .

No abnormal sounds in machine.


2
शकशस शभि प्रककार कका अब्ननोमर्मल आवकाज नशह हनोशन हह .

Nut and Bolt to be Tighting before start


the machine if required.
3
सशभि जरुरर बनोल्त ओर नट टकाईट करर.

Time Taken CLIA checking { in minutes}

Operator Sign :-

Supervisor Sign :-

Remark :-

Work done = P , Work postpone = P , Holiday = H


FORMAT NO.: FM/MNT/02 Rev:00 Date:1/1/2019

Das könnte Ihnen auch gefallen